Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.🔢 To build and test a straw bridge, which comes first: “strengthen the weak part” or “sketch three ideas”? (a) sketch three ideas (b) strengthen the weak part
- 2.🔍 Which is the odd one out? (a) measure the same way (b) change only one thing (c) repeat each test (d) test it only once
- 3.🧪 Is it good or poor testing to test it only once? (a) good testing (b) poor testing
- 4.🧪 Why do engineers make prototypes? (a) to test ideas cheaply (b) to avoid testing (c) to decorate a room (d) to sell them at once
- 5.True or false: to use a new load each time is poor testing. (a) False (b) True
- 6.🧪 Is it good or poor testing to guess, do not measure? (a) good testing (b) poor testing
- 7.True or false: to change only one thing is good testing. (a) True (b) False
- 8.🔢 To build and test a straw bridge, which is the LAST step? (a) strengthen the weak part (b) choose and draw one (c) build it with straws (d) sketch three ideas
- 9.🔢 To build and test a straw bridge, which comes first: “choose and draw one” or “read the challenge rules”? (a) choose and draw one (b) read the challenge rules
- 10.🧪 A paper bridge was tested three times. It held 240 g, 240 g and 240 g. What is the mean (average) load it held, in grams?
- 11.🔍 Which is the odd one out? (a) skip writing results (b) test it only once (c) measure the same way (d) guess, do not measure
- 12.🔢 To build and test a straw bridge, what comes right after “build it with straws”? (a) sketch three ideas (b) strengthen the weak part (c) load it with coins (d) read the challenge rules
- 13.🧪 Three prototype bridges were tested with the same method. Design A held 310 g, design B held 260 g and design C held 360 g. Which design was the strongest? (a) design A (b) design B (c) design C
- 14.🧪 A paper bridge was tested three times. It held 240 g, 220 g and 230 g. What is the mean (average) load it held, in grams?
- 15.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “build it with straws”? (a) sketch three ideas (b) build it with straws
- 16.🔢 To build and test a straw bridge, which comes first: “choose and draw one” or “load it with coins”? (a) choose and draw one (b) load it with coins
- 17.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 18.True or false: to repeat each test is good testing. (a) False (b) True
- 19.True or false: to measure the same way is good testing. (a) True (b) False
- 20.🧪 Is it good or poor testing to repeat each test? (a) poor testing (b) good testing
- 21.🧪 Is it good or poor testing to skip writing results? (a) good testing (b) poor testing
- 22.🔍 Which is the odd one out? (a) change lots at once (b) skip writing results (c) guess, do not measure (d) change only one thing
- 23.True or false: to guess, do not measure is poor testing. (a) False (b) True
- 24.🧪 A paper bridge was tested three times. It held 230 g, 110 g and 140 g. What is the mean (average) load it held, in grams?
- 25.🧪 Is it good or poor testing to measure the same way? (a) poor testing (b) good testing
- 26.🧪 In a fair test, how many things do you change at a time? (a) one (b) all of them (c) two (d) none
- 27.🔍 Which is the odd one out? (a) repeat each test (b) use the same load (c) change only one thing (d) guess, do not measure
- 28.🧪 What is a prototype? (a) a broken part (b) an early test model (c) the final product (d) a sales poster
- 29.True or false: to measure the same way is poor testing. (a) False (b) True
- 30.True or false: to hide a failed test is poor testing. (a) False (b) True
- 31.🧪 Why repeat a test three times? (a) the first is wrong (b) to use more paper (c) it looks busy (d) to get reliable results
- 32.🧪 Three prototype bridges were tested with the same method. Design A held 200 g, design B held 150 g and design C held 250 g. Which design was the weakest? (a) design A (b) design B (c) design C
- 33.🔢 To build and test a straw bridge, which comes first: “read the challenge rules” or “build it with straws”? (a) build it with straws (b) read the challenge rules
- 34.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “choose and draw one”? (a) sketch three ideas (b) choose and draw one
- 35.🧪 The first prototype held 70 g. After the team improved it, the new prototype held 100 g. How many more grams did it hold?
- 36.🔢 To build and test a straw bridge, which comes first: “load it with coins” or “strengthen the weak part”? (a) strengthen the weak part (b) load it with coins
- 37.🧪 The first prototype held 160 g. After the team improved it, the new prototype held 190 g. How many more grams did it hold?
- 38.🧪 A paper bridge was tested three times. It held 260 g, 160 g and 360 g. What is the mean (average) load it held, in grams?
- 39.🧪 A paper bridge was tested three times. It held 300 g, 250 g and 260 g. What is the mean (average) load it held, in grams?
- 40.🧪 Three prototype bridges were tested with the same method. Design A held 400 g, design B held 350 g and design C held 300 g. Which design was the strongest? (a) design A (b) design B (c) design C
Answer key
- sketch three ideas
- test it only once
- poor testing
- to test ideas cheaply
- True
- poor testing
- True
- strengthen the weak part
- read the challenge rules
- 240
- measure the same way
- load it with coins
- design C
- 230
- sketch three ideas
- choose and draw one
- poor testing
- True
- True
- good testing
- poor testing
- change only one thing
- True
- 160
- good testing
- one
- guess, do not measure
- an early test model
- False
- True
- to get reliable results
- design B
- read the challenge rules
- sketch three ideas
- 30
- load it with coins
- 30
- 260
- 270
- design A
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids