Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.True or false: to fix the weak part is the Test step. (a) False (b) True
- 2.🪝 What does a single fixed pulley change? (a) the size of the load (b) gravity (c) the colour of rope (d) the direction of pull
- 3.🪢 Tension or compression: a temple column? (a) compression (b) tension
- 4.🦺 How should you carry scissors? (a) by the blades (b) while running (c) points down, closed (d) points up, open
- 5.⚙️ A screw is really … (a) a ramp wrapped round (b) a kind of wheel (c) a bent lever (d) a tiny pulley
- 6.Which need does a solar panel meet? (a) make power from sunlight (b) carry many people far (c) keep food fresh longer (d) reach a top floor fast
- 7.⚖️ A seesaw balances. Meena (? N) sits 3 m from the pivot on one side; Ravi (330 N) sits 3 m from the pivot on the other side. What is the missing weight in newtons?
- 8.🏋️ In which unit is work measured? (a) metre (m) (b) joule (J) (c) watt hour (d) newton (N)
- 9.🛞 More or less friction: sand on a slippery path? (a) less friction (b) more friction
- 10.💪 Two children push a box to the right, one with 55 N and the other with 60 N. What is the net (total) force on the box, in newtons?
- 11.🛞 The same block is pulled at a steady speed across four surfaces. The forces needed were: sandpaper 9 N, a glass sheet 1 N, a wooden plank 4 N, a carpet 8 N. How many newtons more were needed on sandpaper than on a glass sheet?
- 12.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to sell them at once (c) to test ideas cheaply (d) to decorate a room
- 13.Which of these is a beam bridge? (a) a flat deck on piers (b) the longest spans of all (c) a rope bridge in hills (d) cables tied down at ends
- 14.💪 Is kicking a football a push or a pull? (a) a pull (b) a push
- 15.♻️ A project report has 62 pages. How many sheets of paper are needed if it is printed on both sides of each sheet?
- 16.True or false: to test it only once is poor testing. (a) True (b) False
- 17.🛞 Is friction helpful or a problem here: brakes stopping a cycle? (a) helpful (b) a problem
- 18.Which of these happens in the Ask step? (a) check it against goals (b) define the problem (c) draw a labelled diagram (d) pick the build order
- 19.Which of these is a lever? (a) a crowbar (b) a crane hook block (c) a bottle cap (d) a door stopper
- 20.True or false: to define the problem is the Plan step. (a) False (b) True
- 21.Which job is a hand drill for? (a) make a hole in wood (b) tighten a nut (c) drive in a nail (d) cut a wooden plank
- 22.True or false: wind is a non-renewable energy source. (a) True (b) False
- 23.♻️ A school bench is made from 300 recycled plastic bottles. How many benches can be made from 1500 bottles?
- 24.True or false: a civil engineer builds rockets. (a) True (b) False
- 25.⚖️ Along a straight bar, measured from the left end, the effort is at 20 cm, the fulcrum at 30 cm and the load at 60 cm. Which class of lever is it? (a) class 2 (b) class 3 (c) class 1
- 26.🔍 Which is the odd one out? (a) roll at least 2 metres (b) finish in 40 minutes (c) use only paper and tape (d) fit on a school desk
- 27.⚖️ A seesaw balances. Meena (360 N) sits ? m from the pivot on one side; Zoya (120 N) sits 3 m from the pivot on the other side. What is the missing distance in metres?
- 28.🧪 In a fair test, how many things do you change at a time? (a) two (b) none (c) all of them (d) one
- 29.🧑🔧 Which branch of engineering works on aeroplanes and rockets? (a) computer (b) civil (c) aerospace (d) chemical
- 30.♻️ A school bench is made from 150 recycled plastic bottles. How many benches can be made from 1200 bottles?
- 31.🧪 A paper bridge was tested three times. It held 210 g, 110 g and 220 g. What is the mean (average) load it held, in grams?
- 32.🤝 In a design team, who keeps the team on track? (a) tester (b) team leader (c) builder (d) materials manager
- 33.🪝 Fixed or movable pulley: which one halves the effort? (a) a fixed pulley (b) a movable pulley
- 34.Which job is pliers for? (a) smooth a rough edge (b) grip and bend wire (c) turn a screw (d) drive in a nail
- 35.🧑🔧 Which branch of engineering designs buildings, roads and bridges? (a) chemical (b) biomedical (c) civil (d) computer
- 36.True or false: a tent guy rope is in compression (pushed). (a) False (b) True
- 37.🌉 Which bridge type can cross the widest gap in one span? (a) log bridge (b) arch bridge (c) suspension bridge (d) beam bridge
- 38.🏋️ A machine lifts a load of 540 N when you push with 90 N. What is its mechanical advantage (MA)?
- 39.🤝 A team plans for 30 minutes, builds for 20 minutes and then tests for 20 minutes, one after another. How many minutes is that in all?
- 40.🏚️ Does having a wide base make a building safer or less safe in an earthquake? (a) safer in earthquakes (b) less safe
Answer key
- False
- the direction of pull
- compression
- points down, closed
- a ramp wrapped round
- make power from sunlight
- 330
- joule (J)
- more friction
- 115
- 8
- to test ideas cheaply
- a flat deck on piers
- a push
- 31
- True
- helpful
- define the problem
- a crowbar
- False
- make a hole in wood
- False
- 5
- False
- class 1
- roll at least 2 metres
- 1
- one
- aerospace
- 8
- 180
- team leader
- a movable pulley
- grip and bend wire
- civil
- False
- suspension bridge
- 6
- 70
- safer in earthquakes
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids