← Final engineering test lesson New set →

Engineering Worksheet: Final Test

Engineering lesson 24: Final engineering test · Set 878 · 40 questions
TalentJR

Engineer's tip (Find the topic, use the idea): Find the topic: design process, force, machine, lever, structure, material, bridge or scale. Use that lesson’s rule — what is in the middle, load × distance = effort × distance, work = force × distance, real = drawing × scale. Write the calculation before you answer.

NameDateTime takenScore ___ / 40
  1. 1.♻️ Is ocean wave energy a renewable or a non-renewable energy source? (a) non-renewable (b) renewable
  2. 2.True or false: an aerospace engineer designs satellites. (a) False (b) True
  3. 3.🧱 Which material is best for a cooking pot handle? (a) copper (b) iron (c) wood or plastic (d) aluminium
  4. 4.🔍 Which is the odd one out? (a) guess, do not measure (b) use a new load each time (c) change only one thing (d) test it only once
  5. 5.🛠️ Which of these is a problem an engineer could solve? (a) a road that floods (b) a sad song (c) a boring story (d) a lost cricket match
  6. 6.What does the builder do? (a) runs the tests (b) writes down results (c) tracks what is used up (d) cuts and joins parts
  7. 7.🤝 A team plans for 10 minutes, builds for 60 minutes and then tests for 10 minutes, one after another. How many minutes is that in all?
  8. 8.Which job does a computer engineer do? (a) refines crude oil (b) plans a dam (c) builds a website (d) builds rockets
  9. 9.🪢 A sign weighing 540 N hangs from 6 identical vertical ropes that share the load equally. What is the tension in each rope, in newtons?
  10. 10.🪝 Fixed or movable pulley: which one hangs on the rope loop? (a) a movable pulley (b) a fixed pulley
  11. 11.🔍 Which is the odd one out? (a) a crowbar (b) a bottle opener (c) a claw hammer on a nail (d) a jar lid
  12. 12.Which of these is in tension (pulled)? (a) a tall bridge tower (b) a bridge pier (c) a tow rope on a car (d) a pillar under a roof
  13. 13.🛠️ People need to cross a wide river. Which invention helps? (a) a telephone (b) a train (c) a fridge (d) a bridge
  14. 14.🪝 A bucket weighing 240 N is lifted with a single fixed pulley at the top of a well. What effort is needed, in newtons? (ideal pulley, no friction)
  15. 15.🤝 A teammate’s idea seems odd. What should you do first? (a) listen and ask why (b) ignore it (c) walk away (d) laugh at it
  16. 16.📋 For a model bridge challenge, is “spend at most ₹100” a constraint or a criterion? (a) a constraint (b) a criterion
  17. 17.🧪 Three prototype bridges were tested with the same method. Design A held 240 g, design B held 290 g and design C held 190 g. Which design was the weakest? (a) design B (b) design C (c) design A
  18. 18.⚖️ Which class of lever is a lemon squeezer? (a) class 3 (b) class 2 (c) class 1
  19. 19.🏋️ A 4 kg box is lifted straight up by 4 m. Taking 1 kg to weigh about 10 N, how much work is done, in joules?
  20. 20.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
  21. 21.🧱 Which material is best for the bars inside concrete? (a) plastic (b) glass (c) steel (d) rubber
  22. 22.🌉 Which bridge type: “tall towers hold cables”? (a) beam bridge (b) suspension bridge (c) arch bridge
  23. 23.True or false: a movable pulley halves the effort. (a) True (b) False
  24. 24.🧱 Which property matters most for a cooking pot handle? (a) waterproof (b) electrical conductor (c) flexible (d) heat insulator
  25. 25.🏚️ What do engineers use to test models of buildings for earthquakes? (a) a shake table (b) a fridge (c) a telescope (d) a microscope
  26. 26.🔍 Which is the odd one out? (a) run while holding tools (b) carry scissors closed (c) clamp wood before sawing (d) let adults use hot glue
  27. 27.True or false: to help a stuck teammate is poor teamwork. (a) True (b) False
  28. 28.True or false: a fixed pulley is on a flagpole top. (a) True (b) False
  29. 29.Which of these makes a building less safe in earthquakes? (a) using a heavy roof (b) adding steel to concrete (c) adding cross bracing (d) fitting rubber base pads
  30. 30.📐 A beam is 910 cm long. How long is it in metres? =
  31. 31.🤝 In a design team, who puts the model together? (a) recorder (b) tester (c) builder (d) team leader
  32. 32.🧱 Which property matters most for a window pane? (a) flexible (b) heat insulator (c) waterproof (d) transparent
  33. 33.🔍 Which is the odd one out? (a) use at most 20 straws (b) fit on a school desk (c) roll at least 2 metres (d) spend at most ₹100
  34. 34.⚙️ Which simple machine is a crane hook block? (a) wheel and axle (b) pulley (c) inclined plane (d) screw
  35. 35.Which job is a protractor for? (a) measure a long length (b) measure an angle (c) check a shelf is level (d) make a hole in wood
  36. 36.True or false: an aerospace engineer designs school networks. (a) True (b) False
  37. 37.⚙️ Which simple machine is a bottle opener? (a) wheel and axle (b) inclined plane (c) pulley (d) lever
  38. 38.🔢 To follow the engineering design process, which comes first: “Ask” or “Imagine”? (a) Ask (b) Imagine
  39. 39.⚖️ Turning effect = force × … (a) mass of fulcrum (b) distance from fulcrum (c) colour of bar (d) time taken
  40. 40.🔢 To follow the engineering design process, which is the LAST step? (a) Imagine (b) Create (c) Test (d) Improve

Answer key

  1. renewable
  2. True
  3. wood or plastic
  4. change only one thing
  5. a road that floods
  6. cuts and joins parts
  7. 80
  8. builds a website
  9. 90
  10. a movable pulley
  11. a jar lid
  12. a tow rope on a car
  13. a bridge
  14. 240
  15. listen and ask why
  16. a constraint
  17. design C
  18. class 2
  19. 160
  20. poor testing
  21. steel
  22. suspension bridge
  23. True
  24. heat insulator
  25. a shake table
  26. run while holding tools
  27. False
  28. True
  29. using a heavy roof
  30. 9.1
  31. builder
  32. transparent
  33. roll at least 2 metres
  34. pulley
  35. measure an angle
  36. False
  37. lever
  38. Ask
  39. distance from fulcrum
  40. Improve

Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids