Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔄 In which step do engineers draw a labelled diagram? (a) Test (b) Improve (c) Plan (d) Ask
- 2.🦺 In the workshop, is it safe to let adults use hot glue? (a) not safe (b) safe
- 3.True or false: “stand in a fan breeze” is a criterion (a goal). (a) True (b) False
- 4.Which job is a spirit level for? (a) turn a screw (b) check a shelf is level (c) smooth a rough edge (d) measure a long length
- 5.📋 Criterion: the model bridge must hold at least 300 g. In the test it held 350 g. Does it meet the criterion? (a) Yes (b) No
- 6.🦺 Who should use hot glue guns and power tools in a kids’ project? (a) a stranger (b) the youngest child (c) an adult (d) any child alone
- 7.True or false: to use the same load is poor testing. (a) False (b) True
- 8.True or false: a computer engineer builds a website. (a) False (b) True
- 9.Which of these is made by engineers? (a) a river (b) a rainbow (c) a lift (d) a cloud
- 10.🔢 To follow the engineering design process, what comes right after “Create”? (a) Plan (b) Ask (c) Imagine (d) Test
- 11.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) sketch three ideas (b) build it with straws (c) load it with coins (d) choose and draw one
- 12.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “strengthen the weak part”? (a) build it with straws (b) strengthen the weak part
- 13.🤝 In a design team, who cuts and joins parts? (a) materials manager (b) recorder (c) tester (d) builder
- 14.🔄 Which design-process step is it to draw a labelled diagram? (a) Create (b) Ask (c) Improve (d) Plan
- 15.🦺 In the workshop, is it safe to play near a moving drill? (a) safe (b) not safe
- 16.🤝 A teammate’s idea seems odd. What should you do first? (a) listen and ask why (b) walk away (c) ignore it (d) laugh at it
- 17.True or false: a train helps people carry many people far. (a) False (b) True
- 18.🤝 A team of 3 shares 9 equal jobs fairly. Each job takes 5 minutes. How many minutes does each person work?
- 19.🔍 Which is the odd one out? (a) change only one thing (b) record every result (c) use a new load each time (d) use the same load
- 20.Which job is a protractor for? (a) measure an angle (b) check a shelf is level (c) tighten a nut (d) measure a long length
- 21.What does the recorder do? (a) cuts and joins parts (b) keeps the team on track (c) writes down results (d) shares out the jobs
- 22.🔄 Which design-process step is it to brainstorm many ideas? (a) Ask (b) Create (c) Imagine (d) Plan
- 23.🔄 Is the engineering design process done only once? (a) no, it repeats (b) yes, only once (c) only on Sundays (d) only for big jobs
- 24.🔄 Which design-process step is it to make it better, retest? (a) Improve (b) Test (c) Ask (d) Plan
- 25.Which job does a civil engineer do? (a) designs electric motors (b) designs car engines (c) designs a gearbox (d) plans a dam
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 360 g, design B held 260 g and design C held 310 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 27.True or false: a dam helps people go through a mountain. (a) True (b) False
- 28.🧪 Why repeat a test three times? (a) it looks busy (b) the first is wrong (c) to get reliable results (d) to use more paper
- 29.Which job is a tape measure for? (a) measure an angle (b) check a shelf is level (c) smooth a rough edge (d) measure a long length
- 30.Which job does a computer engineer do? (a) designs a paint factory (b) designs car engines (c) designs factory machines (d) builds a website
- 31.📋 Your team’s budget is ₹45. You must buy one roll of tape for ₹15. Straws cost ₹5 each. What is the greatest number of straws you can buy?
- 32.🧑🔧 Which kind of engineer designs a metro tunnel? (a) aerospace (b) electrical (c) civil (d) mechanical
- 33.True or false: “float for 1 minute” is a constraint (a limit). (a) True (b) False
- 34.True or false: a biomedical engineer plans a space mission. (a) True (b) False
- 35.🔢 To follow the engineering design process, which is the FIRST step? (a) Plan (b) Ask (c) Create (d) Imagine
- 36.True or false: to dream up possible fixes is the Plan step. (a) False (b) True
- 37.🔍 Which is the odd one out? (a) a ceiling fan (b) a waterfall (c) a railway track (d) a bicycle
- 38.🛠️ Is a volcano made by engineers or found in nature? (a) made by engineers (b) found in nature
- 39.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) yes, it works (b) no, it breaks a limit (c) yes, always (d) only if it is red
- 40.True or false: to hide a mistake is poor teamwork. (a) False (b) True
Answer key
- Plan
- safe
- True
- check a shelf is level
- Yes
- an adult
- False
- True
- a lift
- Test
- sketch three ideas
- build it with straws
- builder
- Plan
- not safe
- listen and ask why
- True
- 15
- use a new load each time
- measure an angle
- writes down results
- Imagine
- no, it repeats
- Improve
- plans a dam
- design A
- False
- to get reliable results
- measure a long length
- builds a website
- 6
- civil
- False
- False
- Ask
- False
- a waterfall
- found in nature
- no, it breaks a limit
- True
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids