Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🏚️ What do engineers use to test models of buildings for earthquakes? (a) a microscope (b) a telescope (c) a shake table (d) a fridge
- 2.💪 In a tug of war, one team pulls left with 40 N and the other pulls right with 30 N. What is the size of the net force, in newtons?
- 3.🧪 Is it good or poor testing to test it only once? (a) poor testing (b) good testing
- 4.🔍 Which is the odd one out? (a) record every result (b) use the same load (c) test it only once (d) change only one thing
- 5.Which of these uses triangles? (a) a plank over a drain (b) a curved stone doorway (c) a bicycle frame (d) an old stone bridge
- 6.🪢 Tension or compression: a tall bridge tower? (a) tension (b) compression
- 7.📋 Criteria are … (a) the team names (b) the tools you use (c) the limits on money (d) goals a design must meet
- 8.📐 On a plan, 1 cm stands for 20 m. A real bridge is 240 m long. How long is it on the plan, in centimetres?
- 9.⚖️ A lever bar balances. The load is ? N at 10 cm from the fulcrum. The effort is 40 N at 50 cm from the fulcrum on the other side. What is the missing force in newtons?
- 10.⚖️ Along a straight bar, measured from the left end, the effort is at 30 cm, the fulcrum at 60 cm and the load at 0 cm. Which class of lever is it? (a) class 2 (b) class 1 (c) class 3
- 11.💪 In which unit do we measure force? (a) second (s) (b) metre (m) (c) litre (L) (d) newton (N)
- 12.📐 On a plan, 1 cm stands for 5 m. A real bridge is 20 m long. How long is it on the plan, in centimetres?
- 13.🏚️ Does fitting rubber base pads make a building safer or less safe in an earthquake? (a) safer in earthquakes (b) less safe
- 14.⚖️ In a class 3 lever, what is in the middle? (a) the pulley (b) the effort (c) the load (d) the fulcrum
- 15.🦺 What protects your eyes when sawing or drilling? (a) safety goggles (b) nothing (c) sunglasses (d) a cap
- 16.True or false: closing a drawer is a push. (a) True (b) False
- 17.🔺 A frame shaped like a square is made of straws joined by loose pins, with 0 corner-to-corner braces. Is it rigid or wobbly? (a) wobbly (b) rigid
- 18.True or false: a movable pulley halves the effort. (a) False (b) True
- 19.True or false: “stand in a fan breeze” is a criterion (a goal). (a) False (b) True
- 20.♻️ Is sunlight a renewable or a non-renewable energy source? (a) renewable (b) non-renewable
- 21.📋 Your team’s budget is ₹28. You must buy one roll of tape for ₹10. Straws cost ₹2 each. What is the greatest number of straws you can buy?
- 22.🛞 Why are tyres made with deep treads? (a) to go slower (b) to grip the road (c) to look nice (d) to save rubber
- 23.🏚️ Why are flexible joints good in an earthquake? (a) they are cheap (b) they bend, not break (c) they stop shaking (d) they look nice
- 24.🤝 Why do engineers work in teams? (a) to argue more (b) to finish nothing (c) many skills and ideas (d) to work alone
- 25.📋 For a model bridge challenge, is “finish in 40 minutes” a constraint or a criterion? (a) a criterion (b) a constraint
- 26.⚖️ A seesaw balances. Kabir (? N) sits 4 m from the pivot on one side; Zoya (760 N) sits 3 m from the pivot on the other side. What is the missing weight in newtons?
- 27.🏚️ Three solid model towers are made of the same material. Tower A is 10 cm tall on a 10 cm wide base, tower B is 60 cm tall on a 30 cm base and tower C is 40 cm tall on a 10 cm base. Which is the hardest to tip over? (a) tower C (b) tower A (c) tower B
- 28.🔍 Which is the odd one out? (a) keep ice for 1 hour (b) carry 10 coins (c) lift a cup of water (d) fit on a school desk
- 29.📋 Criterion: the model bridge must hold at least 600 g. In the test it held 500 g. Does it meet the criterion? (a) Yes (b) No
- 30.What does the builder do? (a) shares out the jobs (b) collects the supplies (c) cuts and joins parts (d) keeps the team on track
- 31.🧪 A paper bridge was tested three times. It held 260 g, 170 g and 170 g. What is the mean (average) load it held, in grams?
- 32.⚖️ A seesaw balances. Zoya (180 N) sits 1 m from the pivot on one side; Asha (? N) sits 1 m from the pivot on the other side. What is the missing weight in newtons?
- 33.🏚️ Why is a wide base safer? (a) it is harder to tip over (b) it is taller (c) it is lighter (d) it is colourful
- 34.🏚️ Does adding steel to concrete make a building safer or less safe in an earthquake? (a) less safe (b) safer in earthquakes
- 35.True or false: “tall towers hold cables” is a suspension bridge. (a) False (b) True
- 36.True or false: a roof sheet needs a transparent material. (a) False (b) True
- 37.True or false: an electrical engineer wires a new building. (a) False (b) True
- 38.💪 Which force pulls everything towards the Earth? (a) magnetism (b) wind (c) friction (d) gravity
- 39.🔺 One side of a straw bridge is a row of 11 triangles standing point-up and point-down in turn, each sharing a side with the next. How many straws does it use?
- 40.🔍 Which is the odd one out? (a) a flagpole rope wheel (b) a crane hook block (c) a well-bucket rope wheel (d) a water tap handle
Answer key
- a shake table
- 10
- poor testing
- test it only once
- a bicycle frame
- compression
- goals a design must meet
- 12
- 200
- class 3
- newton (N)
- 4
- safer in earthquakes
- the effort
- safety goggles
- True
- wobbly
- True
- True
- renewable
- 9
- to grip the road
- they bend, not break
- many skills and ideas
- a constraint
- 570
- tower A
- fit on a school desk
- No
- cuts and joins parts
- 200
- 180
- it is harder to tip over
- safer in earthquakes
- True
- False
- True
- gravity
- 23
- a water tap handle
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids