Engineering Worksheet: Prototypes and Fair Tests
Engineer's tip (Test fairly, record honestly): Prototype = an early model made to test an idea. Fair test: change one thing, keep the rest the same, measure and record every result. Mean of three tests = (first + second + third) ÷ 3.
NameDateTime takenScore ___ / 40
- 1.True or false: to record every result is good testing. (a) False (b) True
- 2.True or false: to use the same load is poor testing. (a) True (b) False
- 3.True or false: to hide a failed test is good testing. (a) True (b) False
- 4.🧪 Three prototype bridges were tested with the same method. Design A held 130 g, design B held 180 g and design C held 230 g. Which design was the strongest? (a) design C (b) design B (c) design A
- 5.🧪 A paper bridge was tested three times. It held 380 g, 300 g and 280 g. What is the mean (average) load it held, in grams?
- 6.🧪 The first prototype held 190 g. After the team improved it, the new prototype held 260 g. How many more grams did it hold?
- 7.🔍 Which is the odd one out? (a) record every result (b) use a new load each time (c) hide a failed test (d) change lots at once
- 8.🔍 Which is the odd one out? (a) guess, do not measure (b) measure the same way (c) record every result (d) change only one thing
- 9.🧪 Is it good or poor testing to change lots at once? (a) good testing (b) poor testing
- 10.True or false: to change only one thing is good testing. (a) False (b) True
- 11.🧪 Is it good or poor testing to hide a failed test? (a) good testing (b) poor testing
- 12.🧪 The first prototype held 250 g. After the team improved it, the new prototype held 390 g. How many more grams did it hold?
- 13.🧪 A paper bridge was tested three times. It held 320 g, 240 g and 190 g. What is the mean (average) load it held, in grams?
- 14.🔍 Which is the odd one out? (a) use a new load each time (b) measure the same way (c) change only one thing (d) record every result
- 15.🧪 A paper bridge was tested three times. It held 270 g, 180 g and 300 g. What is the mean (average) load it held, in grams?
- 16.🔢 To build and test a straw bridge, what comes right after “choose and draw one”? (a) build it with straws (b) load it with coins (c) read the challenge rules (d) strengthen the weak part
- 17.🔢 To build and test a straw bridge, which is the LAST step? (a) strengthen the weak part (b) choose and draw one (c) load it with coins (d) read the challenge rules
- 18.🔍 Which is the odd one out? (a) skip writing results (b) test it only once (c) use a new load each time (d) measure the same way
- 19.True or false: to hide a failed test is poor testing. (a) False (b) True
- 20.🧪 Three prototype bridges were tested with the same method. Design A held 210 g, design B held 110 g and design C held 160 g. Which design was the strongest? (a) design C (b) design A (c) design B
- 21.True or false: to measure the same way is poor testing. (a) True (b) False
- 22.🧪 The first prototype held 240 g. After the team improved it, the new prototype held 290 g. How many more grams did it hold?
- 23.🧪 Why do engineers make prototypes? (a) to decorate a room (b) to avoid testing (c) to sell them at once (d) to test ideas cheaply
- 24.🔍 Which is the odd one out? (a) use the same load (b) measure the same way (c) hide a failed test (d) change only one thing
- 25.True or false: to repeat each test is good testing. (a) True (b) False
- 26.🧪 Is it good or poor testing to change only one thing? (a) poor testing (b) good testing
- 27.🧪 Three prototype bridges were tested with the same method. Design A held 280 g, design B held 380 g and design C held 330 g. Which design was the weakest? (a) design B (b) design A (c) design C
- 28.True or false: to change lots at once is good testing. (a) False (b) True
- 29.🧪 What is a prototype? (a) a broken part (b) an early test model (c) a sales poster (d) the final product
- 30.🧪 Why repeat a test three times? (a) it looks busy (b) the first is wrong (c) to use more paper (d) to get reliable results
- 31.🔢 To build and test a straw bridge, which comes first: “sketch three ideas” or “strengthen the weak part”? (a) sketch three ideas (b) strengthen the weak part
- 32.🧪 Three prototype bridges were tested with the same method. Design A held 260 g, design B held 160 g and design C held 210 g. Which design was the weakest? (a) design B (b) design C (c) design A
- 33.🧪 The first prototype held 100 g. After the team improved it, the new prototype held 270 g. How many more grams did it hold?
- 34.🧪 In a fair test, how many things do you change at a time? (a) one (b) none (c) two (d) all of them
- 35.🧪 A paper bridge was tested three times. It held 370 g, 260 g and 300 g. What is the mean (average) load it held, in grams?
- 36.🧪 Is it good or poor testing to use a new load each time? (a) good testing (b) poor testing
- 37.True or false: to record every result is poor testing. (a) False (b) True
- 38.🧪 Is it good or poor testing to guess, do not measure? (a) good testing (b) poor testing
- 39.True or false: to guess, do not measure is good testing. (a) False (b) True
- 40.🧪 Is it good or poor testing to measure the same way? (a) good testing (b) poor testing
Answer key
- True
- False
- False
- design C
- 320
- 70
- record every result
- guess, do not measure
- poor testing
- True
- poor testing
- 140
- 250
- use a new load each time
- 250
- build it with straws
- strengthen the weak part
- measure the same way
- True
- design A
- False
- 50
- to test ideas cheaply
- hide a failed test
- True
- good testing
- design A
- False
- an early test model
- to get reliable results
- sketch three ideas
- design B
- 170
- one
- 310
- poor testing
- False
- poor testing
- False
- good testing
Free engineering lessons, practice and worksheets at talentjr.in/engineering-for-kids