← Part 1 test: what engineers do lesson New set →

Engineering Worksheet: Part 1 Test

Engineering lesson 8: Part 1 test: what engineers do · Set 674 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.🛠️ Is a ceiling fan made by engineers or found in nature? (a) found in nature (b) made by engineers
  2. 2.True or false: a water filter is found in nature. (a) False (b) True
  3. 3.📋 Criterion: the model bridge must hold at least 1000 g. In the test it held 1150 g. Does it meet the criterion? (a) Yes (b) No
  4. 4.🧪 Three prototype bridges were tested with the same method. Design A held 190 g, design B held 240 g and design C held 140 g. Which design was the strongest? (a) design A (b) design B (c) design C
  5. 5.True or false: to use a new load each time is poor testing. (a) False (b) True
  6. 6.🧪 Why repeat a test three times? (a) to use more paper (b) it looks busy (c) to get reliable results (d) the first is wrong
  7. 7.📋 Your team’s budget is ₹152. You must buy one roll of tape for ₹15. Straws cost ₹5 each. What is the greatest number of straws you can buy?
  8. 8.🔄 After testing, a design does not work well. What comes next? (a) Improve (b) give up (c) Ask (d) Imagine
  9. 9.🧪 Three prototype bridges were tested with the same method. Design A held 180 g, design B held 130 g and design C held 230 g. Which design was the strongest? (a) design C (b) design B (c) design A
  10. 10.True or false: a lift helps people reach a top floor fast. (a) True (b) False
  11. 11.🧪 A paper bridge was tested three times. It held 240 g, 180 g and 150 g. What is the mean (average) load it held, in grams?
  12. 12.🤝 In a design team, who keeps the team on track? (a) builder (b) team leader (c) tester (d) materials manager
  13. 13.Which job does an aerospace engineer do? (a) plans a space mission (b) designs a flyover (c) designs knee implants (d) runs a fertiliser plant
  14. 14.📋 Constraint: the tower must be no taller than 30 cm. The team’s tower is 30 cm tall. Is it within the constraint? (a) No (b) Yes
  15. 15.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) no, it breaks a limit (b) only if it is red (c) yes, always (d) yes, it works
  16. 16.True or false: to use a cracked tool is not safe. (a) True (b) False
  17. 17.Which of these happens in the Test step? (a) redesign after testing (b) define the problem (c) follow the plan to build (d) try it out
  18. 18.Which of these is found in nature? (a) a mountain (b) a dam (c) a bridge (d) a railway track
  19. 19.True or false: to skip writing results is poor testing. (a) True (b) False
  20. 20.True or false: an electrical engineer designs car engines. (a) False (b) True
  21. 21.🧪 Three prototype bridges were tested with the same method. Design A held 270 g, design B held 170 g and design C held 220 g. Which design was the weakest? (a) design A (b) design B (c) design C
  22. 22.🤝 Is it good or poor teamwork to give kind feedback? (a) poor teamwork (b) good teamwork
  23. 23.🔢 To follow the engineering design process, which is the LAST step? (a) Test (b) Ask (c) Improve (d) Imagine
  24. 24.🔄 In which step do engineers draw a labelled diagram? (a) Test (b) Plan (c) Ask (d) Improve
  25. 25.🧑‍🔧 Which branch of engineering designs machines with moving parts? (a) biomedical (b) civil (c) mechanical (d) chemical
  26. 26.📋 For a model bridge challenge, is “roll at least 2 metres” a constraint or a criterion? (a) a criterion (b) a constraint
  27. 27.📋 For a model bridge challenge, is “spend at most ₹100” a constraint or a criterion? (a) a criterion (b) a constraint
  28. 28.🔄 Which design-process step is it to define the problem? (a) Plan (b) Create (c) Imagine (d) Ask
  29. 29.🔍 Which is the odd one out? (a) let adults use hot glue (b) use a cracked tool (c) touch a hot glue tip (d) cut towards your hand
  30. 30.Which need does a fridge meet? (a) cross a wide river (b) reach a top floor fast (c) store water for summer (d) keep food fresh longer
  31. 31.🛠️ Is a seashell made by engineers or found in nature? (a) made by engineers (b) found in nature
  32. 32.True or false: to play near a moving drill is not safe. (a) False (b) True
  33. 33.🔍 Which is the odd one out? (a) be under 30 cm tall (b) hold up 500 g (c) use only paper and tape (d) finish in 40 minutes
  34. 34.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
  35. 35.True or false: to put tools back after use is safe. (a) False (b) True
  36. 36.🤝 In a design team, who checks the goals are met? (a) recorder (b) tester (c) builder (d) team leader
  37. 37.What does the team leader do? (a) puts the model together (b) cuts and joins parts (c) keeps the design notes (d) keeps the team on track
  38. 38.🔄 Which design-process step is it to dream up possible fixes? (a) Imagine (b) Test (c) Improve (d) Ask
  39. 39.🧪 A paper bridge was tested three times. It held 420 g, 250 g and 320 g. What is the mean (average) load it held, in grams?
  40. 40.🔧 Which tool would you use to make a hole in wood? (a) a spirit level (b) a protractor (c) a hand drill (d) sandpaper

Answer key

  1. made by engineers
  2. False
  3. Yes
  4. design B
  5. True
  6. to get reliable results
  7. 27
  8. Improve
  9. design C
  10. True
  11. 190
  12. team leader
  13. plans a space mission
  14. Yes
  15. no, it breaks a limit
  16. True
  17. try it out
  18. a mountain
  19. True
  20. False
  21. design B
  22. good teamwork
  23. Improve
  24. Plan
  25. mechanical
  26. a criterion
  27. a constraint
  28. Ask
  29. let adults use hot glue
  30. keep food fresh longer
  31. found in nature
  32. True
  33. hold up 500 g
  34. good testing
  35. True
  36. tester
  37. keeps the team on track
  38. Imagine
  39. 330
  40. a hand drill

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids