Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.📋 Constraint: the tower must be no taller than 40 cm. The team’s tower is 42 cm tall. Is it within the constraint? (a) Yes (b) No
- 2.🔄 Which design-process step is it to ask who will use it? (a) Improve (b) Test (c) Ask (d) Create
- 3.True or false: an electrical engineer wires a new building. (a) True (b) False
- 4.Which job is a tape measure for? (a) check a shelf is level (b) measure a long length (c) cut a wooden plank (d) measure an angle
- 5.True or false: to talk over others is poor teamwork. (a) True (b) False
- 6.Which need does a dam meet? (a) store water for summer (b) cross a wide river (c) go through a mountain (d) make water safe to drink
- 7.True or false: to guess, do not measure is poor testing. (a) True (b) False
- 8.🤝 Is it good or poor teamwork to talk over others? (a) poor teamwork (b) good teamwork
- 9.🧪 Three prototype bridges were tested with the same method. Design A held 110 g, design B held 160 g and design C held 210 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 10.🧪 Three prototype bridges were tested with the same method. Design A held 280 g, design B held 230 g and design C held 180 g. Which design was the weakest? (a) design A (b) design C (c) design B
- 11.🛠️ Is a ceiling fan made by engineers or found in nature? (a) made by engineers (b) found in nature
- 12.🔍 Which is the odd one out? (a) repeat each test (b) change only one thing (c) measure the same way (d) use a new load each time
- 13.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) strengthen the weak part (b) sketch three ideas
- 14.True or false: a dam helps people store water for summer. (a) True (b) False
- 15.True or false: a tunnel helps people keep food fresh longer. (a) False (b) True
- 16.🔄 Which design-process step is it to find the limits? (a) Create (b) Ask (c) Test (d) Plan
- 17.🧪 A paper bridge was tested three times. It held 340 g, 170 g and 300 g. What is the mean (average) load it held, in grams?
- 18.True or false: to try it out is the Improve step. (a) True (b) False
- 19.📋 For a model bridge challenge, is “fit on a school desk” a constraint or a criterion? (a) a criterion (b) a constraint
- 20.📋 A constraint is … (a) a goal for success (b) a limit you must keep to (c) a kind of glue (d) a final test
- 21.🔢 To follow the engineering design process, which comes first: “Imagine” or “Ask”? (a) Imagine (b) Ask
- 22.Which of these happens in the Create step? (a) make it better, retest (b) build the model (c) define the problem (d) redesign after testing
- 23.What does the materials manager do? (a) runs the tests (b) keeps the design notes (c) collects the supplies (d) shares out the jobs
- 24.True or false: “keep ice for 1 hour” is a constraint (a limit). (a) False (b) True
- 25.True or false: to repeat each test is good testing. (a) False (b) True
- 26.True or false: a coral reef is found in nature. (a) False (b) True
- 27.🤝 A team plans for 45 minutes, builds for 10 minutes and then tests for 25 minutes, one after another. How many minutes is that in all?
- 28.True or false: a mechanical engineer designs a gearbox. (a) True (b) False
- 29.True or false: “roll at least 2 metres” is a constraint (a limit). (a) True (b) False
- 30.True or false: to guess, do not measure is good testing. (a) False (b) True
- 31.📋 For a model bridge challenge, is “lift a cup of water” a constraint or a criterion? (a) a criterion (b) a constraint
- 32.🤝 A teammate’s idea seems odd. What should you do first? (a) walk away (b) ignore it (c) laugh at it (d) listen and ask why
- 33.🛠️ People need to go through a mountain. Which invention helps? (a) a microscope (b) a bridge (c) a tunnel (d) a water filter
- 34.🧑🔧 Which kind of engineer designs factory machines? (a) civil (b) mechanical (c) biomedical (d) aerospace
- 35.📋 For a model bridge challenge, is “hold up 500 g” a constraint or a criterion? (a) a constraint (b) a criterion
- 36.🛠️ Engineers use maths and which other subject the most? (a) science (b) dance (c) music (d) cooking
- 37.Which job does an electrical engineer do? (a) designs satellites (b) designs a flyover (c) designs bicycle gears (d) plans a power grid
- 38.🤝 In a design team, who puts the model together? (a) materials manager (b) builder (c) team leader (d) recorder
- 39.True or false: to change lots at once is good testing. (a) False (b) True
- 40.Which job is sandpaper for? (a) tighten a nut (b) measure an angle (c) smooth a rough edge (d) turn a screw
Answer key
- No
- Ask
- True
- measure a long length
- True
- store water for summer
- True
- poor teamwork
- design C
- design C
- made by engineers
- use a new load each time
- sketch three ideas
- True
- False
- Ask
- 270
- False
- a constraint
- a limit you must keep to
- Ask
- build the model
- collects the supplies
- False
- True
- True
- 80
- True
- False
- False
- a criterion
- listen and ask why
- a tunnel
- mechanical
- a criterion
- science
- plans a power grid
- builder
- False
- smooth a rough edge
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids