Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🤝 A team of 2 shares 4 equal jobs fairly. Each job takes 4 minutes. How many minutes does each person work?
- 2.True or false: to tighten a nut, use a protractor. (a) False (b) True
- 3.True or false: to measure a long length, use a tape measure. (a) False (b) True
- 4.🤝 Is it good or poor teamwork to blame others for faults? (a) good teamwork (b) poor teamwork
- 5.🔍 Which is the odd one out? (a) hold up 500 g (b) keep ice for 1 hour (c) fit on a school desk (d) float for 1 minute
- 6.📋 For a model bridge challenge, is “finish in 40 minutes” a constraint or a criterion? (a) a constraint (b) a criterion
- 7.Which job does a mechanical engineer do? (a) designs a paint factory (b) lays out a highway (c) designs car engines (d) designs school networks
- 8.🧑🔧 Which kind of engineer designs satellites? (a) chemical (b) aerospace (c) computer (d) civil
- 9.🔧 Which tool would you use to make a hole in wood? (a) a screwdriver (b) a spanner (c) a hand drill (d) a protractor
- 10.🔢 To follow the engineering design process, which comes first: “Test” or “Improve”? (a) Test (b) Improve
- 11.True or false: a chemical engineer refines crude oil. (a) False (b) True
- 12.🤝 A team of 3 shares 6 equal jobs fairly. Each job takes 2 minutes. How many minutes does each person work?
- 13.🦺 How should you carry scissors? (a) by the blades (b) points down, closed (c) while running (d) points up, open
- 14.🔧 Which tool would you use to measure a long length? (a) a tape measure (b) a spanner (c) sandpaper (d) a spirit level
- 15.🧑🔧 Which kind of engineer plans a dam? (a) civil (b) mechanical (c) computer (d) biomedical
- 16.True or false: a seashell is found in nature. (a) True (b) False
- 17.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) sketch three ideas (b) strengthen the weak part
- 18.📋 Your team’s budget is ₹28. You must buy one roll of tape for ₹10. Straws cost ₹3 each. What is the greatest number of straws you can buy?
- 19.🔍 Which is the odd one out? (a) change lots at once (b) use a new load each time (c) change only one thing (d) test it only once
- 20.🔄 Which design-process step is it to dream up possible fixes? (a) Improve (b) Create (c) Test (d) Imagine
- 21.🧑🔧 Which kind of engineer designs car engines? (a) mechanical (b) biomedical (c) aerospace (d) electrical
- 22.Which job does a computer engineer do? (a) designs power lines (b) designs aeroplane wings (c) builds hospital scanners (d) designs school networks
- 23.Which of these happens in the Improve step? (a) brainstorm many ideas (b) think of wild ideas (c) make it better, retest (d) dream up possible fixes
- 24.True or false: to change lots at once is poor testing. (a) True (b) False
- 25.Which need does a lift meet? (a) keep food fresh longer (b) reach a top floor fast (c) store water for summer (d) make water safe to drink
- 26.🔢 To follow the engineering design process, which comes first: “Improve” or “Imagine”? (a) Improve (b) Imagine
- 27.Which need does a train meet? (a) make power from sunlight (b) carry many people far (c) reach a top floor fast (d) cross a wide river
- 28.What does the team leader do? (a) tracks what is used up (b) runs the tests (c) shares out the jobs (d) checks the goals are met
- 29.🔧 Which tool would you use to cut a wooden plank? (a) a hammer (b) a protractor (c) a saw (d) a hand drill
- 30.🦺 What protects your eyes when sawing or drilling? (a) safety goggles (b) sunglasses (c) nothing (d) a cap
- 31.🧑🔧 Which kind of engineer designs bicycle gears? (a) mechanical (b) chemical (c) biomedical (d) electrical
- 32.What does the builder do? (a) collects the supplies (b) keeps the team on track (c) tracks what is used up (d) puts the model together
- 33.🔍 Which is the odd one out? (a) run while holding tools (b) play near a moving drill (c) touch a hot glue tip (d) carry scissors closed
- 34.Which job does a biomedical engineer do? (a) runs a fertiliser plant (b) designs a flyover (c) lays out a highway (d) designs hearing aids
- 35.📋 Constraint: the tower must be no taller than 100 cm. The team’s tower is 106 cm tall. Is it within the constraint? (a) Yes (b) No
- 36.True or false: “use only paper and tape” is a constraint (a limit). (a) False (b) True
- 37.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 38.True or false: to measure a long length, use a spirit level. (a) False (b) True
- 39.🤝 In a design team, who keeps the team on track? (a) tester (b) materials manager (c) recorder (d) team leader
- 40.📋 Your team’s budget is ₹114. You must buy one roll of tape for ₹15. Straws cost ₹5 each. What is the greatest number of straws you can buy?
Answer key
- 8
- False
- True
- poor teamwork
- fit on a school desk
- a constraint
- designs car engines
- aerospace
- a hand drill
- Test
- True
- 4
- points down, closed
- a tape measure
- civil
- True
- sketch three ideas
- 6
- change only one thing
- Imagine
- mechanical
- designs school networks
- make it better, retest
- True
- reach a top floor fast
- Imagine
- carry many people far
- shares out the jobs
- a saw
- safety goggles
- mechanical
- puts the model together
- carry scissors closed
- designs hearing aids
- No
- True
- poor testing
- False
- team leader
- 19
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids