← Final engineering test lesson New set →

Engineering Worksheet: Final Test

Engineering lesson 24: Final engineering test · Set 191 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🔺 One side of a straw bridge is a row of 10 triangles standing point-up and point-down in turn, each sharing a side with the next. How many straws does it use?
  2. 2.Which of these is in tension (pulled)? (a) a swing chain (b) a pillar under a roof (c) a temple column (d) a stone in an arch
  3. 3.True or false: a fixed pulley stays in one place. (a) True (b) False
  4. 4.🤝 In a design team, who collects the supplies? (a) tester (b) team leader (c) recorder (d) materials manager
  5. 5.📐 On a plan, 1 cm stands for 5 m. A wall is 18 cm long on the plan. How long is the real wall, in metres?
  6. 6.What does the tester do? (a) keeps the design notes (b) puts the model together (c) collects the supplies (d) runs the tests
  7. 7.🧱 Which material is best for a cooking pot handle? (a) aluminium (b) copper (c) iron (d) wood or plastic
  8. 8.🛠️ Engineers use maths and which other subject the most? (a) dance (b) music (c) cooking (d) science
  9. 9.True or false: an aerospace engineer designs car engines. (a) True (b) False
  10. 10.Which of these is caused by magnetic force? (a) lifting a school bag (b) pedalling a cycle (c) a fridge magnet sticks (d) rain falls to the ground
  11. 11.True or false: using a light roof makes a building less safe in earthquakes. (a) True (b) False
  12. 12.True or false: to think of wild ideas is the Create step. (a) True (b) False
  13. 13.Which of these is a screw? (a) the tip of a nail (b) a chisel (c) a wheelchair ramp (d) a bottle cap
  14. 14.True or false: to own up to a mistake is good teamwork. (a) True (b) False
  15. 15.🪢 Tension or compression: a tow rope on a car? (a) compression (b) tension
  16. 16.🔍 Which is the odd one out? (a) test it only once (b) use a new load each time (c) hide a failed test (d) record every result
  17. 17.🪢 A sign weighing 450 N hangs from 3 identical vertical ropes that share the load equally. What is the tension in each rope, in newtons?
  18. 18.♻️ A sustainable design … (a) lasts one day (b) protects the future (c) uses the most plastic (d) wastes water
  19. 19.Which job does a biomedical engineer do? (a) runs a fertiliser plant (b) writes app software (c) designs a metro tunnel (d) builds hospital scanners
  20. 20.Which of these uses triangles? (a) a slab over a canal (b) a truss bridge side (c) a plank over a drain (d) a lintel over a door
  21. 21.🧪 Is it good or poor testing to record every result? (a) poor testing (b) good testing
  22. 22.True or false: “deck hangs from cables” is an arch bridge. (a) True (b) False
  23. 23.🏋️ Pushing a crate 8 m took 640 J of work. What force was used, in newtons?
  24. 24.🛞 Is friction helpful or a problem here: brakes stopping a cycle? (a) helpful (b) a problem
  25. 25.🏋️ In which unit is work measured? (a) metre (m) (b) joule (J) (c) newton (N) (d) watt hour
  26. 26.💪 Which force is at work: a compass needle turns? (a) muscular force (b) magnetic force (c) friction (d) gravity
  27. 27.True or false: to listen to every idea is good teamwork. (a) True (b) False
  28. 28.🏋️ Pushing a crate 7 m took 1190 J of work. What force was used, in newtons?
  29. 29.🔺 One side of a straw bridge is a row of 13 triangles standing point-up and point-down in turn, each sharing a side with the next. How many straws does it use?
  30. 30.🏋️ Mechanical advantage (MA) = … (a) load × effort (b) load + effort (c) load ÷ effort (d) effort ÷ load
  31. 31.Which of these is a screw? (a) a well-bucket rope wheel (b) a screw jack (c) a crowbar (d) a claw hammer on a nail
  32. 32.True or false: “the simplest bridge” is a beam bridge. (a) False (b) True
  33. 33.🔢 To follow the engineering design process, which comes first: “Ask” or “Create”? (a) Ask (b) Create
  34. 34.True or false: drawing up a well bucket is a pull. (a) False (b) True
  35. 35.📐 On a plan, 1 cm stands for 20 m. A wall is 14 cm long on the plan. How long is the real wall, in metres?
  36. 36.Which of these is caused by gravity? (a) an apple falls down (b) a magnet picks up pins (c) brakes stop a bicycle (d) rubbing hands warms them
  37. 37.🧑‍🔧 Which kind of engineer designs car engines? (a) aerospace (b) civil (c) biomedical (d) mechanical
  38. 38.📋 For a model bridge challenge, is “roll at least 2 metres” a constraint or a criterion? (a) a criterion (b) a constraint
  39. 39.🔺 A flat frame has 9 straight sides joined by loose pins at the corners. What is the least number of corner-to-corner braces needed to make it rigid?
  40. 40.True or false: a wheelbarrow is a class 3 lever (effort in the middle). (a) False (b) True

Answer key

  1. 21
  2. a swing chain
  3. True
  4. materials manager
  5. 90
  6. runs the tests
  7. wood or plastic
  8. science
  9. False
  10. a fridge magnet sticks
  11. False
  12. False
  13. a bottle cap
  14. True
  15. tension
  16. record every result
  17. 150
  18. protects the future
  19. builds hospital scanners
  20. a truss bridge side
  21. good testing
  22. False
  23. 80
  24. helpful
  25. joule (J)
  26. magnetic force
  27. True
  28. 170
  29. 27
  30. load ÷ effort
  31. a screw jack
  32. True
  33. Ask
  34. True
  35. 280
  36. an apple falls down
  37. mechanical
  38. a criterion
  39. 6
  40. False

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids