Engineering Worksheet: Part 1 Test
Engineer's tip (Find the topic, use the idea): Find the topic: invention, branch, design step, limit or goal, testing, teamwork or tools. Use that lesson’s rule — the design process order is ask, imagine, plan, create, test, improve. For number questions, write the calculation before you answer.
NameDateTime takenScore ___ / 40
- 1.📋 Criterion: the model bridge must hold at least 700 g. In the test it held 750 g. Does it meet the criterion? (a) Yes (b) No
- 2.True or false: to hide a mistake is poor teamwork. (a) True (b) False
- 3.🤝 Is it good or poor teamwork to ignore the team plan? (a) poor teamwork (b) good teamwork
- 4.What does the team leader do? (a) runs the tests (b) keeps the design notes (c) checks the goals are met (d) shares out the jobs
- 5.📋 For a model bridge challenge, is “keep ice for 1 hour” a constraint or a criterion? (a) a constraint (b) a criterion
- 6.🧑🔧 Which kind of engineer designs a paint factory? (a) electrical (b) computer (c) mechanical (d) chemical
- 7.True or false: a tunnel helps people go through a mountain. (a) True (b) False
- 8.🤝 Is it good or poor teamwork to laugh at ideas? (a) poor teamwork (b) good teamwork
- 9.🔢 To build and test a straw bridge, which is the FIRST step? (a) load it with coins (b) strengthen the weak part (c) read the challenge rules (d) build it with straws
- 10.🧑🔧 Which kind of engineer runs a fertiliser plant? (a) mechanical (b) chemical (c) biomedical (d) civil
- 11.True or false: a civil engineer designs a paint factory. (a) True (b) False
- 12.True or false: to let adults use hot glue is not safe. (a) True (b) False
- 13.True or false: to find the limits is the Ask step. (a) False (b) True
- 14.True or false: a computer engineer designs knee implants. (a) False (b) True
- 15.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
- 16.📋 Your team’s budget is ₹80. You must buy one roll of tape for ₹20. Straws cost ₹3 each. What is the greatest number of straws you can buy?
- 17.🔄 What is the FIRST step of the engineering design process? (a) Improve (b) Create (c) Test (d) Ask
- 18.🤝 How do engineers share a design with others? (a) secret notes (b) only talking fast (c) no drawings at all (d) clear labelled sketches
- 19.True or false: a mechanical engineer designs car engines. (a) False (b) True
- 20.Which job is a spirit level for? (a) grip and bend wire (b) turn a screw (c) drive in a nail (d) check a shelf is level
- 21.True or false: a bicycle is made by engineers. (a) True (b) False
- 22.True or false: to check a shelf is level, use sandpaper. (a) False (b) True
- 23.📋 A design meets every criterion but costs more than the budget. Is it acceptable? (a) yes, always (b) no, it breaks a limit (c) yes, it works (d) only if it is red
- 24.🔄 Which design-process step is it to draw a labelled diagram? (a) Test (b) Improve (c) Ask (d) Plan
- 25.🔧 Which tool would you use to turn a screw? (a) a screwdriver (b) sandpaper (c) a spanner (d) a tape measure
- 26.🧪 The first prototype held 210 g. After the team improved it, the new prototype held 350 g. How many more grams did it hold?
- 27.🛠️ Is a mobile phone made by engineers or found in nature? (a) found in nature (b) made by engineers
- 28.🔄 Which design-process step is it to check it against goals? (a) Imagine (b) Test (c) Ask (d) Improve
- 29.🛠️ Engineers use maths and which other subject the most? (a) cooking (b) dance (c) science (d) music
- 30.Which of these is made by engineers? (a) a banyan tree (b) a lift (c) a coral reef (d) a cloud
- 31.📋 Constraint: the tower must be no taller than 30 cm. The team’s tower is 28 cm tall. Is it within the constraint? (a) Yes (b) No
- 32.🧪 A paper bridge was tested three times. It held 370 g, 230 g and 330 g. What is the mean (average) load it held, in grams?
- 33.Which job is a protractor for? (a) grip and bend wire (b) smooth a rough edge (c) measure an angle (d) make a hole in wood
- 34.🔍 Which is the odd one out? (a) measure the same way (b) guess, do not measure (c) change only one thing (d) record every result
- 35.🧑🔧 Which kind of engineer plans a power grid? (a) chemical (b) civil (c) computer (d) electrical
- 36.True or false: to give kind feedback is good teamwork. (a) False (b) True
- 37.True or false: to use a new load each time is poor testing. (a) True (b) False
- 38.True or false: an aerospace engineer designs satellites. (a) False (b) True
- 39.True or false: to think of wild ideas is the Create step. (a) True (b) False
- 40.🤝 In a design team, who collects the supplies? (a) materials manager (b) builder (c) team leader (d) recorder
Answer key
- Yes
- True
- poor teamwork
- shares out the jobs
- a criterion
- chemical
- True
- poor teamwork
- read the challenge rules
- chemical
- False
- False
- True
- False
- good testing
- 20
- Ask
- clear labelled sketches
- True
- check a shelf is level
- True
- False
- no, it breaks a limit
- Plan
- a screwdriver
- 140
- made by engineers
- Test
- science
- a lift
- Yes
- 310
- measure an angle
- guess, do not measure
- electrical
- True
- True
- True
- False
- materials manager
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids