Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.True or false: “finish in 40 minutes” is a criterion (a goal). (a) True (b) False
- 2.True or false: to find the limits is the Improve step. (a) False (b) True
- 3.🛠️ Which of these is a problem an engineer could solve? (a) a lost cricket match (b) a boring story (c) a sad song (d) a road that floods
- 4.🔢 To follow the engineering design process, which comes first: “Create” or “Test”? (a) Create (b) Test
- 5.🧪 Is it good or poor testing to measure the same way? (a) good testing (b) poor testing
- 6.Which job is a hammer for? (a) check a shelf is level (b) cut a wooden plank (c) smooth a rough edge (d) drive in a nail
- 7.True or false: to use a new load each time is good testing. (a) False (b) True
- 8.True or false: “fit on a school desk” is a constraint (a limit). (a) True (b) False
- 9.True or false: an aerospace engineer lays out a highway. (a) True (b) False
- 10.True or false: to touch a hot glue tip is safe. (a) False (b) True
- 11.🛠️ Is a cloud made by engineers or found in nature? (a) found in nature (b) made by engineers
- 12.🔢 To follow the engineering design process, which comes first: “Imagine” or “Test”? (a) Imagine (b) Test
- 13.🔢 To follow the engineering design process, what comes right after “Create”? (a) Plan (b) Improve (c) Test (d) Imagine
- 14.True or false: to dream up possible fixes is the Improve step. (a) False (b) True
- 15.🔄 Which design-process step is it to make a prototype? (a) Ask (b) Test (c) Create (d) Plan
- 16.🤝 Is it good or poor teamwork to listen to every idea? (a) good teamwork (b) poor teamwork
- 17.🔍 Which is the odd one out? (a) let adults use hot glue (b) touch a hot glue tip (c) run while holding tools (d) leave tools on the floor
- 18.True or false: “spend at most ₹100” is a constraint (a limit). (a) False (b) True
- 19.🧪 Why repeat a test three times? (a) to get reliable results (b) the first is wrong (c) to use more paper (d) it looks busy
- 20.🤝 Is it good or poor teamwork to own up to a mistake? (a) poor teamwork (b) good teamwork
- 21.What does the materials manager do? (a) writes down results (b) runs the tests (c) puts the model together (d) tracks what is used up
- 22.🤝 Is it good or poor teamwork to ignore the team plan? (a) poor teamwork (b) good teamwork
- 23.🤝 Is it good or poor teamwork to hide a mistake? (a) good teamwork (b) poor teamwork
- 24.🔍 Which is the odd one out? (a) roll at least 2 metres (b) lift a cup of water (c) carry 10 coins (d) use only paper and tape
- 25.📋 For a model bridge challenge, is “lift a cup of water” a constraint or a criterion? (a) a criterion (b) a constraint
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 100 g, design B held 150 g and design C held 200 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 27.🛠️ Is a dam made by engineers or found in nature? (a) found in nature (b) made by engineers
- 28.🧪 A paper bridge was tested three times. It held 270 g, 120 g and 180 g. What is the mean (average) load it held, in grams?
- 29.🧑🔧 Which kind of engineer designs satellites? (a) biomedical (b) electrical (c) mechanical (d) aerospace
- 30.Which of these happens in the Plan step? (a) try it out (b) dream up possible fixes (c) list the materials (d) brainstorm many ideas
- 31.🔍 Which is the odd one out? (a) a bicycle (b) a railway track (c) a satellite (d) a coral reef
- 32.🦺 What protects your eyes when sawing or drilling? (a) a cap (b) safety goggles (c) sunglasses (d) nothing
- 33.🤝 A teammate’s idea seems odd. What should you do first? (a) walk away (b) laugh at it (c) listen and ask why (d) ignore it
- 34.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) strengthen the weak part (b) read the challenge rules (c) load it with coins (d) choose and draw one
- 35.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “strengthen the weak part”? (a) load it with coins (b) strengthen the weak part
- 36.🔢 To follow the engineering design process, which comes first: “Plan” or “Imagine”? (a) Imagine (b) Plan
- 37.🔢 To follow the engineering design process, what comes right after “Test”? (a) Ask (b) Plan (c) Imagine (d) Improve
- 38.🤝 In a design team, who cuts and joins parts? (a) materials manager (b) team leader (c) builder (d) recorder
- 39.🔄 Is the engineering design process done only once? (a) only on Sundays (b) no, it repeats (c) only for big jobs (d) yes, only once
- 40.🤝 A team of 2 shares 12 equal jobs fairly. Each job takes 9 minutes. How many minutes does each person work?
Answer key
- False
- False
- a road that floods
- Create
- good testing
- drive in a nail
- False
- True
- False
- False
- found in nature
- Imagine
- Test
- False
- Create
- good teamwork
- let adults use hot glue
- True
- to get reliable results
- good teamwork
- tracks what is used up
- poor teamwork
- poor teamwork
- use only paper and tape
- a criterion
- design C
- made by engineers
- 190
- aerospace
- list the materials
- a coral reef
- safety goggles
- listen and ask why
- choose and draw one
- load it with coins
- Imagine
- Improve
- builder
- no, it repeats
- 54
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids