Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔧 Which tool would you use to smooth a rough edge? (a) sandpaper (b) pliers (c) a spirit level (d) a hammer
- 2.True or false: to skip writing results is poor testing. (a) True (b) False
- 3.Which job does an aerospace engineer do? (a) designs factory machines (b) plans a dam (c) designs satellites (d) writes app software
- 4.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “strengthen the weak part”? (a) sketch three ideas (b) strengthen the weak part
- 5.🔍 Which is the odd one out? (a) leave tools on the floor (b) touch a hot glue tip (c) run while holding tools (d) wear safety goggles
- 6.Which job does an aerospace engineer do? (a) designs bicycle gears (b) designs factory machines (c) designs artificial limbs (d) builds rockets
- 7.🔄 Which design-process step is it to measure its performance? (a) Create (b) Test (c) Imagine (d) Ask
- 8.🔢 To follow the engineering design process, what comes right after “Plan”? (a) Ask (b) Test (c) Improve (d) Create
- 9.🛠️ Which of these is a problem an engineer could solve? (a) a road that floods (b) a lost cricket match (c) a sad song (d) a boring story
- 10.True or false: a chemical engineer designs artificial limbs. (a) True (b) False
- 11.True or false: to draw a labelled diagram is the Plan step. (a) False (b) True
- 12.🔢 To follow the engineering design process, what comes right after “Test”? (a) Ask (b) Create (c) Imagine (d) Improve
- 13.True or false: a telephone helps people store water for summer. (a) True (b) False
- 14.Which need does a train meet? (a) carry many people far (b) make water safe to drink (c) talk to someone far away (d) go through a mountain
- 15.What does the recorder do? (a) keeps the design notes (b) keeps the team on track (c) checks the goals are met (d) cuts and joins parts
- 16.Which of these happens in the Create step? (a) list the materials (b) find the limits (c) follow the plan to build (d) brainstorm many ideas
- 17.🧑🔧 Which branch of engineering designs buildings, roads and bridges? (a) civil (b) computer (c) chemical (d) biomedical
- 18.🦺 What protects your eyes when sawing or drilling? (a) safety goggles (b) a cap (c) nothing (d) sunglasses
- 19.📋 Constraint: the tower must be no taller than 60 cm. The team’s tower is 54 cm tall. Is it within the constraint? (a) No (b) Yes
- 20.🔢 To build and test a straw bridge, which is the LAST step? (a) read the challenge rules (b) choose and draw one (c) sketch three ideas (d) strengthen the weak part
- 21.True or false: to cut a wooden plank, use a saw. (a) True (b) False
- 22.🔢 To follow the engineering design process, which comes first: “Ask” or “Plan”? (a) Plan (b) Ask
- 23.True or false: to skip writing results is good testing. (a) True (b) False
- 24.True or false: to turn a screw, use a screwdriver. (a) False (b) True
- 25.🔧 Which tool would you use to make a hole in wood? (a) a hand drill (b) a hammer (c) a spirit level (d) pliers
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 260 g, design B held 310 g and design C held 360 g. Which design was the weakest? (a) design C (b) design B (c) design A
- 27.🧪 Three prototype bridges were tested with the same method. Design A held 190 g, design B held 290 g and design C held 240 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 28.🧪 Three prototype bridges were tested with the same method. Design A held 320 g, design B held 370 g and design C held 270 g. Which design was the strongest? (a) design B (b) design C (c) design A
- 29.What does the tester do? (a) puts the model together (b) cuts and joins parts (c) collects the supplies (d) runs the tests
- 30.🦺 How should you carry scissors? (a) by the blades (b) points up, open (c) points down, closed (d) while running
- 31.True or false: a biomedical engineer designs knee implants. (a) True (b) False
- 32.🦺 In the workshop, is it safe to use a cracked tool? (a) safe (b) not safe
- 33.Which job does a mechanical engineer do? (a) designs car engines (b) wires a new building (c) plans a dam (d) designs knee implants
- 34.📋 For a model bridge challenge, is “carry 10 coins” a constraint or a criterion? (a) a criterion (b) a constraint
- 35.🤝 In a design team, who collects the supplies? (a) team leader (b) materials manager (c) tester (d) builder
- 36.📋 Your team’s budget is ₹37. You must buy one roll of tape for ₹5. Straws cost ₹4 each. What is the greatest number of straws you can buy?
- 37.🔢 To follow the engineering design process, which is the LAST step? (a) Plan (b) Test (c) Create (d) Improve
- 38.True or false: to cut towards your hand is safe. (a) False (b) True
- 39.Which job is a spirit level for? (a) cut a wooden plank (b) check a shelf is level (c) drive in a nail (d) tighten a nut
- 40.🔍 Which is the odd one out? (a) a waterfall (b) a banyan tree (c) a rainbow (d) a satellite
Answer key
- sandpaper
- True
- designs satellites
- sketch three ideas
- wear safety goggles
- builds rockets
- Test
- Create
- a road that floods
- False
- True
- Improve
- False
- carry many people far
- keeps the design notes
- follow the plan to build
- civil
- safety goggles
- Yes
- strengthen the weak part
- True
- Ask
- False
- True
- a hand drill
- design A
- design B
- design B
- runs the tests
- points down, closed
- True
- not safe
- designs car engines
- a criterion
- materials manager
- 8
- Improve
- False
- check a shelf is level
- a satellite
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids