Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🧪 A paper bridge was tested three times. It held 320 g, 270 g and 370 g. What is the mean (average) load it held, in grams?
- 2.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) choose and draw one (b) strengthen the weak part (c) load it with coins (d) sketch three ideas
- 3.🔢 To build and test a straw bridge, which is the FIRST step? (a) build it with straws (b) load it with coins (c) read the challenge rules (d) strengthen the weak part
- 4.True or false: to use the same load is good testing. (a) False (b) True
- 5.🧪 A paper bridge was tested three times. It held 360 g, 210 g and 240 g. What is the mean (average) load it held, in grams?
- 6.🧪 Three prototype bridges were tested with the same method. Design A held 170 g, design B held 220 g and design C held 270 g. Which design was the weakest? (a) design A (b) design C (c) design B
- 7.🧪 Is it good or poor testing to skip writing results? (a) good testing (b) poor testing
- 8.🔢 To build and test a straw bridge, which is the LAST step? (a) build it with straws (b) read the challenge rules (c) strengthen the weak part (d) choose and draw one
- 9.🧪 Is it good or poor testing to use the same load? (a) poor testing (b) good testing
- 10.True or false: to change only one thing is poor testing. (a) False (b) True
- 11.True or false: to repeat each test is good testing. (a) True (b) False
- 12.🧪 A paper bridge was tested three times. It held 420 g, 310 g and 320 g. What is the mean (average) load it held, in grams?
- 13.True or false: to measure the same way is good testing. (a) True (b) False
- 14.🧪 Is it good or poor testing to record every result? (a) good testing (b) poor testing
- 15.🧪 The first prototype held 200 g. After the team improved it, the new prototype held 270 g. How many more grams did it hold?
- 16.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) build it with straws (b) strengthen the weak part (c) read the challenge rules (d) choose and draw one
- 17.🧪 In a fair test, how many things do you change at a time? (a) two (b) none (c) one (d) all of them
- 18.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 19.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to test ideas cheaply (c) to decorate a room (d) to sell them at once
- 20.🧪 Is it good or poor testing to change lots at once? (a) poor testing (b) good testing
- 21.🧪 Three prototype bridges were tested with the same method. Design A held 230 g, design B held 280 g and design C held 330 g. Which design was the strongest? (a) design B (b) design A (c) design C
- 22.🧪 Why repeat a test three times? (a) it looks busy (b) to get reliable results (c) to use more paper (d) the first is wrong
- 23.🧪 The first prototype held 180 g. After the team improved it, the new prototype held 260 g. How many more grams did it hold?
- 24.🔢 To build and test a straw bridge, what comes right after “load it with coins”? (a) strengthen the weak part (b) sketch three ideas (c) build it with straws (d) read the challenge rules
- 25.🔍 Which is the odd one out? (a) test it only once (b) repeat each test (c) change only one thing (d) use the same load
- 26.True or false: to guess, do not measure is good testing. (a) True (b) False
- 27.🔍 Which is the odd one out? (a) use a new load each time (b) change lots at once (c) measure the same way (d) hide a failed test
- 28.🔍 Which is the odd one out? (a) change only one thing (b) test it only once (c) skip writing results (d) hide a failed test
- 29.🧪 What is a prototype? (a) an early test model (b) a broken part (c) the final product (d) a sales poster
- 30.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “load it with coins”? (a) sketch three ideas (b) load it with coins
- 31.🧪 Three prototype bridges were tested with the same method. Design A held 170 g, design B held 270 g and design C held 220 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 32.True or false: to record every result is poor testing. (a) True (b) False
- 33.🔍 Which is the odd one out? (a) guess, do not measure (b) measure the same way (c) change only one thing (d) use the same load
- 34.🧪 The first prototype held 50 g. After the team improved it, the new prototype held 60 g. How many more grams did it hold?
- 35.🧪 A paper bridge was tested three times. It held 310 g, 190 g and 160 g. What is the mean (average) load it held, in grams?
- 36.🧪 The first prototype held 140 g. After the team improved it, the new prototype held 180 g. How many more grams did it hold?
- 37.🧪 The first prototype held 110 g. After the team improved it, the new prototype held 180 g. How many more grams did it hold?
- 38.🔍 Which is the odd one out? (a) guess, do not measure (b) repeat each test (c) test it only once (d) skip writing results
- 39.🧪 A paper bridge was tested three times. It held 380 g, 300 g and 220 g. What is the mean (average) load it held, in grams?
- 40.🧪 A paper bridge was tested three times. It held 250 g, 180 g and 320 g. What is the mean (average) load it held, in grams?
Answer key
- 320
- sketch three ideas
- read the challenge rules
- True
- 270
- design A
- poor testing
- strengthen the weak part
- good testing
- False
- True
- 350
- True
- good testing
- 70
- choose and draw one
- one
- poor testing
- to test ideas cheaply
- poor testing
- design C
- to get reliable results
- 80
- strengthen the weak part
- test it only once
- False
- measure the same way
- change only one thing
- an early test model
- sketch three ideas
- design A
- False
- guess, do not measure
- 10
- 220
- 40
- 70
- repeat each test
- 300
- 250