Robotics Worksheet: Factory Robots
Robot tip (Per minute × minutes): Total = rate × time (6 boxes a minute for 5 minutes = 30 boxes). Time = total ÷ rate (60 bottles at 10 a minute = 6 minutes). Change minutes to seconds when the rate is per second: 2 minutes = 120 seconds.
NameDateTime takenScore ___ / 40
- 1.🏭 5 robots each sort 45 parcels an hour. How many parcels do they sort together in 7 hours?
- 2.🏭 A conveyor belt moves 8 cm each second. How many seconds does a part take to travel 112 cm?
- 3.🏭 A robot that picks up an item and puts it in another place is called … (a) a pick-and-place robot (b) a talking robot (c) a space robot (d) a lawn robot
- 4.Which job is done by a painting robot? (a) seals the cartons (b) sprays car bodies evenly (c) joins metal parts (d) puts items in boxes
- 5.🏭 Why do car factories use robot arms for welding? (a) they like heat (b) they never move (c) they are cheap toys (d) fast, exact and tireless
- 6.🏭 Which factory robot checks with a camera? (a) a welding robot (b) an inspection robot (c) a painting robot (d) a pick-and-place robot
- 7.🏭 Which factory robot uses heat to join steel? (a) a packing robot (b) a welding robot (c) a painting robot (d) a pick-and-place robot
- 8.🏭 A robot arm packs 3 boxes every minute. How many boxes does it pack in 5 minutes?
- 9.🏭 Which job is a factory robot arm best at? (a) telling jokes (b) making new friends (c) choosing a new design (d) one task again and again
- 10.🏭 A robot arm puts caps on 7 bottles each minute. How many minutes does it take to cap 28 bottles?
- 11.🏭 A conveyor belt moves 6 cm each second. How many seconds does a part take to travel 42 cm?
- 12.🏭 6 robots each sort 35 parcels an hour. How many parcels do they sort together in 3 hours?
- 13.🏭 A conveyor belt moves 10 cm each second. How many seconds does a part take to travel 50 cm?
- 14.🏭 A welding robot takes 5 seconds for each weld. How many welds does it finish in 1 minute?
- 15.🏭 What carries parts from one robot to the next in a factory? (a) a conveyor belt (b) a garden hose (c) a ladder (d) a kite
- 16.🏭 A robot arm packs 12 boxes every minute. How many boxes does it pack in 2 minutes?
- 17.Which job is done by a packing robot? (a) seals the cartons (b) puts chips on a board (c) moves parts onto a belt (d) uses heat to join steel
- 18.🏭 Which factory robot seals the cartons? (a) a welding robot (b) a packing robot (c) a painting robot (d) an inspection robot
- 19.Which job is done by an inspection robot? (a) coats parts with paint (b) spots faulty parts (c) sprays car bodies evenly (d) joins metal parts
- 20.🏭 Which factory robot puts chips on a board? (a) a painting robot (b) a packing robot (c) a pick-and-place robot (d) an inspection robot
- 21.Which job is done by a welding robot? (a) puts items in boxes (b) checks with a camera (c) uses heat to join steel (d) moves parts onto a belt
- 22.🏭 A robot arm packs 11 boxes every minute. How many boxes does it pack in 5 minutes?
- 23.Which job is done by a pick-and-place robot? (a) seals the cartons (b) moves parts onto a belt (c) uses heat to join steel (d) spots faulty parts
- 24.🏭 A robot arm packs 9 boxes every minute. How many boxes does it pack in 4 minutes?
- 25.🏭 A welding robot takes 5 seconds for each weld. How many welds does it finish in 4 minutes?
- 26.Which job is done by a welding robot? (a) moves parts onto a belt (b) sprays car bodies evenly (c) joins metal parts (d) puts chips on a board
- 27.🏭 A welding robot takes 6 seconds for each weld. How many welds does it finish in 3 minutes?
- 28.🏭 A robot arm packs 11 boxes every minute. How many boxes does it pack in 7 minutes?
- 29.🏭 A welding robot takes 6 seconds for each weld. How many welds does it finish in 1 minute?
- 30.🏭 Which factory robot puts items in boxes? (a) an inspection robot (b) a pick-and-place robot (c) a welding robot (d) a packing robot
- 31.🏭 A robot arm puts caps on 10 bottles each minute. How many minutes does it take to cap 40 bottles?
- 32.🏭 A robot arm packs 2 boxes every minute. How many boxes does it pack in 2 minutes?
- 33.🏭 A conveyor belt moves 5 cm each second. How many seconds does a part take to travel 75 cm?
- 34.Which job is done by a painting robot? (a) uses heat to join steel (b) seals the cartons (c) moves parts onto a belt (d) coats parts with paint
- 35.🏭 3 robots each sort 60 parcels an hour. How many parcels do they sort together in 4 hours?
- 36.🏭 A welding robot takes 6 seconds for each weld. How many welds does it finish in 4 minutes?
- 37.🏭 Which factory robot moves parts onto a belt? (a) an inspection robot (b) a packing robot (c) a painting robot (d) a pick-and-place robot
- 38.🏭 A conveyor belt moves 6 cm each second. How many seconds does a part take to travel 84 cm?
- 39.🏭 A robot arm packs 7 boxes every minute. How many boxes does it pack in 3 minutes?
- 40.🏭 A robot arm packs 5 boxes every minute. How many boxes does it pack in 7 minutes?
Answer key
- 1575
- 14
- a pick-and-place robot
- sprays car bodies evenly
- fast, exact and tireless
- an inspection robot
- a welding robot
- 15
- one task again and again
- 4
- 7
- 630
- 5
- 12
- a conveyor belt
- 24
- seals the cartons
- a packing robot
- spots faulty parts
- a pick-and-place robot
- uses heat to join steel
- 55
- moves parts onto a belt
- 36
- 48
- joins metal parts
- 30
- 77
- 10
- a packing robot
- 4
- 4
- 15
- coats parts with paint
- 720
- 40
- a pick-and-place robot
- 14
- 21
- 35
Free robotics lessons, practice and worksheets at talentjr.in/robotics-for-kids