Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) build it with straws (b) read the challenge rules (c) strengthen the weak part (d) choose and draw one
- 2.📋 Your team’s budget is ₹25. You must buy one roll of tape for ₹15. Straws cost ₹1 each. What is the greatest number of straws you can buy?
- 3.True or false: to make it better, retest is the Ask step. (a) False (b) True
- 4.🤝 A team plans for 25 minutes, builds for 35 minutes and then tests for 10 minutes, one after another. How many minutes is that in all?
- 5.🧪 Three prototype bridges were tested with the same method. Design A held 240 g, design B held 190 g and design C held 290 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 6.📋 Criterion: the model bridge must hold at least 800 g. In the test it held 950 g. Does it meet the criterion? (a) No (b) Yes
- 7.True or false: “carry 10 coins” is a constraint (a limit). (a) True (b) False
- 8.🔢 To follow the engineering design process, what comes right after “Plan”? (a) Create (b) Test (c) Ask (d) Imagine
- 9.📋 For a model bridge challenge, is “carry 10 coins” a constraint or a criterion? (a) a constraint (b) a criterion
- 10.True or false: “roll at least 2 metres” is a constraint (a limit). (a) True (b) False
- 11.🧑🔧 Which branch of engineering designs machines with moving parts? (a) civil (b) mechanical (c) chemical (d) biomedical
- 12.🧪 Is it good or poor testing to hide a failed test? (a) poor testing (b) good testing
- 13.🧪 A paper bridge was tested three times. It held 320 g, 170 g and 200 g. What is the mean (average) load it held, in grams?
- 14.🦺 In the workshop, is it safe to let adults use hot glue? (a) safe (b) not safe
- 15.🔢 To follow the engineering design process, which comes first: “Test” or “Create”? (a) Create (b) Test
- 16.🧪 What is a prototype? (a) a sales poster (b) the final product (c) an early test model (d) a broken part
- 17.🤝 Is it good or poor teamwork to give kind feedback? (a) good teamwork (b) poor teamwork
- 18.📋 Your team’s budget is ₹53. You must buy one roll of tape for ₹5. Straws cost ₹3 each. What is the greatest number of straws you can buy?
- 19.True or false: a civil engineer designs a metro tunnel. (a) False (b) True
- 20.🤝 A team of 3 shares 6 equal jobs fairly. Each job takes 5 minutes. How many minutes does each person work?
- 21.🤝 How do engineers share a design with others? (a) only talking fast (b) no drawings at all (c) clear labelled sketches (d) secret notes
- 22.🤝 A teammate’s idea seems odd. What should you do first? (a) listen and ask why (b) laugh at it (c) ignore it (d) walk away
- 23.True or false: an aerospace engineer designs aeroplane wings. (a) False (b) True
- 24.Which job is a spirit level for? (a) cut a wooden plank (b) drive in a nail (c) measure an angle (d) check a shelf is level
- 25.True or false: to make a hole in wood, use a spanner. (a) False (b) True
- 26.🤝 Is it good or poor teamwork to do all the work alone? (a) poor teamwork (b) good teamwork
- 27.True or false: to hide a mistake is good teamwork. (a) True (b) False
- 28.📋 For a model bridge challenge, is “fit on a school desk” a constraint or a criterion? (a) a criterion (b) a constraint
- 29.🤝 Why do engineers work in teams? (a) to finish nothing (b) to argue more (c) many skills and ideas (d) to work alone
- 30.📋 For a model bridge challenge, is “finish in 40 minutes” a constraint or a criterion? (a) a criterion (b) a constraint
- 31.🤝 In a design team, who keeps the design notes? (a) tester (b) materials manager (c) recorder (d) team leader
- 32.Which job is pliers for? (a) measure an angle (b) drive in a nail (c) measure a long length (d) grip and bend wire
- 33.🔧 Which tool would you use to turn a screw? (a) a screwdriver (b) a protractor (c) a spanner (d) a spirit level
- 34.True or false: to try it out is the Test step. (a) True (b) False
- 35.🔄 In which step do engineers draw a labelled diagram? (a) Improve (b) Ask (c) Test (d) Plan
- 36.🔧 Which tool would you use to smooth a rough edge? (a) a hammer (b) sandpaper (c) a spirit level (d) a protractor
- 37.True or false: to find the limits is the Ask step. (a) False (b) True
- 38.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) load it with coins (b) read the challenge rules (c) build it with straws (d) sketch three ideas
- 39.🧑🔧 Which kind of engineer lays out a highway? (a) electrical (b) civil (c) biomedical (d) mechanical
- 40.🔍 Which is the odd one out? (a) run while holding tools (b) wear safety goggles (c) cut away from your body (d) put tools back after use
Answer key
- choose and draw one
- 10
- False
- 70
- design C
- Yes
- False
- Create
- a criterion
- False
- mechanical
- poor testing
- 230
- safe
- Create
- an early test model
- good teamwork
- 16
- True
- 10
- clear labelled sketches
- listen and ask why
- True
- check a shelf is level
- False
- poor teamwork
- False
- a constraint
- many skills and ideas
- a constraint
- recorder
- grip and bend wire
- a screwdriver
- True
- Plan
- sandpaper
- True
- build it with straws
- civil
- run while holding tools
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids