Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔍 Which is the odd one out? (a) test it only once (b) record every result (c) change lots at once (d) guess, do not measure
- 2.🔍 Which is the odd one out? (a) use a new load each time (b) record every result (c) change only one thing (d) measure the same way
- 3.🧪 Three prototype bridges were tested with the same method. Design A held 140 g, design B held 240 g and design C held 190 g. Which design was the strongest? (a) design B (b) design C (c) design A
- 4.🔍 Which is the odd one out? (a) hide a failed test (b) repeat each test (c) guess, do not measure (d) change lots at once
- 5.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 6.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 340 g. How many more grams did it hold?
- 7.🧪 The first prototype held 140 g. After the team improved it, the new prototype held 160 g. How many more grams did it hold?
- 8.🧪 A paper bridge was tested three times. It held 320 g, 280 g and 360 g. What is the mean (average) load it held, in grams?
- 9.🧪 In a fair test, how many things do you change at a time? (a) all of them (b) one (c) two (d) none
- 10.True or false: to measure the same way is poor testing. (a) True (b) False
- 11.🧪 Is it good or poor testing to use the same load? (a) poor testing (b) good testing
- 12.🧪 Three prototype bridges were tested with the same method. Design A held 160 g, design B held 260 g and design C held 210 g. Which design was the weakest? (a) design C (b) design B (c) design A
- 13.🧪 A paper bridge was tested three times. It held 260 g, 140 g and 230 g. What is the mean (average) load it held, in grams?
- 14.🧪 What is a prototype? (a) an early test model (b) a broken part (c) the final product (d) a sales poster
- 15.True or false: to record every result is poor testing. (a) True (b) False
- 16.🧪 Is it good or poor testing to use a new load each time? (a) good testing (b) poor testing
- 17.🔍 Which is the odd one out? (a) measure the same way (b) skip writing results (c) use the same load (d) record every result
- 18.🔢 To build and test a straw bridge, which is the LAST step? (a) load it with coins (b) strengthen the weak part (c) choose and draw one (d) read the challenge rules
- 19.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “read the challenge rules”? (a) read the challenge rules (b) load it with coins
- 20.🧪 A paper bridge was tested three times. It held 210 g, 210 g and 210 g. What is the mean (average) load it held, in grams?
- 21.🧪 A paper bridge was tested three times. It held 270 g, 240 g and 240 g. What is the mean (average) load it held, in grams?
- 22.🧪 Three prototype bridges were tested with the same method. Design A held 200 g, design B held 150 g and design C held 100 g. Which design was the strongest? (a) design A (b) design B (c) design C
- 23.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 24.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) strengthen the weak part (b) build it with straws (c) sketch three ideas (d) choose and draw one
- 25.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 280 g, design B held 230 g and design C held 180 g. Which design was the strongest? (a) design B (b) design C (c) design A
- 27.🧪 A paper bridge was tested three times. It held 250 g, 150 g and 80 g. What is the mean (average) load it held, in grams?
- 28.True or false: to change lots at once is good testing. (a) False (b) True
- 29.🧪 The first prototype held 300 g. After the team improved it, the new prototype held 480 g. How many more grams did it hold?
- 30.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “load it with coins”? (a) strengthen the weak part (b) load it with coins
- 31.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “load it with coins”? (a) build it with straws (b) load it with coins
- 32.True or false: to guess, do not measure is poor testing. (a) False (b) True
- 33.🧪 Is it good or poor testing to hide a failed test? (a) poor testing (b) good testing
- 34.🧪 The first prototype held 170 g. After the team improved it, the new prototype held 300 g. How many more grams did it hold?
- 35.🧪 Is it good or poor testing to record every result? (a) good testing (b) poor testing
- 36.True or false: to use the same load is poor testing. (a) False (b) True
- 37.🧪 A paper bridge was tested three times. It held 220 g, 150 g and 290 g. What is the mean (average) load it held, in grams?
- 38.True or false: to hide a failed test is poor testing. (a) False (b) True
- 39.🔍 Which is the odd one out? (a) use the same load (b) record every result (c) guess, do not measure (d) change only one thing
- 40.True or false: to guess, do not measure is good testing. (a) False (b) True
Answer key
- record every result
- use a new load each time
- design B
- repeat each test
- good testing
- 60
- 20
- 320
- one
- False
- good testing
- design A
- 210
- an early test model
- False
- poor testing
- skip writing results
- strengthen the weak part
- read the challenge rules
- 210
- 250
- design A
- good testing
- sketch three ideas
- poor testing
- design A
- 160
- False
- 180
- load it with coins
- build it with straws
- True
- poor testing
- 130
- good testing
- False
- 220
- True
- guess, do not measure
- False
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids