Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔍 Which is the odd one out? (a) guess, do not measure (b) test it only once (c) measure the same way (d) hide a failed test
- 2.📋 Your team’s budget is ₹54. You must buy one roll of tape for ₹15. Straws cost ₹3 each. What is the greatest number of straws you can buy?
- 3.True or false: to measure the same way is poor testing. (a) False (b) True
- 4.🔍 Which is the odd one out? (a) spend at most ₹100 (b) roll at least 2 metres (c) keep ice for 1 hour (d) float for 1 minute
- 5.🦺 Who should use hot glue guns and power tools in a kids’ project? (a) an adult (b) a stranger (c) the youngest child (d) any child alone
- 6.🔍 Which is the odd one out? (a) wear safety goggles (b) let adults use hot glue (c) clamp wood before sawing (d) leave tools on the floor
- 7.🛠️ What does an engineer do before building anything? (a) understands the problem (b) builds at once (c) buys every material (d) paints the model
- 8.🧪 What is a prototype? (a) an early test model (b) a sales poster (c) a broken part (d) the final product
- 9.🧑🔧 Which kind of engineer designs aeroplane wings? (a) electrical (b) mechanical (c) aerospace (d) biomedical
- 10.🔍 Which is the odd one out? (a) cut towards your hand (b) use a cracked tool (c) touch a hot glue tip (d) carry scissors closed
- 11.🔄 What is the FIRST step of the engineering design process? (a) Improve (b) Ask (c) Test (d) Create
- 12.🤝 Is it good or poor teamwork to own up to a mistake? (a) good teamwork (b) poor teamwork
- 13.True or false: to help a stuck teammate is good teamwork. (a) True (b) False
- 14.🔢 To follow the engineering design process, what comes right after “Ask”? (a) Imagine (b) Improve (c) Test (d) Create
- 15.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “load it with coins”? (a) load it with coins (b) strengthen the weak part
- 16.True or false: to play near a moving drill is not safe. (a) True (b) False
- 17.True or false: to hide a failed test is good testing. (a) False (b) True
- 18.🔄 After testing, a design does not work well. What comes next? (a) give up (b) Ask (c) Imagine (d) Improve
- 19.🔧 Which tool would you use to measure a long length? (a) a spirit level (b) a hand drill (c) a hammer (d) a tape measure
- 20.🧪 In a fair test, how many things do you change at a time? (a) none (b) two (c) one (d) all of them
- 21.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) read the challenge rules (b) strengthen the weak part (c) sketch three ideas (d) build it with straws
- 22.Which need does a bridge meet? (a) reach a top floor fast (b) see very tiny things (c) keep food fresh longer (d) cross a wide river
- 23.🔢 To build and test a straw bridge, which is the FIRST step? (a) sketch three ideas (b) read the challenge rules (c) strengthen the weak part (d) choose and draw one
- 24.🛠️ Is a seashell made by engineers or found in nature? (a) made by engineers (b) found in nature
- 25.🧑🔧 Which kind of engineer designs factory machines? (a) mechanical (b) biomedical (c) aerospace (d) chemical
- 26.🔄 Which design-process step is it to fix the weak part? (a) Imagine (b) Create (c) Improve (d) Plan
- 27.📋 For a model bridge challenge, is “lift a cup of water” a constraint or a criterion? (a) a criterion (b) a constraint
- 28.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “read the challenge rules”? (a) build it with straws (b) read the challenge rules
- 29.Which job does a civil engineer do? (a) refines crude oil (b) plans a dam (c) designs school networks (d) designs artificial limbs
- 30.🧪 The first prototype held 220 g. After the team improved it, the new prototype held 250 g. How many more grams did it hold?
- 31.True or false: to use the same load is poor testing. (a) False (b) True
- 32.🧑🔧 Which kind of engineer designs hearing aids? (a) electrical (b) biomedical (c) civil (d) mechanical
- 33.Which need does a train meet? (a) store water for summer (b) carry many people far (c) talk to someone far away (d) reach a top floor fast
- 34.🔄 Is the engineering design process done only once? (a) no, it repeats (b) yes, only once (c) only for big jobs (d) only on Sundays
- 35.🧑🔧 Which kind of engineer designs a flyover? (a) chemical (b) computer (c) civil (d) aerospace
- 36.🤝 A team of 5 shares 10 equal jobs fairly. Each job takes 6 minutes. How many minutes does each person work?
- 37.📋 Constraint: the tower must be no taller than 30 cm. The team’s tower is 30 cm tall. Is it within the constraint? (a) Yes (b) No
- 38.🛠️ People need to cross a wide river. Which invention helps? (a) a solar panel (b) a water filter (c) a train (d) a bridge
- 39.🔧 Which tool would you use to tighten a nut? (a) a spanner (b) sandpaper (c) a spirit level (d) a tape measure
- 40.True or false: to play near a moving drill is safe. (a) False (b) True
Answer key
- measure the same way
- 13
- False
- spend at most ₹100
- an adult
- leave tools on the floor
- understands the problem
- an early test model
- aerospace
- carry scissors closed
- Ask
- good teamwork
- True
- Imagine
- load it with coins
- True
- False
- Improve
- a tape measure
- one
- build it with straws
- cross a wide river
- read the challenge rules
- found in nature
- mechanical
- Improve
- a criterion
- read the challenge rules
- plans a dam
- 30
- False
- biomedical
- carry many people far
- no, it repeats
- civil
- 12
- Yes
- a bridge
- a spanner
- False
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids