Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🤝 Is it good or poor teamwork to agree before changing? (a) poor teamwork (b) good teamwork
- 2.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 3.🤝 In a design team, who collects the supplies? (a) materials manager (b) tester (c) builder (d) team leader
- 4.🤝 Why do engineers work in teams? (a) to work alone (b) to finish nothing (c) many skills and ideas (d) to argue more
- 5.Which job is a spirit level for? (a) check a shelf is level (b) drive in a nail (c) tighten a nut (d) grip and bend wire
- 6.📋 Criterion: the model bridge must hold at least 400 g. In the test it held 250 g. Does it meet the criterion? (a) No (b) Yes
- 7.🧪 A paper bridge was tested three times. It held 440 g, 300 g and 280 g. What is the mean (average) load it held, in grams?
- 8.True or false: a seashell is found in nature. (a) True (b) False
- 9.🔍 Which is the odd one out? (a) use at most 20 straws (b) spend at most ₹100 (c) lift a cup of water (d) fit on a school desk
- 10.📋 For a model bridge challenge, is “stand in a fan breeze” a constraint or a criterion? (a) a constraint (b) a criterion
- 11.🔄 Which design-process step is it to make a prototype? (a) Ask (b) Test (c) Imagine (d) Create
- 12.Which job is a saw for? (a) drive in a nail (b) turn a screw (c) check a shelf is level (d) cut a wooden plank
- 13.🧑🔧 Which kind of engineer plans a power grid? (a) electrical (b) biomedical (c) mechanical (d) aerospace
- 14.True or false: “hold up 500 g” is a constraint (a limit). (a) True (b) False
- 15.True or false: to grip and bend wire, use a hammer. (a) True (b) False
- 16.🔧 Which tool would you use to cut a wooden plank? (a) a hammer (b) sandpaper (c) a tape measure (d) a saw
- 17.🛠️ A scientist asks “why does it happen?”. An engineer mostly asks … (a) what is for lunch? (b) who won the match? (c) how can we build it? (d) why is the sky blue?
- 18.🛠️ People need to reach a top floor fast. Which invention helps? (a) a dam (b) a train (c) a solar panel (d) a lift
- 19.True or false: to dream up possible fixes is the Plan step. (a) True (b) False
- 20.🧪 In a fair test, how many things do you change at a time? (a) all of them (b) one (c) two (d) none
- 21.🤝 In a design team, who shares out the jobs? (a) tester (b) materials manager (c) recorder (d) team leader
- 22.🦺 In the workshop, is it safe to cut away from your body? (a) safe (b) not safe
- 23.📋 For a model bridge challenge, is “spend at most ₹100” a constraint or a criterion? (a) a constraint (b) a criterion
- 24.🔍 Which is the odd one out? (a) a lift (b) a ceiling fan (c) a waterfall (d) a railway track
- 25.True or false: “finish in 40 minutes” is a criterion (a goal). (a) False (b) True
- 26.True or false: to share the work fairly is good teamwork. (a) True (b) False
- 27.🔄 Which design-process step is it to pick the build order? (a) Improve (b) Plan (c) Test (d) Imagine
- 28.🧪 Three prototype bridges were tested with the same method. Design A held 280 g, design B held 330 g and design C held 380 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 29.🦺 What protects your eyes when sawing or drilling? (a) nothing (b) safety goggles (c) sunglasses (d) a cap
- 30.🧪 The first prototype held 70 g. After the team improved it, the new prototype held 120 g. How many more grams did it hold?
- 31.🔢 To follow the engineering design process, which is the FIRST step? (a) Test (b) Create (c) Imagine (d) Ask
- 32.📋 Your team’s budget is ₹43. You must buy one roll of tape for ₹15. Straws cost ₹1 each. What is the greatest number of straws you can buy?
- 33.True or false: a volcano is found in nature. (a) True (b) False
- 34.🧪 A paper bridge was tested three times. It held 240 g, 120 g and 210 g. What is the mean (average) load it held, in grams?
- 35.True or false: a water filter is made by engineers. (a) True (b) False
- 36.True or false: to listen to every idea is poor teamwork. (a) True (b) False
- 37.True or false: a telephone helps people store water for summer. (a) True (b) False
- 38.Which of these happens in the Improve step? (a) redesign after testing (b) try it out (c) ask who will use it (d) build the model
- 39.🔍 Which is the odd one out? (a) a water filter (b) a mountain (c) a railway track (d) a bicycle
- 40.🤝 A team plans for 30 minutes, builds for 55 minutes and then tests for 15 minutes, one after another. How many minutes is that in all?
Answer key
- good teamwork
- poor testing
- materials manager
- many skills and ideas
- check a shelf is level
- No
- 340
- True
- lift a cup of water
- a criterion
- Create
- cut a wooden plank
- electrical
- False
- False
- a saw
- how can we build it?
- a lift
- False
- one
- team leader
- safe
- a constraint
- a waterfall
- False
- True
- Plan
- design C
- safety goggles
- 50
- Ask
- 28
- True
- 190
- True
- False
- False
- redesign after testing
- a mountain
- 100
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids