Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔍 Which is the odd one out? (a) test it only once (b) record every result (c) use the same load (d) measure the same way
- 2.📋 Criterion: the model bridge must hold at least 400 g. In the test it held 350 g. Does it meet the criterion? (a) Yes (b) No
- 3.🧑🔧 Which branch of engineering designs machines with moving parts? (a) chemical (b) civil (c) biomedical (d) mechanical
- 4.What does the team leader do? (a) checks the goals are met (b) writes down results (c) keeps the design notes (d) keeps the team on track
- 5.🤝 In a design team, who tracks what is used up? (a) materials manager (b) tester (c) team leader (d) builder
- 6.True or false: a biomedical engineer designs artificial limbs. (a) True (b) False
- 7.True or false: to tie back long hair is not safe. (a) False (b) True
- 8.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) no, it breaks a limit (b) yes, always (c) yes, it works (d) only if it is red
- 9.🧑🔧 Which kind of engineer builds rockets? (a) chemical (b) aerospace (c) mechanical (d) biomedical
- 10.True or false: to own up to a mistake is poor teamwork. (a) False (b) True
- 11.🧪 Three prototype bridges were tested with the same method. Design A held 370 g, design B held 320 g and design C held 270 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 12.🔢 To follow the engineering design process, which is the LAST step? (a) Improve (b) Imagine (c) Plan (d) Ask
- 13.True or false: a civil engineer designs bicycle gears. (a) True (b) False
- 14.What does the builder do? (a) runs the tests (b) collects the supplies (c) writes down results (d) cuts and joins parts
- 15.🧪 A paper bridge was tested three times. It held 280 g, 100 g and 190 g. What is the mean (average) load it held, in grams?
- 16.True or false: “hold up 500 g” is a constraint (a limit). (a) True (b) False
- 17.🔍 Which is the odd one out? (a) let adults use hot glue (b) wear safety goggles (c) run while holding tools (d) clamp wood before sawing
- 18.🛠️ People need to talk to someone far away. Which invention helps? (a) a telephone (b) a train (c) a bridge (d) a lift
- 19.🤝 A team of 4 shares 8 equal jobs fairly. Each job takes 2 minutes. How many minutes does each person work?
- 20.🧑🔧 Which branch of engineering designs buildings, roads and bridges? (a) biomedical (b) computer (c) civil (d) chemical
- 21.True or false: a chemical engineer designs artificial limbs. (a) True (b) False
- 22.📋 For a model bridge challenge, is “use at most 20 straws” a constraint or a criterion? (a) a criterion (b) a constraint
- 23.🧑🔧 Which kind of engineer builds a website? (a) civil (b) biomedical (c) computer (d) electrical
- 24.True or false: “spend at most ₹100” is a constraint (a limit). (a) True (b) False
- 25.🤝 Is it good or poor teamwork to do all the work alone? (a) poor teamwork (b) good teamwork
- 26.True or false: to talk over others is poor teamwork. (a) True (b) False
- 27.🧪 Why repeat a test three times? (a) the first is wrong (b) to use more paper (c) it looks busy (d) to get reliable results
- 28.🔄 In which step do engineers draw a labelled diagram? (a) Improve (b) Plan (c) Test (d) Ask
- 29.🧪 Is it good or poor testing to hide a failed test? (a) poor testing (b) good testing
- 30.🔍 Which is the odd one out? (a) float for 1 minute (b) finish in 40 minutes (c) hold up 500 g (d) roll at least 2 metres
- 31.🛠️ What does an engineer do before building anything? (a) paints the model (b) buys every material (c) understands the problem (d) builds at once
- 32.🔢 To build and test a straw bridge, which is the LAST step? (a) choose and draw one (b) load it with coins (c) strengthen the weak part (d) sketch three ideas
- 33.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 34.What does the team leader do? (a) checks the goals are met (b) runs the tests (c) tracks what is used up (d) shares out the jobs
- 35.🧑🔧 Which kind of engineer designs aeroplane wings? (a) mechanical (b) civil (c) aerospace (d) computer
- 36.🔄 Which design-process step is it to find the limits? (a) Improve (b) Test (c) Plan (d) Ask
- 37.True or false: to tie back long hair is safe. (a) False (b) True
- 38.🧑🔧 Which kind of engineer lays out a highway? (a) civil (b) electrical (c) biomedical (d) mechanical
- 39.Which job does a chemical engineer do? (a) designs bicycle gears (b) builds a website (c) designs a flyover (d) refines crude oil
- 40.🔍 Which is the odd one out? (a) repeat each test (b) skip writing results (c) guess, do not measure (d) hide a failed test
Answer key
- test it only once
- No
- mechanical
- keeps the team on track
- materials manager
- True
- False
- no, it breaks a limit
- aerospace
- False
- design A
- Improve
- False
- cuts and joins parts
- 190
- False
- run while holding tools
- a telephone
- 4
- civil
- False
- a constraint
- computer
- True
- poor teamwork
- True
- to get reliable results
- Plan
- poor testing
- finish in 40 minutes
- understands the problem
- strengthen the weak part
- poor testing
- shares out the jobs
- aerospace
- Ask
- True
- civil
- refines crude oil
- repeat each test
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids