← Final engineering test lesson New set →

Engineering Worksheet: Final Test

Engineering lesson 24: Final engineering test · Set 972 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🔺 Which shape keeps its shape best when its corners are pinned? (a) square (b) rectangle (c) triangle (d) hexagon
  2. 2.♻️ Is diesel a renewable or a non-renewable energy source? (a) non-renewable (b) renewable
  3. 3.🤝 In a design team, who collects the supplies? (a) materials manager (b) tester (c) recorder (d) builder
  4. 4.🧱 Is glass an electrical conductor or an insulator? (a) a conductor (b) an insulator
  5. 5.True or false: “use only paper and tape” is a criterion (a goal). (a) True (b) False
  6. 6.True or false: natural gas is a renewable energy source. (a) True (b) False
  7. 7.True or false: making brittle joints makes a building safer in earthquakes. (a) True (b) False
  8. 8.🔍 Which is the odd one out? (a) a stretched rubber band (b) a squeezed spring (c) a tug of war rope (d) a crane lifting cable
  9. 9.Which job is a tape measure for? (a) smooth a rough edge (b) cut a wooden plank (c) check a shelf is level (d) measure a long length
  10. 10.🧱 Which material is best for a window pane? (a) brick (b) glass (c) wood (d) steel
  11. 11.Which of these is a beam bridge? (a) cables tied down at ends (b) the simplest bridge (c) a curve under the deck (d) deck hangs from cables
  12. 12.True or false: “lift a cup of water” is a constraint (a limit). (a) False (b) True
  13. 13.💪 Which force is at work: pedalling a cycle? (a) friction (b) muscular force (c) magnetic force (d) gravity
  14. 14.⚖️ A lever bar balances. The load is 160 N at 30 cm from the fulcrum. The effort is ? N at 80 cm from the fulcrum on the other side. What is the missing force in newtons?
  15. 15.🪝 Fixed or movable pulley: which one hangs on the rope loop? (a) a fixed pulley (b) a movable pulley
  16. 16.🧱 Which material is best for a cooking pot handle? (a) iron (b) wood or plastic (c) copper (d) aluminium
  17. 17.🔺 One side of a straw bridge is a row of 10 triangles standing point-up and point-down in turn, each sharing a side with the next. How many straws does it use?
  18. 18.🧱 Which property matters most for a skipping rope? (a) waterproof (b) heat insulator (c) electrical conductor (d) flexible
  19. 19.🤝 In a design team, who runs the tests? (a) recorder (b) materials manager (c) builder (d) tester
  20. 20.♻️ Is natural gas a renewable or a non-renewable energy source? (a) renewable (b) non-renewable
  21. 21.What does the builder do? (a) puts the model together (b) runs the tests (c) shares out the jobs (d) tracks what is used up
  22. 22.🪢 A concrete slab weighing 3600 N rests evenly on 6 identical pillars. What compression force does each pillar carry, in newtons?
  23. 23.Which need does a bridge meet? (a) reach a top floor fast (b) keep food fresh longer (c) cross a wide river (d) carry many people far
  24. 24.⚖️ A seesaw balances. Zoya (100 N) sits 1 m from the pivot on one side; Kabir (100 N) sits ? m from the pivot on the other side. What is the missing distance in metres?
  25. 25.💪 A box weighs 470 N. Taking 1 kg to weigh about 10 N, what is its mass in kilograms?
  26. 26.🌉 In a stone arch bridge, the stones are in … (a) tension (b) friction (c) no force (d) compression
  27. 27.True or false: an aerospace engineer designs aeroplane wings. (a) False (b) True
  28. 28.🧪 A paper bridge was tested three times. It held 330 g, 200 g and 340 g. What is the mean (average) load it held, in grams?
  29. 29.True or false: biogas from waste is a renewable energy source. (a) True (b) False
  30. 30.🏋️ Pushing a crate 7 m took 910 J of work. What force was used, in newtons?
  31. 31.🤝 A team plans for 55 minutes, builds for 35 minutes and then tests for 10 minutes, one after another. How many minutes is that in all?
  32. 32.True or false: a mechanical engineer designs bicycle gears. (a) False (b) True
  33. 33.Which job does a chemical engineer do? (a) wires a new building (b) designs power lines (c) designs hearing aids (d) designs a paint factory
  34. 34.⚖️ A seesaw balances. Ravi (480 N) sits 1 m from the pivot on one side; Kabir (? N) sits 3 m from the pivot on the other side. What is the missing weight in newtons?
  35. 35.🔢 To follow the engineering design process, which comes first: “Imagine” or “Ask”? (a) Ask (b) Imagine
  36. 36.🧑‍🔧 Which kind of engineer designs a paint factory? (a) electrical (b) biomedical (c) mechanical (d) chemical
  37. 37.🌉 Which bridge type: “deck hangs from cables”? (a) arch bridge (b) suspension bridge (c) beam bridge
  38. 38.Which of these is an arch bridge? (a) tall towers hold cables (b) a curve under the deck (c) deck hangs from cables (d) a flat deck on piers
  39. 39.⚖️ Going along a lever from one end to the other, the order is: effort, load, fulcrum. Which class of lever is it? (a) class 1 (b) class 3 (c) class 2
  40. 40.🤝 Why do engineers work in teams? (a) to work alone (b) to finish nothing (c) many skills and ideas (d) to argue more

Answer key

  1. triangle
  2. non-renewable
  3. materials manager
  4. an insulator
  5. False
  6. False
  7. False
  8. a squeezed spring
  9. measure a long length
  10. glass
  11. the simplest bridge
  12. False
  13. muscular force
  14. 60
  15. a movable pulley
  16. wood or plastic
  17. 21
  18. flexible
  19. tester
  20. non-renewable
  21. puts the model together
  22. 600
  23. cross a wide river
  24. 1
  25. 47
  26. compression
  27. True
  28. 290
  29. True
  30. 130
  31. 100
  32. True
  33. designs a paint factory
  34. 160
  35. Ask
  36. chemical
  37. suspension bridge
  38. a curve under the deck
  39. class 2
  40. many skills and ideas

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids