Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, which is the FIRST step? (a) sketch three ideas (b) read the challenge rules (c) strengthen the weak part (d) load it with coins
- 2.🧪 The first prototype held 300 g. After the team improved it, the new prototype held 440 g. How many more grams did it hold?
- 3.True or false: to change only one thing is poor testing. (a) False (b) True
- 4.🧪 A paper bridge was tested three times. It held 230 g, 110 g and 140 g. What is the mean (average) load it held, in grams?
- 5.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “build it with straws”? (a) load it with coins (b) build it with straws
- 6.🧪 Is it good or poor testing to record every result? (a) poor testing (b) good testing
- 7.🔍 Which is the odd one out? (a) use the same load (b) hide a failed test (c) test it only once (d) guess, do not measure
- 8.🧪 Why repeat a test three times? (a) the first is wrong (b) it looks busy (c) to get reliable results (d) to use more paper
- 9.🔍 Which is the odd one out? (a) record every result (b) use a new load each time (c) repeat each test (d) measure the same way
- 10.🧪 The first prototype held 250 g. After the team improved it, the new prototype held 280 g. How many more grams did it hold?
- 11.🧪 Is it good or poor testing to repeat each test? (a) poor testing (b) good testing
- 12.🧪 In a fair test, how many things do you change at a time? (a) one (b) all of them (c) two (d) none
- 13.🧪 A paper bridge was tested three times. It held 310 g, 250 g and 340 g. What is the mean (average) load it held, in grams?
- 14.🧪 Why do engineers make prototypes? (a) to sell them at once (b) to avoid testing (c) to test ideas cheaply (d) to decorate a room
- 15.🧪 Three prototype bridges were tested with the same method. Design A held 190 g, design B held 240 g and design C held 140 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 16.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 17.🧪 The first prototype held 160 g. After the team improved it, the new prototype held 180 g. How many more grams did it hold?
- 18.🧪 What is a prototype? (a) a sales poster (b) the final product (c) an early test model (d) a broken part
- 19.🧪 Is it good or poor testing to use the same load? (a) poor testing (b) good testing
- 20.True or false: to hide a failed test is good testing. (a) True (b) False
- 21.🧪 A paper bridge was tested three times. It held 380 g, 240 g and 310 g. What is the mean (average) load it held, in grams?
- 22.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “load it with coins”? (a) load it with coins (b) strengthen the weak part
- 23.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) build it with straws (b) strengthen the weak part (c) load it with coins (d) sketch three ideas
- 24.True or false: to guess, do not measure is good testing. (a) False (b) True
- 25.🧪 Three prototype bridges were tested with the same method. Design A held 130 g, design B held 180 g and design C held 230 g. Which design was the strongest? (a) design C (b) design A (c) design B
- 26.🧪 Three prototype bridges were tested with the same method. Design A held 340 g, design B held 390 g and design C held 290 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 27.🧪 Three prototype bridges were tested with the same method. Design A held 270 g, design B held 370 g and design C held 320 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 28.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “strengthen the weak part”? (a) strengthen the weak part (b) build it with straws
- 29.True or false: to measure the same way is poor testing. (a) False (b) True
- 30.🔢 To build and test a straw bridge, which is the LAST step? (a) strengthen the weak part (b) sketch three ideas (c) choose and draw one (d) read the challenge rules
- 31.🧪 The first prototype held 260 g. After the team improved it, the new prototype held 330 g. How many more grams did it hold?
- 32.🧪 A paper bridge was tested three times. It held 230 g, 60 g and 160 g. What is the mean (average) load it held, in grams?
- 33.🧪 The first prototype held 140 g. After the team improved it, the new prototype held 210 g. How many more grams did it hold?
- 34.True or false: to test it only once is poor testing. (a) False (b) True
- 35.True or false: to use the same load is good testing. (a) False (b) True
- 36.🔍 Which is the odd one out? (a) change lots at once (b) test it only once (c) repeat each test (d) skip writing results
- 37.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 38.True or false: to change lots at once is poor testing. (a) False (b) True
- 39.🧪 The first prototype held 120 g. After the team improved it, the new prototype held 240 g. How many more grams did it hold?
- 40.🧪 A paper bridge was tested three times. It held 270 g, 240 g and 300 g. What is the mean (average) load it held, in grams?
Answer key
- read the challenge rules
- 140
- False
- 160
- build it with straws
- good testing
- use the same load
- to get reliable results
- use a new load each time
- 30
- good testing
- one
- 300
- to test ideas cheaply
- design B
- good testing
- 20
- an early test model
- good testing
- False
- 310
- load it with coins
- build it with straws
- False
- design C
- design C
- design B
- build it with straws
- False
- strengthen the weak part
- 70
- 150
- 70
- True
- True
- repeat each test
- poor testing
- True
- 120
- 270
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids