Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔍 Which is the odd one out? (a) skip writing results (b) test it only once (c) record every result (d) use a new load each time
- 2.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 3.True or false: to change lots at once is good testing. (a) True (b) False
- 4.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 5.🧪 Three prototype bridges were tested with the same method. Design A held 290 g, design B held 390 g and design C held 340 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 6.🔍 Which is the odd one out? (a) guess, do not measure (b) skip writing results (c) repeat each test (d) change lots at once
- 7.🔍 Which is the odd one out? (a) change only one thing (b) use the same load (c) repeat each test (d) guess, do not measure
- 8.🧪 Why do engineers make prototypes? (a) to test ideas cheaply (b) to sell them at once (c) to decorate a room (d) to avoid testing
- 9.🧪 A paper bridge was tested three times. It held 280 g, 150 g and 200 g. What is the mean (average) load it held, in grams?
- 10.🧪 Is it good or poor testing to skip writing results? (a) good testing (b) poor testing
- 11.🧪 A paper bridge was tested three times. It held 300 g, 140 g and 220 g. What is the mean (average) load it held, in grams?
- 12.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “strengthen the weak part”? (a) build it with straws (b) strengthen the weak part
- 13.🧪 The first prototype held 120 g. After the team improved it, the new prototype held 140 g. How many more grams did it hold?
- 14.🧪 A paper bridge was tested three times. It held 270 g, 130 g and 140 g. What is the mean (average) load it held, in grams?
- 15.True or false: to use the same load is good testing. (a) False (b) True
- 16.🧪 What is a prototype? (a) the final product (b) an early test model (c) a sales poster (d) a broken part
- 17.🔢 To build and test a straw bridge, which comes first: “read the challenge rules” or “sketch three ideas”? (a) sketch three ideas (b) read the challenge rules
- 18.🧪 Three prototype bridges were tested with the same method. Design A held 350 g, design B held 300 g and design C held 250 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 19.🧪 Three prototype bridges were tested with the same method. Design A held 100 g, design B held 200 g and design C held 150 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 20.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “sketch three ideas”? (a) sketch three ideas (b) load it with coins
- 21.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 150 g. How many more grams did it hold?
- 22.🧪 A paper bridge was tested three times. It held 290 g, 150 g and 310 g. What is the mean (average) load it held, in grams?
- 23.True or false: to guess, do not measure is good testing. (a) False (b) True
- 24.🧪 In a fair test, how many things do you change at a time? (a) two (b) all of them (c) one (d) none
- 25.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
- 26.🧪 A paper bridge was tested three times. It held 390 g, 200 g and 280 g. What is the mean (average) load it held, in grams?
- 27.🔍 Which is the odd one out? (a) change only one thing (b) use the same load (c) skip writing results (d) repeat each test
- 28.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “build it with straws”? (a) load it with coins (b) build it with straws
- 29.🧪 A paper bridge was tested three times. It held 210 g, 120 g and 180 g. What is the mean (average) load it held, in grams?
- 30.🧪 Three prototype bridges were tested with the same method. Design A held 370 g, design B held 320 g and design C held 270 g. Which design was the weakest? (a) design B (b) design A (c) design C
- 31.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 32.True or false: to skip writing results is good testing. (a) True (b) False
- 33.🧪 Three prototype bridges were tested with the same method. Design A held 190 g, design B held 140 g and design C held 240 g. Which design was the weakest? (a) design C (b) design A (c) design B
- 34.🧪 A paper bridge was tested three times. It held 350 g, 230 g and 380 g. What is the mean (average) load it held, in grams?
- 35.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) read the challenge rules (b) sketch three ideas (c) strengthen the weak part (d) build it with straws
- 36.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 170 g. How many more grams did it hold?
- 37.🧪 A paper bridge was tested three times. It held 240 g, 160 g and 110 g. What is the mean (average) load it held, in grams?
- 38.True or false: to measure the same way is poor testing. (a) False (b) True
- 39.True or false: to measure the same way is good testing. (a) False (b) True
- 40.🧪 Why repeat a test three times? (a) it looks busy (b) to use more paper (c) to get reliable results (d) the first is wrong
Answer key
- record every result
- poor testing
- False
- poor testing
- design A
- repeat each test
- guess, do not measure
- to test ideas cheaply
- 210
- poor testing
- 220
- build it with straws
- 20
- 180
- True
- an early test model
- read the challenge rules
- design A
- design A
- sketch three ideas
- 50
- 250
- False
- one
- good testing
- 290
- skip writing results
- build it with straws
- 170
- design C
- good testing
- False
- design B
- 320
- build it with straws
- 70
- 170
- False
- True
- to get reliable results
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids