Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.Which of these is found in nature? (a) a bridge (b) a seashell (c) a satellite (d) a dam
- 2.🔍 Which is the odd one out? (a) be under 30 cm tall (b) spend at most ₹100 (c) hold up 500 g (d) finish in 40 minutes
- 3.🤝 A team plans for 45 minutes, builds for 60 minutes and then tests for 15 minutes, one after another. How many minutes is that in all?
- 4.True or false: a mechanical engineer designs a gearbox. (a) False (b) True
- 5.📋 Your team’s budget is ₹41. You must buy one roll of tape for ₹5. Straws cost ₹4 each. What is the greatest number of straws you can buy?
- 6.🧑🔧 Which kind of engineer designs a paint factory? (a) computer (b) mechanical (c) chemical (d) electrical
- 7.True or false: a computer engineer designs car engines. (a) True (b) False
- 8.🛠️ Is a river made by engineers or found in nature? (a) made by engineers (b) found in nature
- 9.🤝 In a design team, who collects the supplies? (a) recorder (b) builder (c) materials manager (d) team leader
- 10.What does the materials manager do? (a) puts the model together (b) keeps the team on track (c) checks the goals are met (d) tracks what is used up
- 11.True or false: a bridge is found in nature. (a) False (b) True
- 12.🧪 The first prototype held 300 g. After the team improved it, the new prototype held 430 g. How many more grams did it hold?
- 13.🧪 Why repeat a test three times? (a) it looks busy (b) the first is wrong (c) to get reliable results (d) to use more paper
- 14.🔍 Which is the odd one out? (a) a rainbow (b) a water filter (c) a mobile phone (d) a ceiling fan
- 15.Which job is sandpaper for? (a) grip and bend wire (b) turn a screw (c) smooth a rough edge (d) measure an angle
- 16.Which of these is made by engineers? (a) a coral reef (b) a banyan tree (c) a satellite (d) a volcano
- 17.🔢 To build and test a straw bridge, which is the FIRST step? (a) sketch three ideas (b) strengthen the weak part (c) read the challenge rules (d) choose and draw one
- 18.🛠️ People need to carry many people far. Which invention helps? (a) a microscope (b) a dam (c) a train (d) a tunnel
- 19.📋 Constraint: the tower must be no taller than 40 cm. The team’s tower is 34 cm tall. Is it within the constraint? (a) Yes (b) No
- 20.Which job does a computer engineer do? (a) designs school networks (b) designs a paint factory (c) designs aeroplane wings (d) designs power lines
- 21.🧪 Three prototype bridges were tested with the same method. Design A held 210 g, design B held 310 g and design C held 260 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 22.📋 Criterion: the model bridge must hold at least 600 g. In the test it held 450 g. Does it meet the criterion? (a) No (b) Yes
- 23.🔍 Which is the odd one out? (a) use the same load (b) record every result (c) change only one thing (d) hide a failed test
- 24.🤝 In a design team, who runs the tests? (a) materials manager (b) team leader (c) builder (d) tester
- 25.🔍 Which is the odd one out? (a) clamp wood before sawing (b) tie back long hair (c) wear safety goggles (d) run while holding tools
- 26.True or false: to use the same load is good testing. (a) True (b) False
- 27.🤝 In a design team, who checks the goals are met? (a) tester (b) builder (c) team leader (d) recorder
- 28.🔄 Which design-process step is it to try it out? (a) Create (b) Imagine (c) Improve (d) Test
- 29.📋 For a model bridge challenge, is “float for 1 minute” a constraint or a criterion? (a) a constraint (b) a criterion
- 30.🔢 To follow the engineering design process, what comes right after “Plan”? (a) Create (b) Improve (c) Test (d) Ask
- 31.🛠️ What does an engineer mainly do? (a) only paints pictures (b) sells tickets (c) grows crops (d) designs useful solutions
- 32.Which job is pliers for? (a) measure an angle (b) grip and bend wire (c) smooth a rough edge (d) check a shelf is level
- 33.🔢 To follow the engineering design process, which comes first: “Create” or “Plan”? (a) Plan (b) Create
- 34.🔢 To follow the engineering design process, which comes first: “Imagine” or “Plan”? (a) Imagine (b) Plan
- 35.🔢 To follow the engineering design process, what comes right after “Imagine”? (a) Ask (b) Test (c) Improve (d) Plan
- 36.What does the builder do? (a) collects the supplies (b) shares out the jobs (c) runs the tests (d) puts the model together
- 37.🧑🔧 Which kind of engineer lays out a highway? (a) computer (b) mechanical (c) electrical (d) civil
- 38.Which of these happens in the Imagine step? (a) brainstorm many ideas (b) make a prototype (c) define the problem (d) follow the plan to build
- 39.🔧 Which tool would you use to measure a long length? (a) a screwdriver (b) a hammer (c) a spanner (d) a tape measure
- 40.📋 Criteria are … (a) the limits on money (b) the tools you use (c) goals a design must meet (d) the team names
Answer key
- a seashell
- hold up 500 g
- 120
- True
- 9
- chemical
- False
- found in nature
- materials manager
- tracks what is used up
- False
- 130
- to get reliable results
- a rainbow
- smooth a rough edge
- a satellite
- read the challenge rules
- a train
- Yes
- designs school networks
- design B
- No
- hide a failed test
- tester
- run while holding tools
- True
- tester
- Test
- a criterion
- Create
- designs useful solutions
- grip and bend wire
- Plan
- Imagine
- Plan
- puts the model together
- civil
- brainstorm many ideas
- a tape measure
- goals a design must meet
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids