Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🛠️ Is a bridge made by engineers or found in nature? (a) made by engineers (b) found in nature
  2. 2.🔄 Which design-process step is it to list the materials? (a) Ask (b) Plan (c) Imagine (d) Test
  3. 3.True or false: a chemical engineer builds a website. (a) True (b) False
  4. 4.🛞 Friction acts … (a) only upwards (b) with the motion (c) against the motion (d) only on ice
  5. 5.🔺 Which strong shape does a crane arm use? (a) arch (b) beam (c) dome (d) triangle
  6. 6.🔺 Which strong shape does a slab over a canal use? (a) dome (b) beam (c) triangle (d) arch
  7. 7.Which of these is a pulley? (a) a nutcracker (b) a well-bucket rope wheel (c) a wood screw (d) a water tap handle
  8. 8.📐 How many millimetres are in 1 centimetre? (a) 5 (b) 10 (c) 1000 (d) 100
  9. 9.🤝 In a design team, who keeps the design notes? (a) tester (b) recorder (c) materials manager (d) team leader
  10. 10.🪝 A load of 450 N hangs from a pulley system in which 3 rope sections hold up the load. What effort is needed, in newtons? (ideal pulleys)
  11. 11.Which of these is a screw? (a) a seesaw (b) a chisel (c) a flagpole rope wheel (d) a bottle cap
  12. 12.True or false: “deck hangs from cables” is an arch bridge. (a) False (b) True
  13. 13.⚖️ A seesaw balances. Arjun (140 N) sits 3 m from the pivot on one side; Meena (? N) sits 1 m from the pivot on the other side. What is the missing weight in newtons?
  14. 14.🧑‍🔧 Which kind of engineer designs bicycle gears? (a) chemical (b) biomedical (c) mechanical (d) civil
  15. 15.🏚️ Why is a wide base safer? (a) it is colourful (b) it is taller (c) it is lighter (d) it is harder to tip over
  16. 16.True or false: pulling a cart is a push. (a) True (b) False
  17. 17.🌉 A beam bridge is 360 m long. Piers split it into equal spans of 40 m. How many spans are there?
  18. 18.🏋️ Mechanical advantage (MA) = … (a) load × effort (b) effort ÷ load (c) load ÷ effort (d) load + effort
  19. 19.🧪 The first prototype held 300 g. After the team improved it, the new prototype held 380 g. How many more grams did it hold?
  20. 20.♻️ Is biogas from waste a renewable or a non-renewable energy source? (a) renewable (b) non-renewable
  21. 21.Which of these is a beam bridge? (a) a curve under the deck (b) tall towers hold cables (c) a flat deck on piers (d) a rope bridge in hills
  22. 22.🤝 A team of 2 shares 4 equal jobs fairly. Each job takes 8 minutes. How many minutes does each person work?
  23. 23.True or false: “use only paper and tape” is a criterion (a goal). (a) True (b) False
  24. 24.📋 Constraint: the tower must be no taller than 70 cm. The team’s tower is 76 cm tall. Is it within the constraint? (a) Yes (b) No
  25. 25.📋 For a model bridge challenge, is “use only paper and tape” a constraint or a criterion? (a) a constraint (b) a criterion
  26. 26.Which of these needs a transparent material? (a) a boat hull (b) a hair band (c) a spectacle lens (d) a skipping rope
  27. 27.🔧 Which tool would you use to cut a wooden plank? (a) a spirit level (b) pliers (c) a saw (d) a spanner
  28. 28.Which of these is recycle (make new things)? (a) carry a cloth bag (b) switch off unused lights (c) plant in old tyres (d) melt glass into new jars
  29. 29.🔺 Why can an arch carry heavy loads? (a) it bends easily (b) it works in compression (c) it is very light (d) it is hollow
  30. 30.🪢 Tension or compression: a suspension cable? (a) compression (b) tension
  31. 31.True or false: a screw jack is an inclined plane. (a) True (b) False
  32. 32.💪 A cart is pulled to the right with 30 N and to the left with 40 N. Which way does the net force act? (a) to the left (b) no net force (c) to the right
  33. 33.💪 Is kicking a football a push or a pull? (a) a push (b) a pull
  34. 34.📐 On a plan, 1 cm stands for 20 m. A real bridge is 140 m long. How long is it on the plan, in centimetres?
  35. 35.💪 Is hitting a cricket ball a push or a pull? (a) a push (b) a pull
  36. 36.True or false: to check a shelf is level, use a spirit level. (a) False (b) True
  37. 37.⚖️ Along a straight bar, measured from the left end, the effort is at 0 cm, the fulcrum at 20 cm and the load at 60 cm. Which class of lever is it? (a) class 3 (b) class 2 (c) class 1
  38. 38.🔢 To follow the engineering design process, which comes first: “Imagine” or “Plan”? (a) Imagine (b) Plan
  39. 39.⚖️ A seesaw balances. Asha (? N) sits 4 m from the pivot on one side; Kabir (680 N) sits 2 m from the pivot on the other side. What is the missing weight in newtons?
  40. 40.⚖️ A seesaw balances. Asha (180 N) sits ? m from the pivot on one side; Ravi (360 N) sits 1 m from the pivot on the other side. What is the missing distance in metres?

Answer key

  1. made by engineers
  2. Plan
  3. False
  4. against the motion
  5. triangle
  6. beam
  7. a well-bucket rope wheel
  8. 10
  9. recorder
  10. 150
  11. a bottle cap
  12. False
  13. 420
  14. mechanical
  15. it is harder to tip over
  16. False
  17. 9
  18. load ÷ effort
  19. 80
  20. renewable
  21. a flat deck on piers
  22. 16
  23. False
  24. No
  25. a constraint
  26. a spectacle lens
  27. a saw
  28. melt glass into new jars
  29. it works in compression
  30. tension
  31. False
  32. to the left
  33. a push
  34. 7
  35. a push
  36. True
  37. class 1
  38. Imagine
  39. 340
  40. 2