Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🧪 What is a prototype? (a) a sales poster (b) the final product (c) a broken part (d) an early test model
- 2.🧪 Is it good or poor testing to use a new load each time? (a) poor testing (b) good testing
- 3.🧪 Why repeat a test three times? (a) to use more paper (b) the first is wrong (c) it looks busy (d) to get reliable results
- 4.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “load it with coins”? (a) build it with straws (b) load it with coins
- 5.🧪 The first prototype held 180 g. After the team improved it, the new prototype held 320 g. How many more grams did it hold?
- 6.🧪 The first prototype held 210 g. After the team improved it, the new prototype held 310 g. How many more grams did it hold?
- 7.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “strengthen the weak part”? (a) strengthen the weak part (b) load it with coins
- 8.🧪 The first prototype held 260 g. After the team improved it, the new prototype held 430 g. How many more grams did it hold?
- 9.🧪 Is it good or poor testing to guess, do not measure? (a) good testing (b) poor testing
- 10.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
- 11.🧪 A paper bridge was tested three times. It held 310 g, 240 g and 230 g. What is the mean (average) load it held, in grams?
- 12.True or false: to use the same load is poor testing. (a) False (b) True
- 13.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 14.🔍 Which is the odd one out? (a) measure the same way (b) change only one thing (c) use the same load (d) guess, do not measure
- 15.🔍 Which is the odd one out? (a) hide a failed test (b) repeat each test (c) use a new load each time (d) change lots at once
- 16.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 17.🔢 To build and test a straw bridge, which is the LAST step? (a) choose and draw one (b) read the challenge rules (c) strengthen the weak part (d) build it with straws
- 18.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to sell them at once (c) to test ideas cheaply (d) to decorate a room
- 19.🧪 Is it good or poor testing to skip writing results? (a) poor testing (b) good testing
- 20.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 410 g. How many more grams did it hold?
- 21.True or false: to record every result is poor testing. (a) False (b) True
- 22.True or false: to measure the same way is poor testing. (a) True (b) False
- 23.🧪 A paper bridge was tested three times. It held 310 g, 220 g and 250 g. What is the mean (average) load it held, in grams?
- 24.True or false: to use a new load each time is poor testing. (a) True (b) False
- 25.🧪 A paper bridge was tested three times. It held 240 g, 130 g and 290 g. What is the mean (average) load it held, in grams?
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 270 g, design B held 220 g and design C held 170 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 27.🧪 A paper bridge was tested three times. It held 260 g, 90 g and 160 g. What is the mean (average) load it held, in grams?
- 28.🧪 A paper bridge was tested three times. It held 330 g, 200 g and 250 g. What is the mean (average) load it held, in grams?
- 29.🧪 Is it good or poor testing to record every result? (a) poor testing (b) good testing
- 30.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 360 g. How many more grams did it hold?
- 31.🔍 Which is the odd one out? (a) use a new load each time (b) guess, do not measure (c) skip writing results (d) use the same load
- 32.🧪 Is it good or poor testing to use the same load? (a) good testing (b) poor testing
- 33.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 34.🧪 The first prototype held 60 g. After the team improved it, the new prototype held 150 g. How many more grams did it hold?
- 35.🧪 In a fair test, how many things do you change at a time? (a) one (b) all of them (c) two (d) none
- 36.🧪 Three prototype bridges were tested with the same method. Design A held 240 g, design B held 140 g and design C held 190 g. Which design was the weakest? (a) design B (b) design A (c) design C
- 37.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 38.True or false: to use the same load is good testing. (a) True (b) False
- 39.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) build it with straws (b) load it with coins (c) read the challenge rules (d) choose and draw one
- 40.🧪 Three prototype bridges were tested with the same method. Design A held 200 g, design B held 250 g and design C held 150 g. Which design was the strongest? (a) design B (b) design C (c) design A
Answer key
- an early test model
- poor testing
- to get reliable results
- build it with straws
- 140
- 100
- load it with coins
- 170
- poor testing
- good testing
- 260
- False
- poor testing
- guess, do not measure
- repeat each test
- poor testing
- strengthen the weak part
- to test ideas cheaply
- poor testing
- 130
- False
- False
- 260
- True
- 220
- design C
- 170
- 260
- good testing
- 80
- use the same load
- good testing
- good testing
- 90
- one
- design B
- poor testing
- True
- choose and draw one
- design B
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids