Engineering Worksheet: Teamwork

Engineering lesson 6: Teamwork in engineering · Set 765 · 40 questions
TalentJR

Engineer's tip (Many hands, one plan): Roles: leader (organises), builder (makes), tester (checks), recorder (writes), materials manager (supplies). Good teamwork: listen, share, be kind, help, agree before changing, own up. Equal sharing: jobs ÷ people = jobs each; × minutes per job = minutes each.

NameDateTime takenScore ___ / 40
  1. 1.True or false: to do all the work alone is good teamwork. (a) True (b) False
  2. 2.🤝 Why do engineers work in teams? (a) to argue more (b) to work alone (c) to finish nothing (d) many skills and ideas
  3. 3.🤝 Is it good or poor teamwork to give kind feedback? (a) poor teamwork (b) good teamwork
  4. 4.🤝 A team of 4 shares 8 equal jobs fairly. Each job takes 2 minutes. How many minutes does each person work?
  5. 5.🤝 In a design team, who shares out the jobs? (a) materials manager (b) builder (c) team leader (d) tester
  6. 6.True or false: to give kind feedback is good teamwork. (a) True (b) False
  7. 7.🤝 A team of 2 shares 12 equal jobs fairly. Each job takes 7 minutes. How many minutes does each person work?
  8. 8.True or false: to give kind feedback is poor teamwork. (a) True (b) False
  9. 9.🤝 A team of 5 shares 25 equal jobs fairly. Each job takes 2 minutes. How many minutes does each person work?
  10. 10.True or false: to do all the work alone is poor teamwork. (a) True (b) False
  11. 11.🤝 A team of 4 shares 24 equal jobs fairly. Each job takes 7 minutes. How many minutes does each person work?
  12. 12.🤝 A team of 4 shares 24 equal jobs fairly. Each job takes 3 minutes. How many minutes does each person work?
  13. 13.🤝 In a design team, who keeps the team on track? (a) builder (b) recorder (c) materials manager (d) team leader
  14. 14.🤝 Is it good or poor teamwork to own up to a mistake? (a) good teamwork (b) poor teamwork
  15. 15.True or false: to help a stuck teammate is poor teamwork. (a) False (b) True
  16. 16.True or false: to blame others for faults is good teamwork. (a) False (b) True
  17. 17.🤝 In a design team, who cuts and joins parts? (a) recorder (b) builder (c) tester (d) team leader
  18. 18.What does the team leader do? (a) shares out the jobs (b) keeps the design notes (c) collects the supplies (d) cuts and joins parts
  19. 19.What does the tester do? (a) cuts and joins parts (b) runs the tests (c) shares out the jobs (d) keeps the team on track
  20. 20.🤝 Is it good or poor teamwork to agree before changing? (a) good teamwork (b) poor teamwork
  21. 21.🤝 A team plans for 55 minutes, builds for 55 minutes and then tests for 5 minutes, one after another. How many minutes is that in all?
  22. 22.🤝 A team of 3 shares 9 equal jobs fairly. Each job takes 6 minutes. How many minutes does each person work?
  23. 23.🤝 How do engineers share a design with others? (a) clear labelled sketches (b) only talking fast (c) no drawings at all (d) secret notes
  24. 24.What does the recorder do? (a) collects the supplies (b) puts the model together (c) shares out the jobs (d) keeps the design notes
  25. 25.True or false: to hide a mistake is good teamwork. (a) True (b) False
  26. 26.True or false: to talk over others is poor teamwork. (a) False (b) True
  27. 27.What does the recorder do? (a) writes down results (b) puts the model together (c) keeps the team on track (d) checks the goals are met
  28. 28.🤝 Is it good or poor teamwork to hide a mistake? (a) good teamwork (b) poor teamwork
  29. 29.🤝 Is it good or poor teamwork to listen to every idea? (a) poor teamwork (b) good teamwork
  30. 30.🤝 In a design team, who keeps the design notes? (a) team leader (b) tester (c) recorder (d) materials manager
  31. 31.🤝 In a design team, who checks the goals are met? (a) materials manager (b) team leader (c) recorder (d) tester
  32. 32.True or false: to agree before changing is good teamwork. (a) False (b) True
  33. 33.🤝 Is it good or poor teamwork to share the work fairly? (a) good teamwork (b) poor teamwork
  34. 34.🤝 Is it good or poor teamwork to blame others for faults? (a) poor teamwork (b) good teamwork
  35. 35.What does the builder do? (a) checks the goals are met (b) keeps the design notes (c) puts the model together (d) shares out the jobs
  36. 36.What does the builder do? (a) keeps the design notes (b) cuts and joins parts (c) writes down results (d) keeps the team on track
  37. 37.🤝 A team of 3 shares 18 equal jobs fairly. Each job takes 10 minutes. How many minutes does each person work?
  38. 38.What does the materials manager do? (a) puts the model together (b) keeps the design notes (c) runs the tests (d) tracks what is used up
  39. 39.What does the materials manager do? (a) writes down results (b) puts the model together (c) keeps the team on track (d) collects the supplies
  40. 40.🤝 A teammate’s idea seems odd. What should you do first? (a) laugh at it (b) ignore it (c) listen and ask why (d) walk away

Answer key

  1. False
  2. many skills and ideas
  3. good teamwork
  4. 4
  5. team leader
  6. True
  7. 42
  8. False
  9. 10
  10. True
  11. 42
  12. 18
  13. team leader
  14. good teamwork
  15. False
  16. False
  17. builder
  18. shares out the jobs
  19. runs the tests
  20. good teamwork
  21. 115
  22. 18
  23. clear labelled sketches
  24. keeps the design notes
  25. False
  26. True
  27. writes down results
  28. poor teamwork
  29. good teamwork
  30. recorder
  31. tester
  32. True
  33. good teamwork
  34. poor teamwork
  35. puts the model together
  36. cuts and joins parts
  37. 60
  38. tracks what is used up
  39. collects the supplies
  40. listen and ask why