Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.🔧 Which tool would you use to check a shelf is level? (a) a protractor (b) a spanner (c) pliers (d) a spirit level
- 2.🤝 Is it good or poor teamwork to share the work fairly? (a) good teamwork (b) poor teamwork
- 3.True or false: to build the model is the Plan step. (a) True (b) False
- 4.🤝 In a design team, who shares out the jobs? (a) team leader (b) tester (c) builder (d) recorder
- 5.Which of these happens in the Imagine step? (a) measure its performance (b) try it out (c) build the model (d) think of wild ideas
- 6.🤝 A teammate’s idea seems odd. What should you do first? (a) ignore it (b) listen and ask why (c) walk away (d) laugh at it
- 7.🧪 Three prototype bridges were tested with the same method. Design A held 250 g, design B held 200 g and design C held 150 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 8.🦺 What protects your eyes when sawing or drilling? (a) a cap (b) sunglasses (c) safety goggles (d) nothing
- 9.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 10.📋 For a model bridge challenge, is “be under 30 cm tall” a constraint or a criterion? (a) a constraint (b) a criterion
- 11.True or false: a ceiling fan is made by engineers. (a) False (b) True
- 12.🧪 A paper bridge was tested three times. It held 240 g, 160 g and 290 g. What is the mean (average) load it held, in grams?
- 13.True or false: an aerospace engineer designs satellites. (a) True (b) False
- 14.🔍 Which is the odd one out? (a) a lift (b) a mobile phone (c) a cloud (d) a satellite
- 15.Which job is a spanner for? (a) make a hole in wood (b) drive in a nail (c) measure a long length (d) tighten a nut
- 16.🤝 How do engineers share a design with others? (a) clear labelled sketches (b) no drawings at all (c) only talking fast (d) secret notes
- 17.Which of these is made by engineers? (a) a banyan tree (b) a rainbow (c) a bridge (d) a coral reef
- 18.🔄 Which design-process step is it to build the model? (a) Test (b) Create (c) Imagine (d) Plan
- 19.🦺 How should you carry scissors? (a) while running (b) by the blades (c) points up, open (d) points down, closed
- 20.🧪 The first prototype held 130 g. After the team improved it, the new prototype held 230 g. How many more grams did it hold?
- 21.📋 Your team’s budget is ₹168. You must buy one roll of tape for ₹15. Straws cost ₹5 each. What is the greatest number of straws you can buy?
- 22.Which need does a fridge meet? (a) see very tiny things (b) make water safe to drink (c) reach a top floor fast (d) keep food fresh longer
- 23.🧑🔧 Which kind of engineer runs a fertiliser plant? (a) aerospace (b) chemical (c) biomedical (d) civil
- 24.Which of these happens in the Test step? (a) make a prototype (b) fix the weak part (c) redesign after testing (d) check it against goals
- 25.What does the builder do? (a) writes down results (b) keeps the team on track (c) cuts and joins parts (d) keeps the design notes
- 26.📋 Criteria are … (a) the team names (b) the tools you use (c) goals a design must meet (d) the limits on money
- 27.🔄 Which design-process step is it to follow the plan to build? (a) Ask (b) Create (c) Improve (d) Imagine
- 28.True or false: to run while holding tools is not safe. (a) True (b) False
- 29.📋 Your team’s budget is ₹25. You must buy one roll of tape for ₹10. Straws cost ₹1 each. What is the greatest number of straws you can buy?
- 30.🔍 Which is the odd one out? (a) roll at least 2 metres (b) hold up 500 g (c) carry 10 coins (d) use at most 20 straws
- 31.Which job is pliers for? (a) grip and bend wire (b) make a hole in wood (c) tighten a nut (d) check a shelf is level
- 32.Which need does a train meet? (a) store water for summer (b) carry many people far (c) talk to someone far away (d) reach a top floor fast
- 33.🔢 To follow the engineering design process, what comes right after “Ask”? (a) Imagine (b) Plan (c) Test (d) Improve
- 34.🦺 In the workshop, is it safe to touch a hot glue tip? (a) safe (b) not safe
- 35.🛠️ Is a satellite made by engineers or found in nature? (a) made by engineers (b) found in nature
- 36.🦺 In the workshop, is it safe to tie back long hair? (a) not safe (b) safe
- 37.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 38.🤝 In a design team, who tracks what is used up? (a) tester (b) materials manager (c) recorder (d) builder
- 39.🧪 A paper bridge was tested three times. It held 390 g, 220 g and 350 g. What is the mean (average) load it held, in grams?
- 40.Which of these is found in nature? (a) a mobile phone (b) a water filter (c) a river (d) a dam
Answer key
- a spirit level
- good teamwork
- False
- team leader
- think of wild ideas
- listen and ask why
- design A
- safety goggles
- poor testing
- a constraint
- True
- 230
- True
- a cloud
- tighten a nut
- clear labelled sketches
- a bridge
- Create
- points down, closed
- 100
- 30
- keep food fresh longer
- chemical
- check it against goals
- cuts and joins parts
- goals a design must meet
- Create
- True
- 15
- use at most 20 straws
- grip and bend wire
- carry many people far
- Imagine
- not safe
- made by engineers
- safe
- poor testing
- materials manager
- 320
- a river
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids