HCF and LCM Word Problems Worksheet
The method (LCM or HCF?): Bells, lights, runners “together again”: find the LCM of the gaps. Biggest can, rope piece or tile that fits exactly: find the HCF. Leaves the same remainder r every time: LCM + r. Number of tiles = (length ÷ tile side) × (width ÷ tile side).
NameDateTime takenScore ___ / 40
- 1.A hall floor is 125 cm long and 75 cm wide. It is covered with the largest square tiles that fit exactly. How many tiles are needed?
- 2.Find the smallest number bigger than 15 that leaves a remainder of 1 when divided by 15, 4 or 10.
- 3.Tara takes 90 seconds and Kabir takes 60 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 4.Rohan takes 54 seconds and Aarav takes 72 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 5.Three temple bells ring every 5, 9 and 6 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 6.Karan takes 75 seconds and Aditya takes 45 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 7.Find the smallest number bigger than 9 that leaves a remainder of 2 when divided by 6, 8 or 9.
- 8.Two tanks hold 90 litres and 40 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 9.Two tanks hold 10 litres and 25 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 10.Three temple bells ring every 18, 9 and 10 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 11.Find the smallest number bigger than 12 that leaves a remainder of 2 when divided by 6, 8 or 12.
- 12.Ishaan takes 40 seconds and Arjun takes 36 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 13.Aditya takes 45 seconds and Tara takes 48 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 14.Three temple bells ring every 15, 6 and 5 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 15.Find the smallest number bigger than 9 that leaves a remainder of 1 when divided by 5, 6 or 9.
- 16.Diya takes 90 seconds and Zoya takes 48 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 17.Find the smallest number bigger than 15 that leaves a remainder of 2 when divided by 4, 5 or 15.
- 18.Three temple bells ring every 8, 6 and 4 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 19.Three temple bells ring every 12, 30 and 24 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 20.Two tanks hold 90 litres and 20 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 21.Two tanks hold 15 litres and 35 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 22.Three temple bells ring every 10, 6 and 9 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 23.Three temple bells ring every 6, 5 and 15 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 24.Dev takes 45 seconds and Diya takes 50 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 25.Three temple bells ring every 8, 20 and 24 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 26.Two tanks hold 100 litres and 250 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 27.Priya takes 48 seconds and Rohan takes 30 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 28.Two tanks hold 20 litres and 70 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 29.Three temple bells ring every 24, 30 and 10 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 30.A hall floor is 75 cm long and 50 cm wide. It is covered with the largest square tiles that fit exactly. How many tiles are needed?
- 31.Two tanks hold 180 litres and 225 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 32.Arjun takes 80 seconds and Tara takes 72 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 33.Rohan takes 50 seconds and Farhan takes 40 seconds to run once round a track. They start together from the start line. After how many seconds will they first be at the start line together again?
- 34.Find the smallest number bigger than 10 that leaves a remainder of 1 when divided by 6, 10 or 8.
- 35.Two tanks hold 70 litres and 40 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 36.Two tanks hold 125 litres and 225 litres of milk. What is the biggest can (in litres) that can empty both tanks exactly, with no milk left over?
- 37.Three temple bells ring every 6, 10 and 24 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
- 38.A hall floor is 120 cm long and 80 cm wide. It is covered with the largest square tiles that fit exactly. How many tiles are needed?
- 39.A hall floor is 400 cm long and 150 cm wide. It is covered with the largest square tiles that fit exactly. How many tiles are needed?
- 40.Three temple bells ring every 4, 15 and 24 minutes. They ring together at 9:00 am. After how many minutes will they next ring together?
Answer key
- 15
- 61
- 180
- 216
- 90
- 225
- 74
- 10
- 5
- 90
- 26
- 360
- 720
- 30
- 91
- 720
- 62
- 24
- 120
- 10
- 5
- 90
- 30
- 450
- 120
- 50
- 240
- 10
- 120
- 6
- 45
- 720
- 200
- 121
- 10
- 25
- 120
- 6
- 24
- 120
Free quantitative aptitude lessons, practice and worksheets at talentjr.in/quantitative-aptitude