Engineering Worksheet: Final Test
Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.📐 A model car is drawn so that 1 cm stands for 20 cm. The car is 15 cm long in the drawing. How long is the real car, in centimetres?
- 2.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 3.🔍 Which is the odd one out? (a) finish in 40 minutes (b) be under 30 cm tall (c) use at most 20 straws (d) hold up 500 g
- 4.🔍 Which is the odd one out? (a) a crane hook block (b) a crowbar (c) a seesaw (d) a nutcracker
- 5.🤝 Is it good or poor teamwork to agree before changing? (a) good teamwork (b) poor teamwork
- 6.Which of these needs a heat insulator? (a) an umbrella cover (b) a skipping rope (c) a boat hull (d) an oven glove
- 7.🪢 A beam rests on two supports and is pressed down in the middle. Its bottom edge is … (a) squeezed (compression) (b) not affected (c) twisted (d) stretched (tension)
- 8.🧪 Three prototype bridges were tested with the same method. Design A held 270 g, design B held 320 g and design C held 220 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 9.🔍 Which is the odd one out? (a) dry wood (b) cotton cloth (c) plastic (d) graphite
- 10.🔍 Which is the odd one out? (a) repeat each test (b) test it only once (c) use a new load each time (d) skip writing results
- 11.🤝 In a design team, who shares out the jobs? (a) recorder (b) builder (c) tester (d) team leader
- 12.🔄 In which step do engineers draw a labelled diagram? (a) Test (b) Improve (c) Ask (d) Plan
- 13.🛠️ People need to carry many people far. Which invention helps? (a) a train (b) a tunnel (c) a microscope (d) a bridge
- 14.🔢 To follow the engineering design process, which comes first: “Ask” or “Test”? (a) Test (b) Ask
- 15.Which of these happens in the Improve step? (a) redesign after testing (b) list the materials (c) make a prototype (d) draw a labelled diagram
- 16.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) choose and draw one (b) load it with coins (c) build it with straws (d) strengthen the weak part
- 17.⚖️ Along a straight bar, measured from the left end, the effort is at 30 cm, the fulcrum at 0 cm and the load at 50 cm. Which class of lever is it? (a) class 1 (b) class 3 (c) class 2
- 18.⚖️ A lever bar balances. The load is 160 N at ? cm from the fulcrum. The effort is 80 N at 20 cm from the fulcrum on the other side. What is the missing distance in centimetres?
- 19.📐 A beam is 930 cm long. How long is it in metres? =
- 20.True or false: a swing chain is in compression (pushed). (a) True (b) False
- 21.📋 A constraint is … (a) a kind of glue (b) a final test (c) a limit you must keep to (d) a goal for success
- 22.True or false: sunlight is a non-renewable energy source. (a) False (b) True
- 23.📋 Criterion: the model bridge must hold at least 1000 g. In the test it held 1100 g. Does it meet the criterion? (a) Yes (b) No
- 24.True or false: to carry scissors closed is safe. (a) False (b) True
- 25.True or false: a telephone helps people make water safe to drink. (a) True (b) False
- 26.True or false: a well-bucket rope wheel is a lever. (a) True (b) False
- 27.🪝 A pulley system has 2 rope sections holding up the load. To lift the load by 5 m, how many metres of rope must you pull?
- 28.⚖️ A seesaw balances. Arjun (? N) sits 1 m from the pivot on one side; Ravi (200 N) sits 3 m from the pivot on the other side. What is the missing weight in newtons?
- 29.🌉 Which bridge type can cross the widest gap in one span? (a) arch bridge (b) beam bridge (c) suspension bridge (d) log bridge
- 30.🔍 Which is the odd one out? (a) a tyre with deep treads (b) a wheel on ball bearings (c) oil on a squeaky hinge (d) a smooth steel slide
- 31.🔺 A beam bends under a load. Its top side is … (a) not affected (b) floating (c) squeezed (compression) (d) stretched (tension)
- 32.True or false: to make a prototype is the Ask step. (a) False (b) True
- 33.🔺 One side of a straw bridge is a row of 13 triangles standing point-up and point-down in turn, each sharing a side with the next. How many straws does it use?
- 34.🏋️ Work is done when a force moves something … (a) without moving it (b) only upwards (c) through a distance (d) very slowly
- 35.⚖️ On a seesaw, a heavier child should sit … (a) anywhere (b) closer to the pivot (c) on the pivot (d) farther from the pivot
- 36.🔺 A frame shaped like a square is made of straws joined by loose pins, with 1 corner-to-corner brace. Is it rigid or wobbly? (a) rigid (b) wobbly
- 37.Which of these is a suspension bridge? (a) deck hangs from cables (b) a log across a stream (c) pushes out on its ends (d) a flat deck on piers
- 38.🤝 In a design team, who collects the supplies? (a) builder (b) team leader (c) materials manager (d) recorder
- 39.🤝 In a design team, who writes down results? (a) tester (b) team leader (c) builder (d) recorder
- 40.🪝 A well winch has a handle (wheel) of radius 25 cm turning an axle of radius 5 cm. What is its mechanical advantage (MA)?
Answer key
- 300
- poor testing
- hold up 500 g
- a crane hook block
- good teamwork
- an oven glove
- stretched (tension)
- design B
- graphite
- repeat each test
- team leader
- Plan
- a train
- Ask
- redesign after testing
- choose and draw one
- class 3
- 10
- 9.3
- False
- a limit you must keep to
- False
- Yes
- True
- False
- False
- 10
- 600
- suspension bridge
- a tyre with deep treads
- squeezed (compression)
- False
- 27
- through a distance
- closer to the pivot
- rigid
- deck hangs from cables
- materials manager
- recorder
- 5
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids