Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.True or false: to follow the plan to build is the Ask step. (a) False (b) True
- 2.🔍 Which is the odd one out? (a) a rainbow (b) a bicycle (c) a river (d) a volcano
- 3.🔢 To follow the engineering design process, which is the LAST step? (a) Improve (b) Imagine (c) Test (d) Plan
- 4.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 5.🔍 Which is the odd one out? (a) lift a cup of water (b) fit on a school desk (c) float for 1 minute (d) keep ice for 1 hour
- 6.🔄 After testing, a design does not work well. What comes next? (a) Ask (b) Imagine (c) give up (d) Improve
- 7.True or false: “float for 1 minute” is a constraint (a limit). (a) True (b) False
- 8.🤝 Why do engineers work in teams? (a) to argue more (b) to finish nothing (c) many skills and ideas (d) to work alone
- 9.🤝 Is it good or poor teamwork to agree before changing? (a) good teamwork (b) poor teamwork
- 10.🤝 How do engineers share a design with others? (a) only talking fast (b) clear labelled sketches (c) no drawings at all (d) secret notes
- 11.📋 Your team’s budget is ₹120. You must buy one roll of tape for ₹20. Straws cost ₹5 each. What is the greatest number of straws you can buy?
- 12.🛠️ A scientist asks “why does it happen?”. An engineer mostly asks … (a) why is the sky blue? (b) what is for lunch? (c) how can we build it? (d) who won the match?
- 13.Which job is a spanner for? (a) check a shelf is level (b) tighten a nut (c) drive in a nail (d) measure a long length
- 14.📋 Your team’s budget is ₹76. You must buy one roll of tape for ₹10. Straws cost ₹3 each. What is the greatest number of straws you can buy?
- 15.🦺 How should you carry scissors? (a) points up, open (b) while running (c) by the blades (d) points down, closed
- 16.True or false: to think of wild ideas is the Imagine step. (a) True (b) False
- 17.🤝 In a design team, who cuts and joins parts? (a) tester (b) team leader (c) recorder (d) builder
- 18.🤝 A teammate’s idea seems odd. What should you do first? (a) laugh at it (b) listen and ask why (c) ignore it (d) walk away
- 19.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “read the challenge rules”? (a) read the challenge rules (b) build it with straws
- 20.True or false: to use a new load each time is poor testing. (a) False (b) True
- 21.🤝 A team plans for 30 minutes, builds for 10 minutes and then tests for 25 minutes, one after another. How many minutes is that in all?
- 22.🧑🔧 Which branch of engineering uses engineering to help doctors? (a) civil (b) electrical (c) aerospace (d) biomedical
- 23.🧑🔧 Which branch of engineering works on aeroplanes and rockets? (a) aerospace (b) computer (c) chemical (d) civil
- 24.Which of these is found in nature? (a) a banyan tree (b) a railway track (c) a satellite (d) a lift
- 25.True or false: a mechanical engineer designs a gearbox. (a) False (b) True
- 26.🧑🔧 Which kind of engineer designs a metro tunnel? (a) biomedical (b) civil (c) mechanical (d) aerospace
- 27.🦺 In the workshop, is it safe to let adults use hot glue? (a) not safe (b) safe
- 28.🦺 In the workshop, is it safe to tie back long hair? (a) not safe (b) safe
- 29.🧪 Three prototype bridges were tested with the same method. Design A held 100 g, design B held 150 g and design C held 200 g. Which design was the strongest? (a) design B (b) design C (c) design A
- 30.🤝 In a design team, who keeps the team on track? (a) materials manager (b) builder (c) recorder (d) team leader
- 31.🔍 Which is the odd one out? (a) record every result (b) repeat each test (c) hide a failed test (d) change only one thing
- 32.Which of these is found in nature? (a) a satellite (b) a mobile phone (c) a cloud (d) a bridge
- 33.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 34.🧪 Is it good or poor testing to skip writing results? (a) poor testing (b) good testing
- 35.True or false: “finish in 40 minutes” is a constraint (a limit). (a) True (b) False
- 36.🤝 A team of 3 shares 12 equal jobs fairly. Each job takes 8 minutes. How many minutes does each person work?
- 37.🔢 To follow the engineering design process, what comes right after “Imagine”? (a) Plan (b) Ask (c) Create (d) Test
- 38.🔢 To build and test a straw bridge, which comes first: “read the challenge rules” or “strengthen the weak part”? (a) read the challenge rules (b) strengthen the weak part
- 39.Which job does an aerospace engineer do? (a) builds hospital scanners (b) designs school networks (c) designs aeroplane wings (d) runs a fertiliser plant
- 40.🔄 Which design-process step is it to ask who will use it? (a) Improve (b) Ask (c) Imagine (d) Test
Answer key
- False
- a bicycle
- Improve
- poor testing
- fit on a school desk
- Improve
- False
- many skills and ideas
- good teamwork
- clear labelled sketches
- 20
- how can we build it?
- tighten a nut
- 22
- points down, closed
- True
- builder
- listen and ask why
- read the challenge rules
- True
- 65
- biomedical
- aerospace
- a banyan tree
- True
- civil
- safe
- safe
- design C
- team leader
- hide a failed test
- a cloud
- poor testing
- poor testing
- True
- 32
- Plan
- read the challenge rules
- designs aeroplane wings
- Ask
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids