Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.📐 On a plan, 1 cm stands for 10 m. A real bridge is 150 m long. How long is it on the plan, in centimetres?
- 2.⚖️ Which class of lever is a pair of kitchen tongs? (a) class 2 (b) class 3 (c) class 1
- 3.🔍 Which is the odd one out? (a) a mobile phone (b) a water filter (c) a satellite (d) a volcano
- 4.🌉 Which bridge type: “the longest spans of all”? (a) arch bridge (b) suspension bridge (c) beam bridge
- 5.Which of these is found in nature? (a) a waterfall (b) a railway track (c) a lift (d) a dam
- 6.🏋️ A force of 450 N did 4500 J of work. How many metres did the object move?
- 7.🧪 A paper bridge was tested three times. It held 340 g, 270 g and 230 g. What is the mean (average) load it held, in grams?
- 8.🏋️ A 19 kg box is lifted straight up by 1 m. Taking 1 kg to weigh about 10 N, how much work is done, in joules?
- 9.🛞 The same block is pulled at a steady speed across four surfaces. The forces needed were: a wooden plank 3 N, a carpet 4 N, sandpaper 5 N, ice 1 N. How many newtons more were needed on sandpaper than on ice?
- 10.🧱 Which material is best for a window pane? (a) wood (b) brick (c) steel (d) glass
- 11.⚖️ On a seesaw, a heavier child should sit … (a) farther from the pivot (b) on the pivot (c) closer to the pivot (d) anywhere
- 12.True or false: a civil engineer designs aeroplane wings. (a) True (b) False
- 13.True or false: “carry 10 coins” is a constraint (a limit). (a) False (b) True
- 14.🤝 How do engineers share a design with others? (a) secret notes (b) clear labelled sketches (c) only talking fast (d) no drawings at all
- 15.True or false: plucking a mango is a pull. (a) False (b) True
- 16.🔄 What is the FIRST step of the engineering design process? (a) Create (b) Ask (c) Test (d) Improve
- 17.Which of these uses a dome? (a) a shelf on two brackets (b) a roof truss (c) a round palace roof (d) a bicycle frame
- 18.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) strengthen the weak part (b) build it with straws (c) load it with coins (d) read the challenge rules
- 19.📋 Constraint: the tower must be no taller than 50 cm. The team’s tower is 44 cm tall. Is it within the constraint? (a) Yes (b) No
- 20.What does the team leader do? (a) tracks what is used up (b) shares out the jobs (c) checks the goals are met (d) writes down results
- 21.⚖️ A seesaw balances. Meena (260 N) sits ? m from the pivot on one side; Zoya (130 N) sits 2 m from the pivot on the other side. What is the missing distance in metres?
- 22.Which job is sandpaper for? (a) check a shelf is level (b) drive in a nail (c) smooth a rough edge (d) cut a wooden plank
- 23.🪢 A concrete slab weighing 24000 N rests evenly on 8 identical pillars. What compression force does each pillar carry, in newtons?
- 24.True or false: a car seat belt needs a waterproof material. (a) True (b) False
- 25.🪢 Compression is a force that … (a) makes light (b) cools things (c) pushes or squeezes (d) pulls or stretches
- 26.🧑🔧 Which kind of engineer designs aeroplane wings? (a) chemical (b) aerospace (c) mechanical (d) biomedical
- 27.💪 Two children push a box to the right, one with 5 N and the other with 85 N. What is the net (total) force on the box, in newtons?
- 28.🌉 A beam bridge is 270 m long. Piers split it into equal spans of 45 m. How many spans are there?
- 29.🧱 Which property matters most for a raincoat? (a) electrical conductor (b) waterproof (c) transparent (d) flexible
- 30.True or false: wind is a renewable energy source. (a) False (b) True
- 31.🔍 Which is the odd one out? (a) a brick at a wall base (b) a pillar under a roof (c) a table leg (d) a tent guy rope
- 32.🤝 A team plans for 15 minutes, builds for 50 minutes and then tests for 5 minutes, one after another. How many minutes is that in all?
- 33.🔍 Which is the odd one out? (a) a squeezed spring (b) a suspension cable (c) a crane lifting cable (d) a swing chain
- 34.🧪 Three prototype bridges were tested with the same method. Design A held 100 g, design B held 150 g and design C held 200 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 35.🧪 A paper bridge was tested three times. It held 260 g, 170 g and 80 g. What is the mean (average) load it held, in grams?
- 36.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
- 37.True or false: a fixed pulley stays in one place. (a) True (b) False
- 38.🧱 Which material is best for the bars inside concrete? (a) glass (b) plastic (c) rubber (d) steel
- 39.True or false: to listen to every idea is poor teamwork. (a) True (b) False
- 40.True or false: an aerospace engineer designs aeroplane wings. (a) True (b) False
Answer key
- 15
- class 3
- a volcano
- suspension bridge
- a waterfall
- 10
- 280
- 190
- 4
- glass
- closer to the pivot
- False
- False
- clear labelled sketches
- True
- Ask
- a round palace roof
- build it with straws
- Yes
- shares out the jobs
- 1
- smooth a rough edge
- 3000
- False
- pushes or squeezes
- aerospace
- 90
- 6
- waterproof
- True
- a tent guy rope
- 70
- a squeezed spring
- design A
- 170
- good testing
- True
- steel
- False
- True
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids