Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🧪 Why repeat a test three times? (a) the first is wrong (b) it looks busy (c) to get reliable results (d) to use more paper
- 2.🔍 Which is the odd one out? (a) guess, do not measure (b) record every result (c) skip writing results (d) use a new load each time
- 3.True or false: to change only one thing is poor testing. (a) True (b) False
- 4.True or false: to change lots at once is poor testing. (a) True (b) False
- 5.True or false: to repeat each test is poor testing. (a) False (b) True
- 6.True or false: to change lots at once is good testing. (a) False (b) True
- 7.🔍 Which is the odd one out? (a) repeat each test (b) change only one thing (c) guess, do not measure (d) measure the same way
- 8.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 9.🧪 A paper bridge was tested three times. It held 300 g, 230 g and 220 g. What is the mean (average) load it held, in grams?
- 10.True or false: to test it only once is poor testing. (a) False (b) True
- 11.🔢 To build and test a straw bridge, which is the LAST step? (a) choose and draw one (b) read the challenge rules (c) build it with straws (d) strengthen the weak part
- 12.🧪 What is a prototype? (a) a broken part (b) the final product (c) an early test model (d) a sales poster
- 13.🧪 Three prototype bridges were tested with the same method. Design A held 300 g, design B held 400 g and design C held 350 g. Which design was the weakest? (a) design B (b) design A (c) design C
- 14.🧪 Is it good or poor testing to use the same load? (a) good testing (b) poor testing
- 15.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) load it with coins (b) sketch three ideas (c) choose and draw one (d) build it with straws
- 16.🔢 To build and test a straw bridge, which is the FIRST step? (a) strengthen the weak part (b) sketch three ideas (c) read the challenge rules (d) build it with straws
- 17.🧪 Three prototype bridges were tested with the same method. Design A held 180 g, design B held 230 g and design C held 130 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 18.True or false: to guess, do not measure is good testing. (a) False (b) True
- 19.True or false: to use the same load is good testing. (a) True (b) False
- 20.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “strengthen the weak part”? (a) strengthen the weak part (b) load it with coins
- 21.True or false: to record every result is good testing. (a) True (b) False
- 22.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 200 g. How many more grams did it hold?
- 23.🧪 Three prototype bridges were tested with the same method. Design A held 300 g, design B held 250 g and design C held 350 g. Which design was the weakest? (a) design C (b) design B (c) design A
- 24.🧪 The first prototype held 110 g. After the team improved it, the new prototype held 180 g. How many more grams did it hold?
- 25.🧪 In a fair test, how many things do you change at a time? (a) two (b) none (c) one (d) all of them
- 26.🔍 Which is the odd one out? (a) use the same load (b) measure the same way (c) skip writing results (d) repeat each test
- 27.🧪 A paper bridge was tested three times. It held 330 g, 210 g and 330 g. What is the mean (average) load it held, in grams?
- 28.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) build it with straws (b) strengthen the weak part (c) load it with coins (d) sketch three ideas
- 29.🧪 Is it good or poor testing to repeat each test? (a) poor testing (b) good testing
- 30.🧪 A paper bridge was tested three times. It held 360 g, 340 g and 350 g. What is the mean (average) load it held, in grams?
- 31.🧪 Three prototype bridges were tested with the same method. Design A held 280 g, design B held 230 g and design C held 330 g. Which design was the strongest? (a) design A (b) design B (c) design C
- 32.🧪 A paper bridge was tested three times. It held 350 g, 270 g and 190 g. What is the mean (average) load it held, in grams?
- 33.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 350 g. How many more grams did it hold?
- 34.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “strengthen the weak part”? (a) strengthen the weak part (b) sketch three ideas
- 35.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to sell them at once (c) to decorate a room (d) to test ideas cheaply
- 36.🧪 A paper bridge was tested three times. It held 200 g, 140 g and 200 g. What is the mean (average) load it held, in grams?
- 37.🧪 A paper bridge was tested three times. It held 310 g, 290 g and 330 g. What is the mean (average) load it held, in grams?
- 38.🔍 Which is the odd one out? (a) use a new load each time (b) skip writing results (c) use the same load (d) guess, do not measure
- 39.🔍 Which is the odd one out? (a) change lots at once (b) use a new load each time (c) hide a failed test (d) change only one thing
- 40.🧪 The first prototype held 230 g. After the team improved it, the new prototype held 260 g. How many more grams did it hold?
Answer key
- to get reliable results
- record every result
- False
- True
- False
- False
- guess, do not measure
- good testing
- 250
- True
- strengthen the weak part
- an early test model
- design A
- good testing
- sketch three ideas
- read the challenge rules
- design C
- False
- True
- load it with coins
- True
- 100
- design B
- 70
- one
- skip writing results
- 290
- build it with straws
- good testing
- 350
- design C
- 270
- 70
- sketch three ideas
- to test ideas cheaply
- 180
- 310
- use the same load
- change only one thing
- 30
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids