Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.📋 For a model bridge challenge, is “spend at most ₹100” a constraint or a criterion? (a) a criterion (b) a constraint
- 2.True or false: to tighten a nut, use a spanner. (a) False (b) True
- 3.🧪 Why repeat a test three times? (a) the first is wrong (b) to use more paper (c) it looks busy (d) to get reliable results
- 4.🪢 A sign weighing 30 N hangs from 3 identical vertical ropes that share the load equally. What is the tension in each rope, in newtons?
- 5.📐 On a plan, 1 cm stands for 2 m. A real bridge is 34 m long. How long is it on the plan, in centimetres?
- 6.🤝 A team plans for 45 minutes, builds for 15 minutes and then tests for 20 minutes, one after another. How many minutes is that in all?
- 7.🔍 Which is the odd one out? (a) use the same load (b) repeat each test (c) measure the same way (d) guess, do not measure
- 8.🔺 A flat frame has 6 straight sides joined by loose pins at the corners. What is the least number of corner-to-corner braces needed to make it rigid?
- 9.📋 For a model bridge challenge, is “fit on a school desk” a constraint or a criterion? (a) a criterion (b) a constraint
- 10.🤝 In a design team, who cuts and joins parts? (a) materials manager (b) team leader (c) tester (d) builder
- 11.📋 Criterion: the model bridge must hold at least 300 g. In the test it held 300 g. Does it meet the criterion? (a) No (b) Yes
- 12.🔧 Which tool would you use to measure a long length? (a) a screwdriver (b) a tape measure (c) a spirit level (d) a spanner
- 13.Which of these is reduce (use less)? (a) refill a water bottle (b) switch off unused lights (c) use a jar as a pen stand (d) plant in old tyres
- 14.📐 How many metres are in 1 kilometre? (a) 10 (b) 10000 (c) 1000 (d) 100
- 15.🧑🔧 Which branch of engineering designs buildings, roads and bridges? (a) biomedical (b) chemical (c) computer (d) civil
- 16.🏋️ A force of 400 N pushes a cart 8 m along the floor. How much work is done, in joules?
- 17.⚙️ Which simple machine is a well winch handle? (a) lever (b) wedge (c) wheel and axle (d) inclined plane
- 18.Which of these is in tension (pulled)? (a) a brick at a wall base (b) a stretched rubber band (c) a stone in an arch (d) a pillar under a roof
- 19.Which of these is made by engineers? (a) a waterfall (b) a banyan tree (c) a bicycle (d) a rainbow
- 20.🧪 Is it good or poor testing to guess, do not measure? (a) poor testing (b) good testing
- 21.True or false: a chemical engineer designs factory machines. (a) True (b) False
- 22.True or false: using a light roof makes a building less safe in earthquakes. (a) True (b) False
- 23.🔢 To follow the engineering design process, which comes first: “Plan” or “Improve”? (a) Plan (b) Improve
- 24.Which of these is a beam bridge? (a) deck hangs from cables (b) cables tied down at ends (c) tall towers hold cables (d) the simplest bridge
- 25.🔄 Is the engineering design process done only once? (a) no, it repeats (b) only on Sundays (c) yes, only once (d) only for big jobs
- 26.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) yes, it works (b) yes, always (c) only if it is red (d) no, it breaks a limit
- 27.🏚️ Where should heavy water tanks go in a quake zone? (a) low down (b) hanging outside (c) on a thin pole (d) on the very top
- 28.💪 Which can a force NOT do? (a) stop it moving (b) change its colour (c) change its shape (d) start it moving
- 29.True or false: to run while holding tools is not safe. (a) True (b) False
- 30.📐 A beam is 330 cm long. How long is it in metres? =
- 31.⚖️ Which class of lever is a wheelbarrow? (a) class 2 (b) class 3 (c) class 1
- 32.⚖️ Along a straight bar, measured from the left end, the effort is at 20 cm, the fulcrum at 30 cm and the load at 10 cm. Which class of lever is it? (a) class 1 (b) class 2 (c) class 3
- 33.🌉 Which bridge type can cross the widest gap in one span? (a) log bridge (b) arch bridge (c) suspension bridge (d) beam bridge
- 34.🔺 A flat frame has 8 straight sides joined by loose pins at the corners. What is the least number of corner-to-corner braces needed to make it rigid?
- 35.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) read the challenge rules (b) strengthen the weak part (c) sketch three ideas (d) build it with straws
- 36.⚖️ A seesaw balances. Zoya (? N) sits 1 m from the pivot on one side; Asha (160 N) sits 1 m from the pivot on the other side. What is the missing weight in newtons?
- 37.🤝 A teammate’s idea seems odd. What should you do first? (a) laugh at it (b) listen and ask why (c) ignore it (d) walk away
- 38.🧪 What is a prototype? (a) a broken part (b) the final product (c) an early test model (d) a sales poster
- 39.🛞 The same block is pulled at a steady speed across four surfaces. The forces needed were: a carpet 8 N, sandpaper 11 N, ice 1 N, a wooden plank 4 N. Which surface gave the most friction? (a) sandpaper (b) ice (c) a wooden plank (d) a carpet
- 40.📐 On a plan, 1 cm stands for 5 m. A wall is 15 cm long on the plan. How long is the real wall, in metres?
Answer key
- a constraint
- True
- to get reliable results
- 10
- 17
- 80
- guess, do not measure
- 3
- a constraint
- builder
- Yes
- a tape measure
- switch off unused lights
- 1000
- civil
- 3200
- wheel and axle
- a stretched rubber band
- a bicycle
- poor testing
- False
- False
- Plan
- the simplest bridge
- no, it repeats
- no, it breaks a limit
- low down
- change its colour
- True
- 3.3
- class 2
- class 3
- suspension bridge
- 5
- build it with straws
- 160
- listen and ask why
- an early test model
- sandpaper
- 75
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids