Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.True or false: a fixed pulley hangs on the rope loop. (a) True (b) False
- 2.🔺 Which shape keeps its shape best when its corners are pinned? (a) rectangle (b) triangle (c) hexagon (d) square
- 3.🔍 Which is the odd one out? (a) a water filter (b) a banyan tree (c) a mountain (d) a waterfall
- 4.🔍 Which is the odd one out? (a) change only one thing (b) guess, do not measure (c) measure the same way (d) record every result
- 5.📋 Criteria are … (a) the team names (b) the tools you use (c) the limits on money (d) goals a design must meet
- 6.🔢 To follow the engineering design process, what comes right after “Imagine”? (a) Plan (b) Test (c) Improve (d) Ask
- 7.🌉 Which bridge type: “cables tied down at ends”? (a) arch bridge (b) suspension bridge (c) beam bridge
- 8.♻️ Reduce, reuse or recycle: turn plastic into tiles? (a) reduce (b) recycle (c) reuse
- 9.True or false: a fridge helps people keep food fresh longer. (a) False (b) True
- 10.🪢 Compression is a force that … (a) makes light (b) pushes or squeezes (c) pulls or stretches (d) cools things
- 11.⚖️ On a seesaw, a heavier child should sit … (a) anywhere (b) farther from the pivot (c) on the pivot (d) closer to the pivot
- 12.🤝 How do engineers share a design with others? (a) clear labelled sketches (b) only talking fast (c) secret notes (d) no drawings at all
- 13.True or false: a fixed pulley needs effort = load. (a) True (b) False
- 14.True or false: to play near a moving drill is safe. (a) False (b) True
- 15.Which need does a lift meet? (a) reach a top floor fast (b) see very tiny things (c) make power from sunlight (d) store water for summer
- 16.🛠️ People need to see very tiny things. Which invention helps? (a) a microscope (b) a dam (c) a telephone (d) a water filter
- 17.🧑🔧 Which branch of engineering works on aeroplanes and rockets? (a) civil (b) computer (c) chemical (d) aerospace
- 18.📋 For a model bridge challenge, is “carry 10 coins” a constraint or a criterion? (a) a constraint (b) a criterion
- 19.📐 On a plan, 1 cm stands for 5 m. A real bridge is 70 m long. How long is it on the plan, in centimetres?
- 20.🔺 A flat frame has 7 straight sides joined by loose pins at the corners. What is the least number of corner-to-corner braces needed to make it rigid?
- 21.⚖️ A seesaw balances. Asha (480 N) sits 1 m from the pivot on one side; Meena (? N) sits 3 m from the pivot on the other side. What is the missing weight in newtons?
- 22.🤝 In a design team, who cuts and joins parts? (a) recorder (b) tester (c) builder (d) team leader
- 23.♻️ Reduce, reuse or recycle: plant in old tyres? (a) reduce (b) recycle (c) reuse
- 24.🧪 The first prototype held 110 g. After the team improved it, the new prototype held 210 g. How many more grams did it hold?
- 25.Which of these is an inclined plane? (a) a round doorknob (b) the tip of a nail (c) a wood screw (d) a playground slide
- 26.🔍 Which is the odd one out? (a) a crane lifting cable (b) a squeezed spring (c) a tall bridge tower (d) a temple column
- 27.⚖️ In a class 1 lever, what is in the middle? (a) the fulcrum (b) the effort (c) nothing (d) the load
- 28.True or false: “a rope bridge in hills” is an arch bridge. (a) False (b) True
- 29.🔢 To follow the engineering design process, what comes right after “Ask”? (a) Test (b) Plan (c) Imagine (d) Create
- 30.📐 On a plan, 1 cm stands for 5 m. A wall is 17 cm long on the plan. How long is the real wall, in metres?
- 31.🔄 Which design-process step is it to draw a labelled diagram? (a) Create (b) Plan (c) Ask (d) Imagine
- 32.True or false: a mobile phone is made by engineers. (a) False (b) True
- 33.🌉 A beam bridge 165 m long rests on the two river banks and on piers in between, making equal spans of 15 m. How many piers are there?
- 34.📋 For a model bridge challenge, is “finish in 40 minutes” a constraint or a criterion? (a) a constraint (b) a criterion
- 35.Which of these is a pulley? (a) a screw jack (b) a flagpole rope wheel (c) a round doorknob (d) a well winch handle
- 36.🏋️ A machine lifts a load of 600 N when you push with 150 N. What is its mechanical advantage (MA)?
- 37.What does the team leader do? (a) shares out the jobs (b) puts the model together (c) writes down results (d) tracks what is used up
- 38.🔍 Which is the odd one out? (a) a satellite (b) a bridge (c) a rainbow (d) a railway track
- 39.True or false: to grip and bend wire, use pliers. (a) False (b) True
- 40.Which of these is reuse (use again)? (a) switch off unused lights (b) turn plastic into tiles (c) refill a water bottle (d) buy less packaging
Answer key
- False
- triangle
- a water filter
- guess, do not measure
- goals a design must meet
- Plan
- suspension bridge
- recycle
- True
- pushes or squeezes
- closer to the pivot
- clear labelled sketches
- True
- False
- reach a top floor fast
- a microscope
- aerospace
- a criterion
- 14
- 4
- 160
- builder
- reuse
- 100
- a playground slide
- a crane lifting cable
- the fulcrum
- False
- Imagine
- 85
- Plan
- True
- 10
- a constraint
- a flagpole rope wheel
- 4
- shares out the jobs
- a rainbow
- True
- refill a water bottle
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids