Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, which is the LAST step? (a) sketch three ideas (b) build it with straws (c) choose and draw one (d) strengthen the weak part
- 2.True or false: to record every result is poor testing. (a) True (b) False
- 3.🔍 Which is the odd one out? (a) record every result (b) change only one thing (c) use the same load (d) use a new load each time
- 4.🔍 Which is the odd one out? (a) change lots at once (b) repeat each test (c) use the same load (d) record every result
- 5.🔍 Which is the odd one out? (a) repeat each test (b) measure the same way (c) use the same load (d) skip writing results
- 6.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 7.🔍 Which is the odd one out? (a) measure the same way (b) test it only once (c) hide a failed test (d) guess, do not measure
- 8.🔢 To build and test a straw bridge, which comes first: “build it with straws” or “choose and draw one”? (a) build it with straws (b) choose and draw one
- 9.🧪 Is it good or poor testing to guess, do not measure? (a) poor testing (b) good testing
- 10.🧪 The first prototype held 50 g. After the team improved it, the new prototype held 180 g. How many more grams did it hold?
- 11.🧪 Three prototype bridges were tested with the same method. Design A held 220 g, design B held 170 g and design C held 120 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 12.🧪 A paper bridge was tested three times. It held 300 g, 250 g and 350 g. What is the mean (average) load it held, in grams?
- 13.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 14.True or false: to repeat each test is good testing. (a) False (b) True
- 15.🧪 Three prototype bridges were tested with the same method. Design A held 140 g, design B held 240 g and design C held 190 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 16.🔍 Which is the odd one out? (a) measure the same way (b) guess, do not measure (c) repeat each test (d) record every result
- 17.🔢 To build and test a straw bridge, what comes right after “load it with coins”? (a) strengthen the weak part (b) choose and draw one (c) sketch three ideas (d) build it with straws
- 18.🧪 In a fair test, how many things do you change at a time? (a) none (b) one (c) two (d) all of them
- 19.🔍 Which is the odd one out? (a) repeat each test (b) guess, do not measure (c) test it only once (d) use a new load each time
- 20.🔍 Which is the odd one out? (a) test it only once (b) skip writing results (c) use a new load each time (d) change only one thing
- 21.🧪 Why do engineers make prototypes? (a) to decorate a room (b) to test ideas cheaply (c) to sell them at once (d) to avoid testing
- 22.True or false: to record every result is good testing. (a) True (b) False
- 23.🧪 What is a prototype? (a) the final product (b) an early test model (c) a sales poster (d) a broken part
- 24.🧪 Why repeat a test three times? (a) the first is wrong (b) to use more paper (c) it looks busy (d) to get reliable results
- 25.True or false: to skip writing results is good testing. (a) True (b) False
- 26.🧪 A paper bridge was tested three times. It held 210 g, 120 g and 120 g. What is the mean (average) load it held, in grams?
- 27.True or false: to skip writing results is poor testing. (a) True (b) False
- 28.🧪 The first prototype held 270 g. After the team improved it, the new prototype held 360 g. How many more grams did it hold?
- 29.🧪 Is it good or poor testing to use the same load? (a) poor testing (b) good testing
- 30.True or false: to guess, do not measure is poor testing. (a) True (b) False
- 31.🔢 To build and test a straw bridge, what comes right after “build it with straws”? (a) sketch three ideas (b) strengthen the weak part (c) load it with coins (d) read the challenge rules
- 32.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) sketch three ideas (b) strengthen the weak part
- 33.True or false: to change lots at once is poor testing. (a) False (b) True
- 34.🔍 Which is the odd one out? (a) hide a failed test (b) use the same load (c) record every result (d) change only one thing
- 35.True or false: to hide a failed test is poor testing. (a) True (b) False
- 36.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) load it with coins (b) sketch three ideas (c) build it with straws (d) read the challenge rules
- 37.🧪 Three prototype bridges were tested with the same method. Design A held 290 g, design B held 390 g and design C held 340 g. Which design was the strongest? (a) design A (b) design C (c) design B
- 38.True or false: to use a new load each time is good testing. (a) True (b) False
- 39.🧪 The first prototype held 260 g. After the team improved it, the new prototype held 340 g. How many more grams did it hold?
- 40.🧪 A paper bridge was tested three times. It held 360 g, 230 g and 190 g. What is the mean (average) load it held, in grams?
Answer key
- strengthen the weak part
- False
- use a new load each time
- change lots at once
- skip writing results
- poor testing
- measure the same way
- choose and draw one
- poor testing
- 130
- design C
- 300
- good testing
- True
- design A
- guess, do not measure
- strengthen the weak part
- one
- repeat each test
- change only one thing
- to test ideas cheaply
- True
- an early test model
- to get reliable results
- False
- 150
- True
- 90
- good testing
- True
- load it with coins
- sketch three ideas
- True
- hide a failed test
- True
- build it with straws
- design B
- False
- 80
- 260
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids