Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🤝 In a design team, who checks the goals are met? (a) recorder (b) builder (c) tester (d) materials manager
- 2.🤝 In a design team, who tracks what is used up? (a) materials manager (b) builder (c) recorder (d) team leader
- 3.True or false: to cut away from your body is not safe. (a) True (b) False
- 4.Which of these is made by engineers? (a) a satellite (b) a cloud (c) a coral reef (d) a river
- 5.Which job does a mechanical engineer do? (a) designs factory machines (b) plans a space mission (c) builds hospital scanners (d) designs artificial limbs
- 6.📋 Constraint: the tower must be no taller than 80 cm. The team’s tower is 76 cm tall. Is it within the constraint? (a) Yes (b) No
- 7.📋 Criterion: the model bridge must hold at least 400 g. In the test it held 500 g. Does it meet the criterion? (a) Yes (b) No
- 8.🧪 A paper bridge was tested three times. It held 330 g, 300 g and 300 g. What is the mean (average) load it held, in grams?
- 9.🧪 A paper bridge was tested three times. It held 200 g, 150 g and 250 g. What is the mean (average) load it held, in grams?
- 10.🤝 In a design team, who writes down results? (a) team leader (b) tester (c) recorder (d) builder
- 11.🛠️ Is a satellite made by engineers or found in nature? (a) found in nature (b) made by engineers
- 12.🤝 Is it good or poor teamwork to give kind feedback? (a) good teamwork (b) poor teamwork
- 13.True or false: to record every result is good testing. (a) True (b) False
- 14.True or false: “use at most 20 straws” is a criterion (a goal). (a) False (b) True
- 15.True or false: to ignore the team plan is poor teamwork. (a) True (b) False
- 16.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “read the challenge rules”? (a) load it with coins (b) read the challenge rules
- 17.🔢 To follow the engineering design process, what comes right after “Ask”? (a) Plan (b) Create (c) Test (d) Imagine
- 18.🤝 Is it good or poor teamwork to agree before changing? (a) good teamwork (b) poor teamwork
- 19.True or false: a civil engineer lays out a highway. (a) False (b) True
- 20.🤝 Is it good or poor teamwork to share the work fairly? (a) poor teamwork (b) good teamwork
- 21.Which of these is found in nature? (a) a seashell (b) a bridge (c) a satellite (d) a water filter
- 22.🧪 Is it good or poor testing to use the same load? (a) good testing (b) poor testing
- 23.True or false: a chemical engineer runs a fertiliser plant. (a) True (b) False
- 24.True or false: a rainbow is found in nature. (a) True (b) False
- 25.🤝 In a design team, who runs the tests? (a) team leader (b) tester (c) materials manager (d) recorder
- 26.True or false: to drive in a nail, use a tape measure. (a) True (b) False
- 27.Which of these happens in the Ask step? (a) build the model (b) find the limits (c) make a prototype (d) draw a labelled diagram
- 28.🤝 In a design team, who keeps the design notes? (a) recorder (b) materials manager (c) builder (d) tester
- 29.True or false: a chemical engineer writes app software. (a) False (b) True
- 30.What does the materials manager do? (a) shares out the jobs (b) runs the tests (c) puts the model together (d) collects the supplies
- 31.🔢 To follow the engineering design process, which is the FIRST step? (a) Improve (b) Imagine (c) Create (d) Ask
- 32.🛠️ People need to go through a mountain. Which invention helps? (a) a train (b) a tunnel (c) a fridge (d) a dam
- 33.Which need does a train meet? (a) carry many people far (b) store water for summer (c) reach a top floor fast (d) keep food fresh longer
- 34.🤝 In a design team, who puts the model together? (a) materials manager (b) tester (c) recorder (d) builder
- 35.Which of these happens in the Create step? (a) follow the plan to build (b) fix the weak part (c) make it better, retest (d) list the materials
- 36.True or false: a mechanical engineer designs bicycle gears. (a) False (b) True
- 37.🤝 A team plans for 15 minutes, builds for 20 minutes and then tests for 10 minutes, one after another. How many minutes is that in all?
- 38.🔄 Which design-process step is it to dream up possible fixes? (a) Plan (b) Imagine (c) Ask (d) Create
- 39.True or false: “finish in 40 minutes” is a constraint (a limit). (a) True (b) False
- 40.🔧 Which tool would you use to grip and bend wire? (a) a screwdriver (b) pliers (c) a protractor (d) sandpaper
Answer key
- tester
- materials manager
- False
- a satellite
- designs factory machines
- Yes
- Yes
- 310
- 200
- recorder
- made by engineers
- good teamwork
- True
- False
- True
- read the challenge rules
- Imagine
- good teamwork
- True
- good teamwork
- a seashell
- good testing
- True
- True
- tester
- False
- find the limits
- recorder
- False
- collects the supplies
- Ask
- a tunnel
- carry many people far
- builder
- follow the plan to build
- True
- 45
- Imagine
- True
- pliers