← Part 1 test: what engineers do lesson New set →

Engineering Worksheet: Part 1 Test

Engineering lesson 8: Part 1 test: what engineers do · Set 25 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🧪 What is a prototype? (a) a broken part (b) the final product (c) an early test model (d) a sales poster
  2. 2.Which need does a fridge meet? (a) keep food fresh longer (b) reach a top floor fast (c) carry many people far (d) talk to someone far away
  3. 3.True or false: to measure the same way is poor testing. (a) False (b) True
  4. 4.What does the recorder do? (a) shares out the jobs (b) keeps the team on track (c) keeps the design notes (d) puts the model together
  5. 5.🤝 Is it good or poor teamwork to share the work fairly? (a) poor teamwork (b) good teamwork
  6. 6.🤝 How do engineers share a design with others? (a) no drawings at all (b) clear labelled sketches (c) only talking fast (d) secret notes
  7. 7.🔄 Which design-process step is it to check it against goals? (a) Imagine (b) Create (c) Improve (d) Test
  8. 8.True or false: a water filter helps people make water safe to drink. (a) False (b) True
  9. 9.📋 For a model bridge challenge, is “lift a cup of water” a constraint or a criterion? (a) a criterion (b) a constraint
  10. 10.📋 Your team’s budget is ₹108. You must buy one roll of tape for ₹10. Straws cost ₹5 each. What is the greatest number of straws you can buy?
  11. 11.True or false: an aerospace engineer builds rockets. (a) False (b) True
  12. 12.True or false: to record every result is good testing. (a) True (b) False
  13. 13.🧪 The first prototype held 50 g. After the team improved it, the new prototype held 220 g. How many more grams did it hold?
  14. 14.📋 Your team’s budget is ₹21. You must buy one roll of tape for ₹5. Straws cost ₹3 each. What is the greatest number of straws you can buy?
  15. 15.True or false: a mechanical engineer plans a dam. (a) True (b) False
  16. 16.True or false: to use a new load each time is poor testing. (a) True (b) False
  17. 17.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) build it with straws (b) choose and draw one (c) load it with coins (d) sketch three ideas
  18. 18.Which of these happens in the Create step? (a) draw a labelled diagram (b) measure its performance (c) define the problem (d) make a prototype
  19. 19.🤝 Why do engineers work in teams? (a) to argue more (b) to finish nothing (c) many skills and ideas (d) to work alone
  20. 20.🤝 A team plans for 20 minutes, builds for 25 minutes and then tests for 5 minutes, one after another. How many minutes is that in all?
  21. 21.📋 Your team’s budget is ₹34. You must buy one roll of tape for ₹5. Straws cost ₹4 each. What is the greatest number of straws you can buy?
  22. 22.What does the materials manager do? (a) puts the model together (b) tracks what is used up (c) keeps the design notes (d) runs the tests
  23. 23.🔍 Which is the odd one out? (a) let adults use hot glue (b) wear safety goggles (c) tie back long hair (d) use a cracked tool
  24. 24.🔄 Which design-process step is it to follow the plan to build? (a) Ask (b) Plan (c) Create (d) Imagine
  25. 25.🛠️ Is a seashell made by engineers or found in nature? (a) found in nature (b) made by engineers
  26. 26.True or false: an aerospace engineer designs power lines. (a) False (b) True
  27. 27.🔍 Which is the odd one out? (a) cut towards your hand (b) touch a hot glue tip (c) let adults use hot glue (d) use a cracked tool
  28. 28.🧪 Is it good or poor testing to skip writing results? (a) poor testing (b) good testing
  29. 29.🦺 What protects your eyes when sawing or drilling? (a) nothing (b) sunglasses (c) safety goggles (d) a cap
  30. 30.🤝 In a design team, who checks the goals are met? (a) recorder (b) materials manager (c) team leader (d) tester
  31. 31.🧑‍🔧 Which kind of engineer runs a fertiliser plant? (a) chemical (b) electrical (c) computer (d) mechanical
  32. 32.True or false: “finish in 40 minutes” is a constraint (a limit). (a) False (b) True
  33. 33.📋 For a model bridge challenge, is “use only paper and tape” a constraint or a criterion? (a) a criterion (b) a constraint
  34. 34.🔢 To follow the engineering design process, what comes right after “Imagine”? (a) Test (b) Plan (c) Improve (d) Ask
  35. 35.🧑‍🔧 Which branch of engineering designs buildings, roads and bridges? (a) computer (b) biomedical (c) civil (d) chemical
  36. 36.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) sketch three ideas (b) strengthen the weak part
  37. 37.What does the team leader do? (a) keeps the team on track (b) runs the tests (c) checks the goals are met (d) tracks what is used up
  38. 38.True or false: a chemical engineer plans a dam. (a) True (b) False
  39. 39.True or false: to make a prototype is the Create step. (a) False (b) True
  40. 40.🦺 In the workshop, is it safe to play near a moving drill? (a) not safe (b) safe

Answer key

  1. an early test model
  2. keep food fresh longer
  3. False
  4. keeps the design notes
  5. good teamwork
  6. clear labelled sketches
  7. Test
  8. True
  9. a criterion
  10. 19
  11. True
  12. True
  13. 170
  14. 5
  15. False
  16. True
  17. sketch three ideas
  18. make a prototype
  19. many skills and ideas
  20. 50
  21. 7
  22. tracks what is used up
  23. use a cracked tool
  24. Create
  25. found in nature
  26. False
  27. let adults use hot glue
  28. poor testing
  29. safety goggles
  30. tester
  31. chemical
  32. True
  33. a constraint
  34. Plan
  35. civil
  36. sketch three ideas
  37. keeps the team on track
  38. False
  39. True
  40. not safe

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids