Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, what comes right after “load it with coins”? (a) build it with straws (b) sketch three ideas (c) read the challenge rules (d) strengthen the weak part
- 2.🔍 Which is the odd one out? (a) change lots at once (b) repeat each test (c) record every result (d) change only one thing
- 3.True or false: to measure the same way is poor testing. (a) True (b) False
- 4.🔍 Which is the odd one out? (a) use the same load (b) repeat each test (c) change only one thing (d) use a new load each time
- 5.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 6.🔍 Which is the odd one out? (a) record every result (b) guess, do not measure (c) change only one thing (d) repeat each test
- 7.🔍 Which is the odd one out? (a) hide a failed test (b) change lots at once (c) skip writing results (d) repeat each test
- 8.True or false: to repeat each test is good testing. (a) False (b) True
- 9.🧪 Is it good or poor testing to record every result? (a) good testing (b) poor testing
- 10.🔍 Which is the odd one out? (a) use a new load each time (b) change only one thing (c) hide a failed test (d) change lots at once
- 11.🧪 The first prototype held 110 g. After the team improved it, the new prototype held 210 g. How many more grams did it hold?
- 12.🧪 Three prototype bridges were tested with the same method. Design A held 260 g, design B held 310 g and design C held 210 g. Which design was the weakest? (a) design A (b) design C (c) design B
- 13.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 14.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) sketch three ideas (b) read the challenge rules (c) strengthen the weak part (d) build it with straws
- 15.🧪 A paper bridge was tested three times. It held 430 g, 310 g and 250 g. What is the mean (average) load it held, in grams?
- 16.🧪 Is it good or poor testing to measure the same way? (a) good testing (b) poor testing
- 17.🧪 A paper bridge was tested three times. It held 340 g, 200 g and 300 g. What is the mean (average) load it held, in grams?
- 18.True or false: to change only one thing is good testing. (a) False (b) True
- 19.🧪 The first prototype held 220 g. After the team improved it, the new prototype held 250 g. How many more grams did it hold?
- 20.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 200 g. How many more grams did it hold?
- 21.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to decorate a room (c) to test ideas cheaply (d) to sell them at once
- 22.🧪 Is it good or poor testing to repeat each test? (a) good testing (b) poor testing
- 23.🧪 The first prototype held 250 g. After the team improved it, the new prototype held 450 g. How many more grams did it hold?
- 24.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “strengthen the weak part”? (a) sketch three ideas (b) strengthen the weak part
- 25.🧪 A paper bridge was tested three times. It held 230 g, 150 g and 70 g. What is the mean (average) load it held, in grams?
- 26.True or false: to use a new load each time is good testing. (a) False (b) True
- 27.🧪 The first prototype held 70 g. After the team improved it, the new prototype held 240 g. How many more grams did it hold?
- 28.True or false: to measure the same way is good testing. (a) False (b) True
- 29.🔢 To build and test a straw bridge, what comes right after “build it with straws”? (a) load it with coins (b) choose and draw one (c) read the challenge rules (d) strengthen the weak part
- 30.🔢 To build and test a straw bridge, which is the LAST step? (a) choose and draw one (b) sketch three ideas (c) strengthen the weak part (d) read the challenge rules
- 31.🧪 A paper bridge was tested three times. It held 220 g, 200 g and 180 g. What is the mean (average) load it held, in grams?
- 32.🧪 Three prototype bridges were tested with the same method. Design A held 340 g, design B held 290 g and design C held 240 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 33.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “build it with straws”? (a) build it with straws (b) sketch three ideas
- 34.🧪 The first prototype held 220 g. After the team improved it, the new prototype held 320 g. How many more grams did it hold?
- 35.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 360 g. How many more grams did it hold?
- 36.🧪 The first prototype held 140 g. After the team improved it, the new prototype held 200 g. How many more grams did it hold?
- 37.🧪 The first prototype held 130 g. After the team improved it, the new prototype held 290 g. How many more grams did it hold?
- 38.True or false: to hide a failed test is good testing. (a) True (b) False
- 39.🧪 Three prototype bridges were tested with the same method. Design A held 270 g, design B held 320 g and design C held 370 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 40.🧪 Why repeat a test three times? (a) the first is wrong (b) it looks busy (c) to get reliable results (d) to use more paper
Answer key
- strengthen the weak part
- change lots at once
- False
- use a new load each time
- good testing
- guess, do not measure
- repeat each test
- True
- good testing
- change only one thing
- 100
- design C
- poor testing
- build it with straws
- 330
- good testing
- 280
- True
- 30
- 100
- to test ideas cheaply
- good testing
- 200
- sketch three ideas
- 150
- False
- 170
- True
- load it with coins
- strengthen the weak part
- 200
- design C
- sketch three ideas
- 100
- 80
- 60
- 160
- False
- design C
- to get reliable results