← Final engineering test lesson New set →

Engineering Worksheet: Final Test

Engineering lesson 24: Final engineering test · Set 126 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🔺 A flat frame has 5 straight sides joined by loose pins at the corners. What is the least number of corner-to-corner braces needed to make it rigid?
  2. 2.📐 On a plan, 1 cm stands for 5 m. A real bridge is 100 m long. How long is it on the plan, in centimetres?
  3. 3.Which of these is reduce (use less)? (a) give old books away (b) print on both sides (c) melt glass into new jars (d) pulp old paper
  4. 4.🔍 Which is the odd one out? (a) fitting rubber base pads (b) having a wide base (c) adding steel to concrete (d) building tall and narrow
  5. 5.🏋️ A force of 410 N did 4100 J of work. How many metres did the object move?
  6. 6.⚖️ A lever bar balances. The load is 630 N at ? cm from the fulcrum. The effort is 180 N at 70 cm from the fulcrum on the other side. What is the missing distance in centimetres?
  7. 7.🧪 A paper bridge was tested three times. It held 250 g, 130 g and 310 g. What is the mean (average) load it held, in grams?
  8. 8.⚖️ A seesaw balances. Zoya (? N) sits 2 m from the pivot on one side; Meena (200 N) sits 1 m from the pivot on the other side. What is the missing weight in newtons?
  9. 9.🏚️ Three solid model towers are made of the same material. Tower A is 60 cm tall on a 10 cm wide base, tower B is 20 cm tall on a 10 cm base and tower C is 80 cm tall on a 20 cm base. Which is the hardest to tip over? (a) tower C (b) tower A (c) tower B
  10. 10.🪝 A pulley system has 2 rope sections holding up the load. To lift the load by 8 m, how many metres of rope must you pull?
  11. 11.🪝 Fixed or movable pulley: which one only changes direction? (a) a fixed pulley (b) a movable pulley
  12. 12.Which of these makes a building safer in earthquakes? (a) building tall and narrow (b) making brittle joints (c) leaving out steel bars (d) adding cross bracing
  13. 13.🤝 A team plans for 30 minutes, builds for 30 minutes and then tests for 30 minutes, one after another. How many minutes is that in all?
  14. 14.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “build it with straws”? (a) load it with coins (b) build it with straws
  15. 15.True or false: a biomedical engineer keeps data safe online. (a) True (b) False
  16. 16.🌉 A beam bridge is 400 m long. Piers split it into equal spans of 40 m. How many spans are there?
  17. 17.🦺 In the workshop, is it safe to cut away from your body? (a) safe (b) not safe
  18. 18.🌉 A beam bridge 120 m long rests on the two river banks and on piers in between, making equal spans of 40 m. How many piers are there?
  19. 19.🛞 The same block is pulled at a steady speed across four surfaces. The forces needed were: ice 2 N, a glass sheet 3 N, a wooden plank 6 N, a carpet 8 N. Which surface gave the most friction? (a) a wooden plank (b) a glass sheet (c) a carpet (d) ice
  20. 20.True or false: a tow rope on a car is in compression (pushed). (a) False (b) True
  21. 21.⚖️ Along a straight bar, measured from the left end, the effort is at 30 cm, the fulcrum at 60 cm and the load at 90 cm. Which class of lever is it? (a) class 3 (b) class 2 (c) class 1
  22. 22.🧱 Which property matters most for a hair band? (a) electrical conductor (b) flexible (c) transparent (d) waterproof
  23. 23.True or false: “the longest spans of all” is an arch bridge. (a) True (b) False
  24. 24.🤝 Is it good or poor teamwork to listen to every idea? (a) good teamwork (b) poor teamwork
  25. 25.🔧 Which tool would you use to check a shelf is level? (a) a tape measure (b) a protractor (c) sandpaper (d) a spirit level
  26. 26.Which of these is an arch bridge? (a) stones squeezed together (b) deck hangs from cables (c) a rope bridge in hills (d) a log across a stream
  27. 27.What does the tester do? (a) keeps the team on track (b) runs the tests (c) tracks what is used up (d) collects the supplies
  28. 28.True or false: having a wide base makes a building less safe in earthquakes. (a) False (b) True
  29. 29.♻️ A sustainable design … (a) wastes water (b) lasts one day (c) protects the future (d) uses the most plastic
  30. 30.🏚️ Three solid model towers are made of the same material. Tower A is 60 cm tall on a 30 cm wide base, tower B is 120 cm tall on a 40 cm base and tower C is 30 cm tall on a 30 cm base. Which is the easiest to tip over? (a) tower B (b) tower A (c) tower C
  31. 31.🌉 Which bridge type: “deck hangs from cables”? (a) arch bridge (b) suspension bridge (c) beam bridge
  32. 32.🏋️ In which unit is work measured? (a) watt hour (b) metre (m) (c) newton (N) (d) joule (J)
  33. 33.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
  34. 34.Which of these uses a beam? (a) an igloo (b) a lintel over a door (c) a fort gateway (d) a curved stone doorway
  35. 35.Which of these needs an electrical conductor? (a) a roof sheet (b) a switch contact (c) a yoga mat (d) a boat hull
  36. 36.🌉 Which bridge type can cross the widest gap in one span? (a) suspension bridge (b) beam bridge (c) log bridge (d) arch bridge
  37. 37.⚖️ Which class of lever is a wheelbarrow? (a) class 1 (b) class 2 (c) class 3
  38. 38.🦺 What protects your eyes when sawing or drilling? (a) sunglasses (b) a cap (c) nothing (d) safety goggles
  39. 39.🪝 A pulley system has 3 rope sections holding up the load. To lift the load by 4 m, how many metres of rope must you pull?
  40. 40.True or false: to check a shelf is level, use a spirit level. (a) False (b) True

Answer key

  1. 2
  2. 20
  3. print on both sides
  4. building tall and narrow
  5. 10
  6. 20
  7. 230
  8. 100
  9. tower B
  10. 16
  11. a fixed pulley
  12. adding cross bracing
  13. 90
  14. build it with straws
  15. False
  16. 10
  17. safe
  18. 2
  19. a carpet
  20. False
  21. class 1
  22. flexible
  23. False
  24. good teamwork
  25. a spirit level
  26. stones squeezed together
  27. runs the tests
  28. False
  29. protects the future
  30. tower B
  31. suspension bridge
  32. joule (J)
  33. good testing
  34. a lintel over a door
  35. a switch contact
  36. suspension bridge
  37. class 2
  38. safety goggles
  39. 12
  40. True

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids