Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, what comes right after “read the challenge rules”? (a) sketch three ideas (b) choose and draw one (c) build it with straws (d) strengthen the weak part
- 2.🔍 Which is the odd one out? (a) guess, do not measure (b) change only one thing (c) change lots at once (d) skip writing results
- 3.🧪 What is a prototype? (a) a broken part (b) the final product (c) a sales poster (d) an early test model
- 4.🧪 Is it good or poor testing to skip writing results? (a) poor testing (b) good testing
- 5.True or false: to use the same load is good testing. (a) False (b) True
- 6.🧪 In a fair test, how many things do you change at a time? (a) all of them (b) none (c) two (d) one
- 7.🧪 Three prototype bridges were tested with the same method. Design A held 330 g, design B held 380 g and design C held 280 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 8.🔍 Which is the odd one out? (a) change lots at once (b) hide a failed test (c) guess, do not measure (d) record every result
- 9.🧪 The first prototype held 80 g. After the team improved it, the new prototype held 240 g. How many more grams did it hold?
- 10.🧪 Is it good or poor testing to record every result? (a) good testing (b) poor testing
- 11.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 12.🔍 Which is the odd one out? (a) measure the same way (b) use the same load (c) repeat each test (d) change lots at once
- 13.🧪 Is it good or poor testing to test it only once? (a) poor testing (b) good testing
- 14.🧪 Is it good or poor testing to use a new load each time? (a) good testing (b) poor testing
- 15.🧪 Why repeat a test three times? (a) it looks busy (b) to use more paper (c) the first is wrong (d) to get reliable results
- 16.🧪 Is it good or poor testing to hide a failed test? (a) poor testing (b) good testing
- 17.True or false: to use a new load each time is good testing. (a) False (b) True
- 18.🧪 The first prototype held 220 g. After the team improved it, the new prototype held 420 g. How many more grams did it hold?
- 19.🧪 A paper bridge was tested three times. It held 310 g, 190 g and 370 g. What is the mean (average) load it held, in grams?
- 20.🧪 Three prototype bridges were tested with the same method. Design A held 200 g, design B held 150 g and design C held 250 g. Which design was the weakest? (a) design A (b) design C (c) design B
- 21.True or false: to change only one thing is poor testing. (a) True (b) False
- 22.True or false: to guess, do not measure is good testing. (a) False (b) True
- 23.🧪 A paper bridge was tested three times. It held 200 g, 120 g and 130 g. What is the mean (average) load it held, in grams?
- 24.🔍 Which is the odd one out? (a) change only one thing (b) use a new load each time (c) repeat each test (d) use the same load
- 25.🧪 A paper bridge was tested three times. It held 300 g, 180 g and 150 g. What is the mean (average) load it held, in grams?
- 26.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) build it with straws (b) sketch three ideas (c) load it with coins (d) read the challenge rules
- 27.🧪 Is it good or poor testing to repeat each test? (a) poor testing (b) good testing
- 28.🧪 The first prototype held 210 g. After the team improved it, the new prototype held 330 g. How many more grams did it hold?
- 29.True or false: to test it only once is poor testing. (a) True (b) False
- 30.🧪 The first prototype held 60 g. After the team improved it, the new prototype held 150 g. How many more grams did it hold?
- 31.🧪 Why do engineers make prototypes? (a) to avoid testing (b) to sell them at once (c) to test ideas cheaply (d) to decorate a room
- 32.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 33.True or false: to use the same load is poor testing. (a) False (b) True
- 34.🧪 Three prototype bridges were tested with the same method. Design A held 390 g, design B held 290 g and design C held 340 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 35.True or false: to change lots at once is poor testing. (a) True (b) False
- 36.🧪 A paper bridge was tested three times. It held 330 g, 180 g and 330 g. What is the mean (average) load it held, in grams?
- 37.🔢 To build and test a straw bridge, what comes right after “sketch three ideas”? (a) choose and draw one (b) strengthen the weak part (c) build it with straws (d) read the challenge rules
- 38.🔍 Which is the odd one out? (a) measure the same way (b) use a new load each time (c) guess, do not measure (d) hide a failed test
- 39.🧪 The first prototype held 120 g. After the team improved it, the new prototype held 310 g. How many more grams did it hold?
- 40.🧪 A paper bridge was tested three times. It held 350 g, 230 g and 410 g. What is the mean (average) load it held, in grams?
Answer key
- sketch three ideas
- change only one thing
- an early test model
- poor testing
- True
- one
- design B
- record every result
- 160
- good testing
- good testing
- change lots at once
- poor testing
- poor testing
- to get reliable results
- poor testing
- False
- 200
- 290
- design B
- False
- False
- 150
- use a new load each time
- 210
- build it with straws
- good testing
- 120
- True
- 90
- to test ideas cheaply
- poor testing
- False
- design B
- True
- 280
- choose and draw one
- measure the same way
- 190
- 330
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids