← Final engineering test lesson New set →

Engineering Worksheet: Final Test

Engineering lesson 24: Final engineering test · Set 921 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🔄 In which step do engineers draw a labelled diagram? (a) Test (b) Ask (c) Improve (d) Plan
  2. 2.📐 On a plan, 1 cm stands for 20 m. A wall is 18 cm long on the plan. How long is the real wall, in metres?
  3. 3.🏋️ A force of 30 N did 210 J of work. How many metres did the object move?
  4. 4.🏚️ Does fitting rubber base pads make a building safer or less safe in an earthquake? (a) less safe (b) safer in earthquakes
  5. 5.📋 Constraint: the tower must be no taller than 60 cm. The team’s tower is 64 cm tall. Is it within the constraint? (a) No (b) Yes
  6. 6.🔍 Which is the odd one out? (a) keep ice for 1 hour (b) float for 1 minute (c) hold up 500 g (d) spend at most ₹100
  7. 7.🛠️ Is a banyan tree made by engineers or found in nature? (a) found in nature (b) made by engineers
  8. 8.True or false: flowing river water is a non-renewable energy source. (a) True (b) False
  9. 9.🧑‍🔧 Which kind of engineer writes app software? (a) civil (b) mechanical (c) computer (d) aerospace
  10. 10.True or false: the core of a wire needs an electrical conductor. (a) False (b) True
  11. 11.🧱 Is dry wood an electrical conductor or an insulator? (a) an insulator (b) a conductor
  12. 12.True or false: a temple column is in tension (pulled). (a) False (b) True
  13. 13.True or false: a well winch handle is a wheel and axle. (a) True (b) False
  14. 14.🌉 Which bridge type: “the simplest bridge”? (a) arch bridge (b) beam bridge (c) suspension bridge
  15. 15.🛠️ People need to go through a mountain. Which invention helps? (a) a telephone (b) a water filter (c) a solar panel (d) a tunnel
  16. 16.💪 Which force is at work: a rolling ball slows? (a) muscular force (b) friction (c) gravity (d) magnetic force
  17. 17.⚖️ A lever bar balances. The load is ? N at 40 cm from the fulcrum. The effort is 280 N at 90 cm from the fulcrum on the other side. What is the missing force in newtons?
  18. 18.🤝 Is it good or poor teamwork to talk over others? (a) poor teamwork (b) good teamwork
  19. 19.Which job does a mechanical engineer do? (a) designs bicycle gears (b) designs electric motors (c) lays out a highway (d) plans a dam
  20. 20.💪 Two children push a box to the right, one with 70 N and the other with 60 N. What is the net (total) force on the box, in newtons?
  21. 21.🧪 In a fair test, how many things do you change at a time? (a) none (b) one (c) two (d) all of them
  22. 22.True or false: natural gas is a non-renewable energy source. (a) False (b) True
  23. 23.🤝 Is it good or poor teamwork to help a stuck teammate? (a) good teamwork (b) poor teamwork
  24. 24.🤝 Is it good or poor teamwork to ignore the team plan? (a) good teamwork (b) poor teamwork
  25. 25.📋 Your team’s budget is ₹97. You must buy one roll of tape for ₹5. Straws cost ₹3 each. What is the greatest number of straws you can buy?
  26. 26.True or false: to ask who will use it is the Plan step. (a) False (b) True
  27. 27.📋 A constraint is … (a) a goal for success (b) a final test (c) a kind of glue (d) a limit you must keep to
  28. 28.⚖️ A seesaw balances. Ravi (? N) sits 4 m from the pivot on one side; Zoya (760 N) sits 4 m from the pivot on the other side. What is the missing weight in newtons?
  29. 29.⚙️ A screw is really … (a) a bent lever (b) a tiny pulley (c) a ramp wrapped round (d) a kind of wheel
  30. 30.True or false: a lift helps people store water for summer. (a) True (b) False
  31. 31.🏋️ A force of 10 N did 30 J of work. How many metres did the object move?
  32. 32.🔍 Which is the odd one out? (a) finish in 40 minutes (b) fit on a school desk (c) stand in a fan breeze (d) be under 30 cm tall
  33. 33.Which job does a chemical engineer do? (a) designs a flyover (b) designs bicycle gears (c) makes medicines in bulk (d) builds hospital scanners
  34. 34.Which job does a biomedical engineer do? (a) builds hospital scanners (b) wires a new building (c) designs a metro tunnel (d) designs satellites
  35. 35.🪝 Fixed or movable pulley: which one makes you pull 2× rope? (a) a movable pulley (b) a fixed pulley
  36. 36.📐 A beam is 730 cm long. How long is it in metres? =
  37. 37.🔢 To follow the engineering design process, what comes right after “Plan”? (a) Improve (b) Test (c) Create (d) Imagine
  38. 38.Which of these uses a beam? (a) a truss bridge side (b) a fort gateway (c) a plank over a drain (d) a roof truss
  39. 39.🤝 In a design team, who keeps the design notes? (a) recorder (b) tester (c) team leader (d) builder
  40. 40.📋 Constraint: the tower must be no taller than 40 cm. The team’s tower is 34 cm tall. Is it within the constraint? (a) No (b) Yes

Answer key

  1. Plan
  2. 360
  3. 7
  4. safer in earthquakes
  5. No
  6. spend at most ₹100
  7. found in nature
  8. False
  9. computer
  10. True
  11. an insulator
  12. False
  13. True
  14. beam bridge
  15. a tunnel
  16. friction
  17. 630
  18. poor teamwork
  19. designs bicycle gears
  20. 130
  21. one
  22. True
  23. good teamwork
  24. poor teamwork
  25. 30
  26. False
  27. a limit you must keep to
  28. 760
  29. a ramp wrapped round
  30. False
  31. 3
  32. stand in a fan breeze
  33. makes medicines in bulk
  34. builds hospital scanners
  35. a movable pulley
  36. 7.3
  37. Create
  38. a plank over a drain
  39. recorder
  40. Yes

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids