Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 300 g. How many more grams did it hold?
- 2.🧪 What is a prototype? (a) a sales poster (b) the final product (c) a broken part (d) an early test model
- 3.🔍 Which is the odd one out? (a) guess, do not measure (b) skip writing results (c) use a new load each time (d) use the same load
- 4.🧪 A paper bridge was tested three times. It held 250 g, 170 g and 210 g. What is the mean (average) load it held, in grams?
- 5.🔍 Which is the odd one out? (a) measure the same way (b) use the same load (c) change only one thing (d) use a new load each time
- 6.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) sketch three ideas (b) strengthen the weak part
- 7.True or false: to test it only once is good testing. (a) True (b) False
- 8.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “read the challenge rules”? (a) build it with straws (b) read the challenge rules
- 9.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 10.🧪 Three prototype bridges were tested with the same method. Design A held 110 g, design B held 160 g and design C held 210 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 11.🧪 A paper bridge was tested three times. It held 220 g, 210 g and 230 g. What is the mean (average) load it held, in grams?
- 12.🧪 Three prototype bridges were tested with the same method. Design A held 210 g, design B held 110 g and design C held 160 g. Which design was the weakest? (a) design A (b) design C (c) design B
- 13.🧪 The first prototype held 60 g. After the team improved it, the new prototype held 120 g. How many more grams did it hold?
- 14.🧪 Why do engineers make prototypes? (a) to sell them at once (b) to decorate a room (c) to avoid testing (d) to test ideas cheaply
- 15.🧪 A paper bridge was tested three times. It held 350 g, 340 g and 360 g. What is the mean (average) load it held, in grams?
- 16.🧪 The first prototype held 130 g. After the team improved it, the new prototype held 270 g. How many more grams did it hold?
- 17.🧪 A paper bridge was tested three times. It held 420 g, 290 g and 310 g. What is the mean (average) load it held, in grams?
- 18.True or false: to guess, do not measure is poor testing. (a) True (b) False
- 19.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) read the challenge rules (b) choose and draw one (c) load it with coins (d) strengthen the weak part
- 20.🧪 A paper bridge was tested three times. It held 280 g, 140 g and 210 g. What is the mean (average) load it held, in grams?
- 21.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) strengthen the weak part (b) sketch three ideas (c) choose and draw one (d) build it with straws
- 22.🔍 Which is the odd one out? (a) use a new load each time (b) guess, do not measure (c) measure the same way (d) hide a failed test
- 23.🧪 Three prototype bridges were tested with the same method. Design A held 180 g, design B held 280 g and design C held 230 g. Which design was the strongest? (a) design C (b) design A (c) design B
- 24.🧪 The first prototype held 280 g. After the team improved it, the new prototype held 370 g. How many more grams did it hold?
- 25.True or false: to repeat each test is good testing. (a) True (b) False
- 26.True or false: to use the same load is good testing. (a) True (b) False
- 27.🧪 The first prototype held 140 g. After the team improved it, the new prototype held 310 g. How many more grams did it hold?
- 28.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 29.🔢 To build and test a straw bridge, which comes first: “read the challenge rules” or “strengthen the weak part”? (a) strengthen the weak part (b) read the challenge rules
- 30.True or false: to guess, do not measure is good testing. (a) False (b) True
- 31.True or false: to measure the same way is good testing. (a) True (b) False
- 32.🔍 Which is the odd one out? (a) guess, do not measure (b) record every result (c) hide a failed test (d) skip writing results
- 33.🔍 Which is the odd one out? (a) skip writing results (b) guess, do not measure (c) change lots at once (d) repeat each test
- 34.🧪 A paper bridge was tested three times. It held 280 g, 260 g and 300 g. What is the mean (average) load it held, in grams?
- 35.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 36.🧪 Is it good or poor testing to use a new load each time? (a) good testing (b) poor testing
- 37.🧪 Is it good or poor testing to record every result? (a) good testing (b) poor testing
- 38.True or false: to change lots at once is poor testing. (a) False (b) True
- 39.🔢 To build and test a straw bridge, which is the LAST step? (a) strengthen the weak part (b) read the challenge rules (c) build it with straws (d) choose and draw one
- 40.True or false: to record every result is poor testing. (a) True (b) False
Answer key
- 200
- an early test model
- use the same load
- 210
- use a new load each time
- sketch three ideas
- False
- read the challenge rules
- good testing
- design C
- 220
- design B
- 60
- to test ideas cheaply
- 350
- 140
- 340
- True
- choose and draw one
- 210
- sketch three ideas
- measure the same way
- design B
- 90
- True
- True
- 170
- good testing
- read the challenge rules
- False
- True
- record every result
- repeat each test
- 280
- poor testing
- poor testing
- good testing
- True
- strengthen the weak part
- False
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids