Practice Set 7.3 Class 8 Answers Chapter 7 Variation Maharashtra Board

Balbharti Maharashtra State Board Class 8 Maths Solutions covers the Practice Set 7.3 8th Std Maths Answers Solutions Chapter 7 Variation.

Variation Class 8 Maths Chapter 7 Practice Set 7.3 Solutions Maharashtra Board

Std 8 Maths Practice Set 7.3 Chapter 7 Solutions Answers

Question 1.
Which of the following statements are of inverse variation?
i. Number of workers on a job and time taken by them to complete the job.
ii. Number of pipes of same size to fill a tank and the time taken by them to fill the tank.
iii. Petrol filled in the tank of a vehicle and its cost.
iv. Area of circle and its radius.
Solution:
i. Let, x represent number of workers on a job, and y represent time taken by workers to complete the job.
As the number of workers increases, the time required to complete the job decreases.
∴ \(x \propto \frac{1}{y}\)

ii. Let, n represent number of pipes of same size to fill a tank and t represent time taken by the pipes to fill the tank.
As the number of pipes increases, the time required to fill the tank decreases.
∴ \(\mathrm{n} \propto \frac{1}{\mathrm{t}}\)

iii. Let, p represent the quantity of petrol filled in a tank and c represent the cost of the petrol.
As the quantity of petrol in the tank increases, its cost increases.
∴ p ∝ c

iv. Let, A represent the area of the circle and r represent its radius.
As the area of circle increases, its radius increases.
∴ A ∝ r
∴ Statements (i) and (ii) are examples of inverse variation.

Question 2.
If 15 workers can build a wall in 48 hours, how many workers will be required to do the same work in 30 hours?
Solution:
Let, n represent the number of workers building the wall and t represent the time required.
Since, the number of workers varies inversely with the time required to build the wall.
∴ \(\mathrm{n} \propto \frac{1}{\mathrm{t}}\)
∴ \(\mathrm{n}=\mathrm{k} \times \frac{1}{\mathrm{t}}\)
where k is the constant of variation
∴ n × t = k …(i)
15 workers can build a wall in 48 hours,
i.e., when n = 15, t = 48
∴ Substituting n = 15 and t = 48 in (i), we get
n × t = k
∴ 15 × 48 = k
∴ k = 720
Substituting k = 720 in (i), we get
n × t = k
∴ n × t = 720 …(ii)
This is the equation of variation.
Now, we have to find number of workers required to do the same work in 30 hours.
i.e., when t = 30, n = ?
∴ Substituting t = 30 in (ii), we get
n × t = 720
∴ n × 30 = 720
∴ n = \(\frac { 720 }{ 30 }\)
∴ n = 24
∴ 24 workers will be required to build the wall in 30 hours.

Question 3.
120 bags of half litre milk can be filled by a machine within 3 minutes find the time to fill such 1800 bags?
Solution:
Let b represent the number of bags of half litre milk and t represent the time required to fill the bags.
Since, the number of bags and time required to fill the bags varies directly.
∴ b ∝ t
∴ b = kt …(i)
where k is the constant of variation.
Since, 120 bags can be filled in 3 minutes
i.e., when b = 120, t = 3
∴ Substituting b = 120 and t = 3 in (i), we get
b = kt
∴ 120 = k × 3
∴ k = \(\frac { 120 }{ 3 }\)
∴ k = 40
Substituting k = 40 in (i), we get
b = kt
∴ b = 40 t …(ii)
This is the equation of variation.
Now, we have to find time required to fill 1800 bags
∴ Substituting b = 1800 in (ii), we get
b = 40 t
∴ 1800 = 40 t
∴ t = \(\frac { 1800 }{ 40 }\)
∴ t = 45
∴ 1800 bags of half litre milk can be filled by the machine in 45 minutes.

Question 4.
A car with speed 60 km/hr takes 8 hours to travel some distance. What should be the increase in the speed if the same distance is
to be covered in \(7\frac { 1 }{ 2 }\) hours?
Solution:
Let v represent the speed of car in km/hr and t represent the time required.
Since, speed of a car varies inversely as the time required to cover a distance.
∴ \(v \propto \frac{1}{t}\)
∴ \(\mathbf{v}=\mathbf{k} \times \frac{1}{\mathbf{t}}\)
where, k is the constant of variation.
∴ v × t = k …(i)
Since, a car with speed 60 km/hr takes 8 hours to travel some distance.
i.e., when v = 60, t = 8
∴ Substituting v = 60 and t = 8 in (i), we get
v × t = k
∴ 60 × 8 = t
∴ k = 480
Substituting k = 480 in (i), we get
v × t = k
∴ v × t = 480 …(ii)
This is the equation of variation.
Now, we have to find speed of car if the same distance is to be covered in \(7\frac { 1 }{ 2 }\) hours.
i.e., when t = \(7\frac { 1 }{ 2 }\) = 7.5 , v = ?
∴ Substituting, t = 7.5 in (ii), we get
v × t = 480
∴ v × 7.5 = 480
\(v=\frac{480}{7.5}=\frac{4800}{75}\)
∴ v = 64
The speed of vehicle should be 64 km/hr to cover the same distance in 7.5 hours.
∴ The increase in speed = 64 – 60
= 4km/hr
∴ The increase in speed of the car is 4 km/hr.

✨ Free AI tutor

Ask the AI tutor about Class 8 Maths Chapter 7

Stuck on a question? Type it, 🎤 speak it or 📷 snap a photo of it and get simple, step-by-step help with “Variation Practice Set 7.3” — important questions, a quick quiz, revision notes — in English, मराठी or हिंदी.

Sign in with Google to ask the AI tutor. It's free — 20 questions a day, one TalentJR account.

Sign in to ask

How the free AI tutor works →

👩‍🏫 Class 8 Maths classes near you — online or at home

Prefer a real teacher? TalentJR teachers take live online classes anywhere in India and visit homes in selected cities. Tell us what you need and our team will call you with timings and fees.

Live online classesSmall groups or 1:1 with a teacher, from home, any city.
Teacher at homeA TalentJR teacher visits your home (selected cities).
At a centreClasses at a TalentJR partner centre near you, where available.

Keep learning