← Part 1 test: what engineers do lesson New set →

Engineering Worksheet: Part 1 Test

Engineering lesson 8: Part 1 test: what engineers do · Set 747 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.📋 Your team’s budget is ₹106. You must buy one roll of tape for ₹20. Straws cost ₹5 each. What is the greatest number of straws you can buy?
  2. 2.True or false: to grip and bend wire, use pliers. (a) False (b) True
  3. 3.📋 For a model bridge challenge, is “carry 10 coins” a constraint or a criterion? (a) a constraint (b) a criterion
  4. 4.True or false: to give kind feedback is good teamwork. (a) False (b) True
  5. 5.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) yes, always (b) only if it is red (c) yes, it works (d) no, it breaks a limit
  6. 6.🤝 Is it good or poor teamwork to laugh at ideas? (a) good teamwork (b) poor teamwork
  7. 7.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “build it with straws”? (a) strengthen the weak part (b) build it with straws
  8. 8.Which of these is found in nature? (a) a mobile phone (b) a volcano (c) a satellite (d) a bicycle
  9. 9.Which of these happens in the Improve step? (a) redesign after testing (b) dream up possible fixes (c) check it against goals (d) ask who will use it
  10. 10.Which need does a water filter meet? (a) reach a top floor fast (b) make water safe to drink (c) make power from sunlight (d) cross a wide river
  11. 11.🧪 Is it good or poor testing to test it only once? (a) poor testing (b) good testing
  12. 12.🔢 To follow the engineering design process, which is the LAST step? (a) Imagine (b) Ask (c) Create (d) Improve
  13. 13.True or false: “stand in a fan breeze” is a constraint (a limit). (a) True (b) False
  14. 14.Which of these happens in the Imagine step? (a) dream up possible fixes (b) define the problem (c) make it better, retest (d) redesign after testing
  15. 15.🧑‍🔧 Which kind of engineer builds hospital scanners? (a) electrical (b) chemical (c) civil (d) biomedical
  16. 16.True or false: a chemical engineer plans a power grid. (a) False (b) True
  17. 17.🔍 Which is the odd one out? (a) touch a hot glue tip (b) leave tools on the floor (c) play near a moving drill (d) tie back long hair
  18. 18.🛠️ People need to make water safe to drink. Which invention helps? (a) a water filter (b) a bridge (c) a microscope (d) a tunnel
  19. 19.🤝 Is it good or poor teamwork to talk over others? (a) good teamwork (b) poor teamwork
  20. 20.🔍 Which is the odd one out? (a) spend at most ₹100 (b) carry 10 coins (c) be under 30 cm tall (d) fit on a school desk
  21. 21.🦺 In the workshop, is it safe to tie back long hair? (a) safe (b) not safe
  22. 22.🔢 To follow the engineering design process, what comes right after “Ask”? (a) Improve (b) Create (c) Test (d) Imagine
  23. 23.📋 For a model bridge challenge, is “finish in 40 minutes” a constraint or a criterion? (a) a criterion (b) a constraint
  24. 24.🔢 To build and test a straw bridge, which is the LAST step? (a) choose and draw one (b) strengthen the weak part (c) build it with straws (d) load it with coins
  25. 25.🧪 In a fair test, how many things do you change at a time? (a) two (b) none (c) all of them (d) one
  26. 26.📋 For a model bridge challenge, is “lift a cup of water” a constraint or a criterion? (a) a criterion (b) a constraint
  27. 27.Which of these is found in nature? (a) a bicycle (b) a bridge (c) a railway track (d) a waterfall
  28. 28.🔍 Which is the odd one out? (a) repeat each test (b) change only one thing (c) hide a failed test (d) measure the same way
  29. 29.True or false: a train helps people go through a mountain. (a) True (b) False
  30. 30.Which job is a tape measure for? (a) measure a long length (b) tighten a nut (c) grip and bend wire (d) check a shelf is level
  31. 31.🛠️ What does an engineer mainly do? (a) designs useful solutions (b) grows crops (c) sells tickets (d) only paints pictures
  32. 32.📋 Criterion: the model bridge must hold at least 900 g. In the test it held 900 g. Does it meet the criterion? (a) Yes (b) No
  33. 33.🧪 Why repeat a test three times? (a) to get reliable results (b) the first is wrong (c) it looks busy (d) to use more paper
  34. 34.🧪 Three prototype bridges were tested with the same method. Design A held 250 g, design B held 300 g and design C held 350 g. Which design was the weakest? (a) design A (b) design C (c) design B
  35. 35.True or false: to check a shelf is level, use a spirit level. (a) False (b) True
  36. 36.🤝 How do engineers share a design with others? (a) only talking fast (b) no drawings at all (c) secret notes (d) clear labelled sketches
  37. 37.🧪 Why do engineers make prototypes? (a) to decorate a room (b) to avoid testing (c) to test ideas cheaply (d) to sell them at once
  38. 38.🧪 What is a prototype? (a) an early test model (b) the final product (c) a sales poster (d) a broken part
  39. 39.🤝 In a design team, who checks the goals are met? (a) recorder (b) team leader (c) materials manager (d) tester
  40. 40.🤝 A team of 3 shares 15 equal jobs fairly. Each job takes 10 minutes. How many minutes does each person work?

Answer key

  1. 17
  2. True
  3. a criterion
  4. True
  5. no, it breaks a limit
  6. poor teamwork
  7. build it with straws
  8. a volcano
  9. redesign after testing
  10. make water safe to drink
  11. poor testing
  12. Improve
  13. False
  14. dream up possible fixes
  15. biomedical
  16. False
  17. tie back long hair
  18. a water filter
  19. poor teamwork
  20. carry 10 coins
  21. safe
  22. Imagine
  23. a constraint
  24. strengthen the weak part
  25. one
  26. a criterion
  27. a waterfall
  28. hide a failed test
  29. False
  30. measure a long length
  31. designs useful solutions
  32. Yes
  33. to get reliable results
  34. design A
  35. True
  36. clear labelled sketches
  37. to test ideas cheaply
  38. an early test model
  39. tester
  40. 50

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids